Found 1 inspection:

# 77160701115706
Unscheduled inspection
Start date: 2016-11-15, end date: 2016-12-08, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: control over the implementation of the regulation GPN 49611 dated 22/12/2015 on the elimination of violations of fire safety requirements on the implementation of measures to ensure fire safety at protective facilities and to prevent the threat of fire The objectives of the audit are to carry out activities in accordance with the procedure established by the legislation of the Russian Federation to verify compliance by legal entities and individual entrepreneurs with mandatory fire safety requirements and to take measures based on the results The subject of this check is the fulfillment of the instructions of the state control bodies supervision of municipal control bodies


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.