# 742201533679
Unscheduled inspection
Start date: 2022-01-25, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742201533672
Unscheduled inspection
Start date: 2022-01-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742101436214
Unscheduled inspection
Start date: 2021-12-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100795995
Unscheduled inspection
Start date: 2021-09-27, end date: 2021-10-01, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of works on installation of water supply system, sewerage, electrical installation, installation of external heat supply networks, water supply and sanitation, exterior finishing works, interior finishing works, installation of window and door blocks, roofing in axes 7-38/SH-LZH1 (during the work) and the construction materials used in the process of construction, reconstruction of the capital construction facility, as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100512946
Unscheduled inspection
Start date: 2021-08-31, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742100299965
Unscheduled inspection
Start date: 2021-06-30, end date: 2021-07-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of heating, ventilation, water supply, sewerage, installation of external water supply and sanitation networks in axes 7-38/SHH-LZH1 (during the work) and the construction materials used in the process of construction, reconstruction of the capital construction facility, as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100094536
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-09, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the roof installation in axes 7-38 /SHH-LZH1. (after completion of work), installation of a heating and ventilation system from m. -5.600 to m. 11.800 in axes 7-38/SHH-LZH1. (during the execution of works) and the construction materials used in the process of construction, reconstruction of the capital construction facility, as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742005268120
Unscheduled inspection
Start date: 2020-12-24, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742005147206
Unscheduled inspection
Start date: 2020-10-08, end date: 2020-10-14, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the roof installation works on otm +14460 in the axes 738ZHZHSH Installation of windows and doors in the axes 738ZHZHSH and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements of equipping the capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004428993
Unscheduled inspection
Start date: 2020-06-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004344330
Unscheduled inspection
Start date: 2020-03-17, end date: 2020-03-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Installation of wall enclosing structures installation of partitions at +5610 in the 738ZHSHSH axes overlap device at +8650 in the 738ZHSHSH axes and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work to the requirements approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the project documentation, taking into account the changes made to design documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipping the capital construction facility with metering devices used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741904041954
Unscheduled inspection
Start date: 2019-12-16, end date: 2019-12-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the overlap device at otm +000 in the axes 738ZHZHSH installation of wall enclosing structures partition device at +0000 in the axes 738ZHSHSH during the work overlap device at otm +2600 in the axes 738ZHSHSH during the work installation of wall enclosing structures partition device at +2600 in the axes 738ZHSHSH overlap device at otm +5610 in the axes 738ZHZHSH and the construction materials used in the construction process of the reconstruction of the capital construction facility, as well as the results of such work, meet the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903009977
Unscheduled inspection
Start date: 2019-09-03, end date: 2019-09-09, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the overlap device in the axes 738ZHZHSH at a level below 0000 after completion of the work with the brickwork of the walls of those floors in the axes 738ZHSHSH installation of wall enclosing structures to the device of partitions at +0000 in the axes 738ZHSHSH to the overlap device at otm +2600 in the axes 738ZHSHSH during the work and the construction materials used during the construction of the capital facility construction as well as the results of such work to the requirements of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902800766
Unscheduled inspection
Start date: 2019-06-24, end date: —, duration: —
Authority: —
Purpose of inspection: