# 582100326701
Unscheduled inspection
Start date: 2021-06-29, end date: 2021-07-01, duration: 2
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi, stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: verification of the completed construction of the facility, compliance with urban planning legislation, compliance of the work performed and the building materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation
# 582005284268
Unscheduled inspection
Start date: 2020-12-21, end date: —, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection:
# 582004329137
Unscheduled inspection
Start date: 2020-03-05, end date: 2020-03-06, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: perform a visual inspection of the capital construction facility and study the documents specified in p13 of the regulation on the implementation of state construction supervision in the Russian Federation approved by Decree of the Government of the Russian Federation dated February 1, 2006b period from 05032020 to 06032020
# 582004329053
Unscheduled inspection
Start date: 2020-03-05, end date: 2020-03-06, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: perform a visual inspection of the capital construction facility and study the documents specified in p13 of the regulation on the implementation of state construction supervision in the Russian Federation approved by Decree of the Government of the Russian Federation dated February 1, 2006b period from 05032020 to 06032020
# 582004364654
Unscheduled inspection
Start date: 2020-03-19, end date: —, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection:
# 582004364646
Unscheduled inspection
Start date: 2020-03-19, end date: 2020-03-23, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: Implementation of p 1 of the inspection program case number 7D1584Compliance with urban planning legislation
# 581904150427
Unscheduled inspection
Start date: 2019-12-26, end date: 2019-12-26, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: inspections of the capital construction facility completed on the basis of the notice of completion of the capital construction facility dated 18122019 1117969compliance with urban planning legislation compliance of the work and construction materials used during the construction of the reconstruction of the capital construction facility "Apartment building p8" at the address Russian Federation Penza region Penza Oktyabrsky district General Glazunov street d15 as well as the results of such work requirements technical regulations, other regulations and project documentation
# 581904150416
Unscheduled inspection
Start date: 2019-12-26, end date: 2019-12-26, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: inspections of a capital construction facility completed on the basis of a notice of completion of construction of a capital construction facility dated 18122019 1117973compliance with urban planning legislation on the compliance of work and construction materials used during the construction of the reconstruction of a capital construction facility "Apartment building PP14 with built-in non-residential premises" at the address Russian Federation Penza region Penza Oktyabrsky district General Glazunov street d3 and the results of such work meet the requirements of technical regulations, other regulations and project documentation
# 581904150409
Unscheduled inspection
Start date: 2019-12-26, end date: 2019-12-26, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: inspections of the capital construction facility completed on the basis of the notice of completion of the capital construction facility dated 18122019 1117971compliance with urban planning legislation compliance of the work and construction materials used during the construction of the reconstruction of the capital construction facility "Apartment building str9" at the address Russian Federation Penza region Penza Oktyabrsky district General Glazunov street d9 as well as the results of such work requirements technical regulations, other regulations and project documentation
# 581904150401
Unscheduled inspection
Start date: 2019-12-26, end date: 2019-12-26, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: inspections of a capital construction facility completed on the basis of a notice of completion of construction of a capital construction facility dated 18122019 1117987compliance with urban planning legislation on the compliance of work performed and building materials used during the construction of the reconstruction of a capital construction facility "Apartment building pp6 with built-in non-residential premises" at the address of the Russian Federation Penza region Penza Oktyabrsky district General Glazunov street d21 and the results of such work meet the requirements of technical regulations, other regulations and project documentation
# 581904070904
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-11, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: Implementation of the p5 inspection program case number 7 D1338compliance with urban planning legislation compliance of the work and construction materials used during the construction of the reconstruction of the capital construction facility "Apartment building str8" at the address Russian Federation Penza region Penza Oktyabrsky district General Glazunov street d15, as well as the results of such work requirements of technical regulations other regulations and project documentation
# 581903988822
Unscheduled inspection
Start date: 2019-11-21, end date: 2019-12-18, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: inspections of the completed construction of the "Multi-apartment building 1" facility at 21 Penza 65 let Pobedy Street based on the notice of completion of the capital construction facility dated 15102019 7D1330Compliance with urban planning legislation on the compliance of work and construction materials used during the construction of the reconstruction of the capital construction facility "Multi-apartment Building 1" at Penza 65 Let Street Pobedy house 21 as well as the results of such work to the requirements of technical regulations, other regulations and project documentation
# 581903883839
Unscheduled inspection
Start date: 2019-10-24, end date: 2019-10-30, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: inspections of a capital construction facility completed on the basis of the notice of completion of the capital construction facility dated 17102019 case 7D1330Compliance with urban planning legislationconformity of work performed and construction materials used during the construction of the reconstruction of the capital construction facility "Apartment building p. 1" at Penza ul. 65 let Pobedy house 21, as well as the results of such work to the requirements of technical regulations of other regulations and project documentation
# 581903639523
Unscheduled inspection
Start date: 2019-09-25, end date: 2019-09-27, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: Implementation of p 4 of the inspection program case number 7D1338Compliance with urban planning legislation
# 581902919508
Unscheduled inspection
Start date: 2019-08-05, end date: —, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection:
# 581902919487
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-07, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: To make a visual inspection of the capital construction object and analyze the documents specified in paragraph 13 of the regulations on the implementation of state construction supervision in the Russian Federation approved by the decree of the Government of the Russian Federation dated February 1, 2006 54
# 581902931713
Unscheduled inspection
Start date: 2019-08-08, end date: 2019-08-09, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: To make a visual inspection of the capital construction object and analyze the documents specified in paragraph 13 of the regulations on the implementation of state construction supervision in the Russian Federation approved by the decree of the Government of the Russian Federation dated February 1, 2006 54
# 581902931693
Unscheduled inspection
Start date: 2019-08-08, end date: —, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection:
# 581902919456
Unscheduled inspection
Start date: 2019-08-06, end date: 2019-08-08, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: To make a visual inspection of the capital construction object and analyze the documents specified in paragraph 13 of the regulations on the implementation of state construction supervision in the Russian Federation approved by the decree of the Government of the Russian Federation dated February 1, 2006 54
# 581902815376
Unscheduled inspection
Start date: 2019-06-25, end date: —, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection:
# 581902771031
Unscheduled inspection
Start date: 2019-06-06, end date: 2019-06-07, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: Implementation of p 4 of the inspection program case number 7D1304Compliance with urban planning legislation
# 581902818812
Unscheduled inspection
Start date: 2019-06-26, end date: 2019-06-28, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: To make a visual inspection of the capital construction object and analyze the documents specified in paragraph 13 of the regulations on the implementation of state construction supervision in the Russian Federation approved by the decree of the Government of the Russian Federation dated February 1, 2006 54
# 581902696521
Unscheduled inspection
Start date: 2019-05-13, end date: 2019-05-15, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: perform a visual inspection of the capital construction facility and study the documents specified in p13 of the regulations on State construction supervision in the Russian Federation approved by the Decree of the Government of the Russian Federation dated February 1, 2006
# 581902696536
Unscheduled inspection
Start date: 2019-05-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 581902696457
Unscheduled inspection
Start date: 2019-05-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 581902696530
Unscheduled inspection
Start date: 2019-05-13, end date: 2019-05-15, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: perform a visual inspection of the capital construction facility and study the documents specified in p13 of the regulations on State construction supervision in the Russian Federation approved by the Decree of the Government of the Russian Federation dated February 1, 2006
# 581902500576
Unscheduled inspection
Start date: 2019-02-13, end date: 2019-02-14, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: To carry out a visual inspection of the capital construction object and an analysis of the documents specified in paragraph 13 of the regulations on the implementation of state construction supervision in the Russian Federation approved by the decree of the Government of the Russian Federation dated February 1, 2006 54
# 581902500546
Unscheduled inspection
Start date: 2019-02-12, end date: 2019-02-14, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: pp "a" p3 ch5 st54 of the Urban Planning Code of the Russian Federation Urban Planning Code of the Russian Federation dated December 29, 2004 190FZ
# 581902519628
Unscheduled inspection
Start date: 2019-02-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 581902519667
Unscheduled inspection
Start date: 2019-02-20, end date: 2019-02-22, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: To carry out a visual inspection of the capital construction object and an analysis of the documents specified in paragraph 13 of the regulations on the implementation of state construction supervision in the Russian Federation approved by the decree of the Government of the Russian Federation dated February 1, 2006 54
# 581902435073
Unscheduled inspection
Start date: 2019-01-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 581802317465
Unscheduled inspection
Start date: 2018-12-20, end date: 2018-12-24, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: To make a visual inspection of the capital construction object and study the documents specified in paragraph 13 of the regulations on the implementation of state construction supervision in the Russian Federation approved by the decree of the Government of the Russian Federation dated February 1, 2006 54
# 581802217122
Unscheduled inspection
Start date: 2018-12-10, end date: 2018-12-12, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: To carry out a visual inspection of the capital construction object and an analysis of the documents specified in paragraph 13 of the regulations on the implementation of state construction supervision in the Russian Federation approved by the decree of the Government of the Russian Federation dated February 1, 2006 54
# 581802217103
Unscheduled inspection
Start date: 2018-12-11, end date: 2018-12-13, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: To make a visual inspection of the capital construction object and analyze the documents specified in paragraph 13 of the regulations on the implementation of state construction supervision in the Russian Federation approved by the decree of the Government of the Russian Federation dated February 1, 2006 54
# 581802128526
Unscheduled inspection
Start date: 2018-11-20, end date: 2018-12-17, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: To carry out a visual inspection of the capital construction object and an analysis of the documents specified in paragraph 13 of the regulations on the implementation of state construction supervision in the Russian Federation approved by the decree of the Government of the Russian Federation dated February 1, 2006 54
# 581801769239
Unscheduled inspection
Start date: 2018-10-02, end date: 2018-10-03, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: To make a visual inspection of the capital construction object and analyze the documents specified in paragraph 13 of the regulations on the implementation of state construction supervision in the Russian Federation approved by the decree of the Government of the Russian Federation dated February 1, 2006 54
# 581802004967
Unscheduled inspection
Start date: 2018-10-25, end date: 2018-10-29, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: To make a visual inspection of the capital construction object and study the documents specified in paragraph 13 of the regulations on the implementation of state construction supervision in the Russian Federation approved by the decree of the Government of the Russian Federation dated February 1, 2006 54
# 581801794351
Unscheduled inspection
Start date: 2018-10-03, end date: 2018-10-30, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: To carry out a visual inspection of the capital construction object and an analysis of the documents specified in paragraph 13 of the regulations on the implementation of state construction supervision in the Russian Federation approved by the decree of the Government of the Russian Federation dated February 1, 2006 54
# 581802020740
Unscheduled inspection
Start date: 2018-10-29, end date: —, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection:
# 581801982123
Unscheduled inspection
Start date: 2018-10-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 581801646009
Unscheduled inspection
Start date: 2018-09-25, end date: 2018-09-26, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: Verification of compliance with the Urban planning legislation of the Russian Federation on the basis of the notice of the beginning of construction of the reconstruction of the capital construction facility bn dated 07092018 Compliance with urban planning legislation Compliance of the work and construction materials used during the construction of the linear facility Main heating line from UTZ to microdistrict 7 of the III stage of construction of the residential area Arbekovo Penza at Penza region Penza as well as the results of such work with the requirements technical regulations, other regulations and project documentation
# 581801691377
Unscheduled inspection
Start date: 2018-09-27, end date: 2018-09-28, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: Verification of the completed capital construction facility on the basis of the notice of completion of the capital construction facility dated 21092018 Compliance with urban planning legislation Compliance with the work performed and the building materials used during the construction of the reconstruction of the capital construction facility Multi-family residential building page 3 with built-in non-residential premises stage I of construction of section IV at Penza Oktyabrsky ron mkr 7 of the 3rd stage of construction of the residential area Arbekovo, as well as the results of such work, the requirements of technical regulations, other regulations and project documentation
# 581800571099
Unscheduled inspection
Start date: 2018-07-24, end date: 2018-07-26, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: To make a visual inspection of the capital construction object and study the documents specified in paragraph 13 of the regulations on the implementation of state construction supervision in the Russian Federation approved by the decree of the Government of the Russian Federation dated February 1, 2006 54
# 581800504728
Unscheduled inspection
Start date: 2018-07-02, end date: —, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Penzenskoi oblasti
Purpose of inspection:
# 581800468576
Unscheduled inspection
Start date: 2018-06-18, end date: 2018-06-20, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: To carry out a visual inspection of the capital construction object and an analysis of the documents specified in paragraph 13 of the regulations on the implementation of state construction supervision in the Russian Federation approved by the decree of the Government of the Russian Federation dated February 1, 2006 54
# 581800494235
Unscheduled inspection
Start date: 2018-06-27, end date: 2018-06-29, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: To make a visual inspection of the capital construction object and study the documents specified in paragraph 13 of the regulations on the implementation of state construction supervision in the Russian Federation approved by the decree of the Government of the Russian Federation dated February 1, 2006 54
# 581800494227
Unscheduled inspection
Start date: 2018-06-27, end date: 2018-06-29, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: To make a visual inspection of the capital construction object and study the documents specified in paragraph 13 of the regulations on the implementation of state construction supervision in the Russian Federation approved by the decree of the Government of the Russian Federation dated February 1, 2006 54
# 581800470771
Unscheduled inspection
Start date: 2018-06-20, end date: 2018-06-22, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: To carry out a visual inspection of the capital construction object and an analysis of the documents specified in paragraph 13 of the regulations on the implementation of state construction supervision in the Russian Federation approved by the decree of the Government of the Russian Federation dated February 1, 2006 54
# 581800389251
Unscheduled inspection
Start date: 2018-05-28, end date: 2018-05-29, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: To carry out a visual inspection of the capital construction object and an analysis of the documents specified in paragraph 13 of the regulations on the implementation of state construction supervision in the Russian Federation approved by the decree of the Government of the Russian Federation dated February 1, 2006 54
# 581800387094
Unscheduled inspection
Start date: 2018-05-24, end date: 2018-05-25, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: To make a visual inspection of the capital construction object and analyze the documents specified in paragraph 13 of the regulations on the implementation of state construction supervision in the Russian Federation approved by the decree of the Government of the Russian Federation dated February 1, 2006 54
# 581800287629
Unscheduled inspection
Start date: 2018-04-16, end date: 2018-04-18, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: To carry out a visual inspection of the capital construction object and an analysis of the documents specified in paragraph 13 of the regulations on the implementation of state construction supervision in the Russian Federation approved by the decree of the Government of the Russian Federation dated February 1, 2006 54
# 581800267232
Unscheduled inspection
Start date: 2018-04-09, end date: 2018-04-11, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: To carry out a visual inspection of the capital construction object and an analysis of the documents specified in paragraph 13 of the regulations on the implementation of state construction supervision in the Russian Federation approved by the decree of the Government of the Russian Federation dated February 1, 2006 54
# 581800267219
Unscheduled inspection
Start date: 2018-04-09, end date: 2018-04-11, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: To carry out a visual inspection of the capital construction object and an analysis of the documents specified in paragraph 13 of the regulations on the implementation of state construction supervision in the Russian Federation approved by the decree of the Government of the Russian Federation dated February 1, 2006 54
# 581800267206
Unscheduled inspection
Start date: 2018-04-09, end date: 2018-04-11, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: To make a visual inspection of the capital construction object and study the documents specified in paragraph 13 of the regulations on the implementation of state construction supervision in the Russian Federation approved by the decree of the Government of the Russian Federation dated February 1, 2006 54
# 581800229131
Unscheduled inspection
Start date: 2018-03-19, end date: 2018-03-23, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: Verification of the execution of the regulation of 15022018 7 Compliance with the requirements of the Federal Law of 30122004 214 FZ On participation in the shared construction of apartment buildings and Other Real estate Objects and on Amendments to Certain legislative acts of the Russian Federation Compliance with the regulations of state control bodies supervision of municipal control bodies
# 581800222975
Unscheduled inspection
Start date: 2018-03-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 581800223039
Unscheduled inspection
Start date: 2018-03-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 581800070108
Unscheduled inspection
Start date: 2018-02-13, end date: 2018-02-14, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: To make a visual inspection of the capital construction object and analyze the documents specified in paragraph 13 of the regulations on the implementation of state construction supervision in the Russian Federation approved by the decree of the Government of the Russian Federation dated February 1, 2006 54
# 581800090169
Unscheduled inspection
Start date: 2018-02-14, end date: 2018-02-15, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: Compliance with the requirements of current legislation on the basis of a reasoned submission dated 09022018 07 Compliance with the requirements of Federal Law No. 30122004 214 FZ On Participation in the Shared Construction of Apartment Buildings and Other Real Estate Objects and on Amendments to Certain Legislative Acts of the Russian Federation Compliance with mandatory requirements or requirements established by municipal legal acts
# 581800195929
Unscheduled inspection
Start date: 2018-02-21, end date: —, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Penzenskoi oblasti
Purpose of inspection:
# 581800028154
Unscheduled inspection
Start date: 2018-01-31, end date: 2018-01-31, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: verification of compliance with the Urban planning legislation of the Russian Federation on the basis of the notice of the beginning of construction of the reconstruction of the capital construction facility bn dated 17012018 Compliance with urban planning legislation, Compliance of the work and construction materials used during the construction of the capital construction facility "Apartment building page 9" at the address Penza region Penza Oktyabrsky district General Glazunov St. 9, as well as the results of such work with the requirements of technical regulations, other regulations and project documentation
# 581800017031
Unscheduled inspection
Start date: 2018-01-25, end date: 2018-01-26, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: implementation of item 2 of the inspection program case number 7D1240 for compliance of the work and the construction materials used during the construction and reconstruction of the capital construction facility Apartment building 4 at 13 General Glazunov Street, Penza, as well as the results of such work with the requirements of technical regulations, other regulations and project documentation
# 581800016865
Unscheduled inspection
Start date: 2018-01-25, end date: —, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection:
# 58170802992729
Unscheduled inspection
Start date: 2017-12-19, end date: 2017-12-19, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: verification of compliance with the Urban planning legislation of the Russian Federation on the basis of the notice of the beginning of construction of the reconstruction of the capital construction facility bn dated 06122017Compliance with urban planning legislationconformity of work and construction materials used during the construction of the capital construction facility Apartment building page 6 with built-in non-residential premises at the address Penza region Penza General Glazunov street 21 as well as the results of such work requirements of technical regulations of other regulations and project documentation
# 58170802992766
Unscheduled inspection
Start date: 2017-12-19, end date: 2017-12-19, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: verification of compliance with the Urban planning legislation of the Russian Federation on the basis of the notice of the beginning of construction of the reconstruction of the capital construction facility bn dated 06122017Compliance with urban planning legislationconformity of work and construction materials used during the construction of the capital construction facility Apartment building page 8 at the address Penza region Penza General Glazunov street 15 as well as the results of such work requirements of technical regulations other regulations and design documentation Documentation
# 58170802992647
Unscheduled inspection
Start date: 2017-12-19, end date: 2017-12-19, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: verification of compliance with the Urban planning legislation of the Russian Federation on the basis of the notice of the beginning of construction of the reconstruction of the capital construction facility bn dated 06122017Compliance with urban planning legislationconformity of work and construction materials used during the construction of the capital construction facility Multi-apartment residential building page 7 with built-in non-residential premises at 17 General Glazunov Street, Penza, Penza region, as well as the results of such work with the requirements of technical regulations of other regulations and project documentation
# 58170802987855
Unscheduled inspection
Start date: 2017-12-19, end date: 2017-12-19, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: verification of compliance with the Urban planning legislation of the Russian Federation on the basis of the notice of the beginning of construction of the reconstruction of the capital construction facility bn dated 04122017Compliance with urban planning legislationconformity of work and construction materials used during the construction of the capital construction facility Multi-apartment residential building page 14 with built-in non-residential premises at the address Penza region General Glazunov street d 3 as well as the results of such work to the requirements of technical regulations and other regulatory acts and project documentation
# 58170802980278
Unscheduled inspection
Start date: 2017-12-14, end date: —, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection:
# 58170802967213
Unscheduled inspection
Start date: 2017-12-13, end date: 2017-12-15, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: verification of compliance with the Urban planning legislation of the Russian Federation on the basis of the notice of the beginning of construction of the reconstruction of the capital construction facility bn dated 27112017 Compliance with urban planning legislation Compliance of the work and construction materials used during the construction of the capital construction facility Multi-apartment residential building above 5 floors page 1 at Penza ul. 65th anniversary of Victory 21 as well as the results of such work with the requirements of technical regulations of other regulations and project documentation
# 58170802878647
Unscheduled inspection
Start date: 2017-11-24, end date: 2017-11-28, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: implementation of item 1 of the inspection program case number 7D1304 Compliance with urban planning legislation with the compliance of work performed and construction materials used during the construction of a capital construction facility an apartment building page 13 with built-in non-residential premises at the address Penza General Glazunov street d5 as well as the results of such work with the requirements of technical regulations other regulations and project documentation
# 58170802838463
Unscheduled inspection
Start date: 2017-11-24, end date: 2017-11-29, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: Verification of a capital construction facility completed on the basis of a notice of completion of construction of a capital construction facility dated 30102017Compliance with urban planning legislationconformity of work performed and construction materials used during the construction reconstruction of a capital construction facility Apartment building page 5 as well as the results of such work with the requirements of technical regulations other regulations and project documentation
# 58170802884537
Unscheduled inspection
Start date: 2017-11-23, end date: —, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection:
# 58170802884454
Unscheduled inspection
Start date: 2017-11-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 58170802838376
Unscheduled inspection
Start date: 2017-11-23, end date: 2017-11-28, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: Verification of a capital construction facility completed on the basis of a notice of completion of construction of a capital construction facility dated 30102017Compliance with urban planning legislation on the compliance of work performed and building materials used during the construction of a reconstruction of a capital construction facility Multi-apartment residential building with built-in non-residential premises page 2 2nd stage of construction of block section 78910 as well as the results of such work with the requirements of technical regulations other regulations and project documentation
# 58170802836436
Unscheduled inspection
Start date: 2017-11-15, end date: 2017-11-15, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: Verification of the execution of the regulation dated 04092017 701304 Verification of the execution of the regulation dated 04092017 701304 Compliance with the regulations of state control bodies supervision of municipal control bodies
# 58170802789421
Unscheduled inspection
Start date: 2017-10-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 58170802624714
Unscheduled inspection
Start date: 2017-09-29, end date: 2017-09-29, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: Verification of a capital construction facility completed on the basis of the notice of completion of construction of the capital construction facility bn dated 25092017Compliance with urban planning legislationconformity of work and construction materials used during the construction of the capital construction facility Apartment building pp2 as well as the results of such work with the requirements of technical regulations other regulations and project documentation, including energy efficiency requirements and requirements regarding the equipment of the capital construction facility with metering devices for used energy resources
# 58170802624689
Unscheduled inspection
Start date: 2017-09-29, end date: 2017-09-29, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: Verification of a capital construction facility completed on the basis of the notice of completion of the capital construction facility bn dated 25092017Compliance with urban planning legislation on the compliance of work performed and building materials used during the construction of the capital construction facility Apartment building pp2 with built-in non-residential premises, as well as the results of such work with the requirements of technical regulations other regulations and project documentation, including the requirements for energy efficiency and requirements regarding the equipment of the capital construction facility with metering devices for used energy resources
# 58170802150174
Unscheduled inspection
Start date: 2017-09-08, end date: 2017-09-11, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: verification of compliance with the Urban planning legislation of the Russian Federation on the basis of the notice of the start of construction of the capital construction facility bn dated 01092017Compliance with urban planning legislationconformity of work and construction materials used during the construction of the capital construction facility Multi-apartment residential building page 13 with built-in non-residential premises at Penza General Glazunov street d 5
# 58170802150222
Unscheduled inspection
Start date: 2017-09-08, end date: 2017-09-11, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: implementation of the p1 inspection program case number 7D1240Compliance with urban planning legislationconformity of the work and construction materials used during the construction of the reconstruction of the capital construction facility Apartment building 4 at 13 General Glazunov Street Penza, as well as the results of such work to the requirements of technical regulations other regulations and project documentation
# 58170802588261
Unscheduled inspection
Start date: 2017-09-26, end date: 2017-09-29, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: Implementation of p 33 of the inspection program case number 7D1122Compliance with urban planning legislationconformity of work performed and construction materials used during the construction and reconstruction of a capital construction facility multi-family apartment building page 3 with built-in non-residential premises multi-family apartment building page 3 with built-in non-residential premises stage II of construction of section VIVIII as well as the results of such work with the requirements of technical regulations other regulations and project documentation
# 58170801937810
Unscheduled inspection
Start date: 2017-08-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 58170701840061
Unscheduled inspection
Start date: 2017-07-31, end date: 2017-08-04, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: Implementation of p 32 of the inspection program case number 7D1122Compliance with urban planning legislationconformity of work performed and construction materials used during the construction and reconstruction of a capital construction facility multi-family apartment building page 3 with built-in non-residential premises multi-family apartment building page 3 with built-in non-residential premises stage II of construction of section VIVIII as well as the results of such work with the requirements of technical regulations other regulations and project documentation
# 58170701839986
Unscheduled inspection
Start date: 2017-07-31, end date: 2017-08-04, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: Implementation of p 23 of the inspection program case number 7D1039Compliance with urban planning legislation on the compliance of work performed and construction materials used during the construction and reconstruction of a capital construction facility An apartment building with built-in non-residential premises page 2 2nd stage of construction of block section 78910 as well as the results of such work with the requirements of technical regulations other regulations and project documentation
# 58170701840122
Unscheduled inspection
Start date: 2017-07-31, end date: 2017-08-04, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: Implementation of paragraphs 31 41 51 61 of the inspection program case number 7D1020Compliance with urban planning legislation on the compliance of work performed and construction materials used during the construction and reconstruction of a capital construction facility Apartment building page 5 as well as the results of such work with the requirements of technical regulations, other regulations and project documentation
# 58170701839922
Unscheduled inspection
Start date: 2017-07-31, end date: 2017-08-04, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: Implementation of p 34 of the inspection program case number 7D1038Compliance with urban planning legislationconformity of work performed and construction materials used during the construction reconstruction of a capital construction facility multi-apartment residential building with built-in non-residential premises page 2 1st stage of construction of block section 123456 as well as the results of such work with the requirements of technical regulations other regulations and project documentation
# 58170701708312
Unscheduled inspection
Start date: 2017-06-16, end date: 2017-06-19, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: Implementation of p 61 of the inspection program case number 7D1038Compliance with urban planning legislationconformity of work performed and construction materials used during the construction reconstruction of a capital construction facility multi-apartment residential building with built-in non-residential premises page 2 1st stage of construction of block section 123456 as well as the results of such work with the requirements of technical regulations other regulations and project documentation
# 58170701674746
Unscheduled inspection
Start date: 2017-06-06, end date: 2017-06-07, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: Verification of compliance with the Urban planning legislation of the Russian Federation on the basis of the notice of the start of construction of the capital construction facility bn dated 22052017 bx 11137851 dated 25052017Compliance with urban planning legislation and compliance of the work and construction materials used during the construction of the reconstruction of the capital construction facility Apartment building at Penza General Glazunov street d 13 as well as the results of such work with the requirements of technical regulations other regulations and project documentation
# 58170701726553
Unscheduled inspection
Start date: 2017-06-27, end date: 2017-06-29, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: Implementation of p 43 of the inspection program case number 7D1218Compliance with urban planning legislationconformity of the work and construction materials used during the construction of the reconstruction of the capital construction facility Apartment building pp12 with built-in administrative premises at Penza microdistrict 7 of the 3rd stage of construction of the Arbekovo residential area as well as the results of such work with the requirements of technical regulations other regulations and project documentation
# 58170701564019
Unscheduled inspection
Start date: 2017-04-26, end date: 2017-04-28, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: Implementation of p 31 of the inspection program case number 7D1039Compliance with urban planning legislationconformity of work and construction materials used in the construction process of reconstruction of a capital construction facility Multi-apartment residential building with built-in non-residential premises page 2 2nd stage of construction block section 78910 as well as the results of such work requirements of technical regulations other regulations and project documentation
# 58170701563787
Unscheduled inspection
Start date: 2017-04-26, end date: 2017-04-28, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: Implementation of p 41 51 of the inspection program case number 7D1038Compliance with urban planning legislation on the compliance of work performed and construction materials used during the construction and reconstruction of a capital construction facility an apartment building with built-in non-residential premises page 2 1st stage of construction block section 123456 as well as the results of such work with the requirements of technical regulations other regulations and project documentation
# 58170701562882
Unscheduled inspection
Start date: 2017-04-26, end date: 2017-04-28, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: Implementation of p 31 of the inspection program dated 31052016 case number 7D1121Compliance with urban planning legislation on the compliance of work performed and construction materials used in the construction process of reconstruction of a capital construction facility multi-family apartment building page 3 with built-in non-residential premises stage I of construction section IV as well as the results of such work with the requirements of technical regulations other regulations and project documentation
# 58170701562873
Unscheduled inspection
Start date: 2017-04-26, end date: —, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection:
# 58170701562860
Unscheduled inspection
Start date: 2017-04-26, end date: 2017-04-28, duration: —
Authority: Upravlenie gosudarstvennoi inspekcii v zhilischnoi stroitelnoi sferah i po nadzoru za tehnicheskim sostoyaniem samohodnyh mashin i drugih vidov tehniki Penzenskoi oblasti
Purpose of inspection: Implementation of p 24 of the inspection program case number 7D1020Compliance with urban planning legislationconformity of work and construction materials used in the construction process of reconstruction of a capital construction facility Apartment building page 5 as well as the results of such work with the requirements of technical regulations other regulations and project documentation