Found 39 inspections:

# 742101420137
Unscheduled inspection
Start date: 2021-12-10, end date: 2022-01-14, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742101436331
Unscheduled inspection
Start date: 2021-12-17, end date: —, duration:
Authority:
Purpose of inspection:


# 742101245242
Unscheduled inspection
Start date: 2021-11-11, end date: —, duration:
Authority:
Purpose of inspection:


# 742101338863
Unscheduled inspection
Start date: 2021-11-22, end date: 2021-11-26, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the work on the construction of structures b/c 1,2 3rd floor (in the process of work), the construction of structures b/c 3 2,3 floor (in the process of work), the construction of structures b /c 4 1,2 floor (in the process of work), the installation of windows and stained glass (in the process of work), exterior decoration (in the course of work), installation of external gas supply networks (in the course of work) and the construction materials used during the construction, reconstruction of a capital construction facility, as well as the results of such work, according to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (as amended included in the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements efficiency does not apply) and the requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100678794
Unscheduled inspection
Start date: 2021-10-06, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742100678064
Unscheduled inspection
Start date: 2021-10-01, end date: 2021-10-07, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the roof installation (at the end of the work), installation of windows and stained glass windows (at the end of the work), interior and exterior decoration (at the end of the work), power supply and electric lighting (at the end of the work), internal engineering networks (at the end of the work), landscaping (at the end of the work), inspection fire-fighting and sanitary-epidemiological measures, measures for access to low-mobility groups of the population, energy efficiency measures and the construction materials used during construction, reconstruction of a capital construction facility, as well as the results of such work, meet the requirements of the design documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the design documentation documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100679187
Unscheduled inspection
Start date: 2021-09-30, end date: 2021-10-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the work on the construction of structures below 0.000 b/s 4 (at the end of the work), the construction of structures on the 1st floor of b/s 1-3 (at the end of the work), the construction of structures on the 1,2 floor of b/s 4 (in the process of work), the construction of structures on the 2nd floor of b/s 1,2,3 (in the process of work), construction of structures on the 3rd floor of second-hand buildings 1,2,3 (in the process of work), power supply and electric lighting (in the process of work), installation of outdoor gas supply networks (in the process of work). and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100638190
Unscheduled inspection
Start date: 2021-09-20, end date: —, duration:
Authority:
Purpose of inspection:


# 742100637983
Unscheduled inspection
Start date: 2021-09-20, end date: 2021-09-24, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on roofing (in the process of work), installation of windows and stained glass windows (in the process of work), interior and exterior decoration (in the process of work), power supply and electric lighting (in the process of work), internal engineering networks (in the process of work), landscaping (in the process of work). and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100451429
Unscheduled inspection
Start date: 2021-08-30, end date: 2021-09-03, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on the construction of structures 2,3 floor 1-4 b/s (in the process of work), installation of windows and stained glass windows (in the process of work), exterior decoration (in the process of work), installation of external and internal engineering networks (in the process of work), power supply and electric lighting (in the process of work), installation of external gas supply networks (in the process of work). and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100451444
Unscheduled inspection
Start date: 2021-08-30, end date: —, duration:
Authority:
Purpose of inspection:


# 742100384623
Unscheduled inspection
Start date: 2021-08-09, end date: —, duration:
Authority:
Purpose of inspection:


# 742100343474
Unscheduled inspection
Start date: 2021-07-19, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742100345925
Unscheduled inspection
Start date: 2021-07-29, end date: 2021-08-04, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the construction of structures below 0.000 b/s 3, b/ s 4 (in the process of work), above 0.000 b/s 1, b/s 2, b/s 3, b/s 4 (in the process of work), the installation of windows and stained glass (in the process of work), exterior decoration (in the process of work), installation of external water supply, sanitation, and gas supply networks (in the process of work) and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100345906
Unscheduled inspection
Start date: 2021-07-20, end date: —, duration:
Authority:
Purpose of inspection:


# 742100282210
Unscheduled inspection
Start date: 2021-06-16, end date: 2021-06-22, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the installation of window blocks, finishing works, installation of internal and external engineering systems, landscaping, insulation of exterior walls using the Ceresit system with thin-walled plaster, verification of fire and sanitary-epidemiological measures, access measures for low-mobility groups of the population, energy efficiency measures, landscaping and applied building materials during the construction, reconstruction of a capital construction facility, as well as the results of such work, the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (in if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100300075
Unscheduled inspection
Start date: 2021-06-29, end date: 2021-07-05, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the installation of load-bearing and enclosing structures of the 2nd and 3rd floors (in the process of work), roofing (in the process of work), installation of windows and stained glass windows (in the process of work), interior and exterior decoration (in the process of work), installation of engineering networks (in the process of work), electricity supply and electric lighting (during work), landscaping (during work) and the construction materials used during construction, reconstruction of a capital construction facility, as well as the results of such work, according to the requirements of the design documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the design documentation documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100300006
Unscheduled inspection
Start date: 2021-06-29, end date: 2021-07-05, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the construction of structures below 0.000 b/s 3, b/s 4 (in the process of work), above 0.000 b/s 1, b/s 2 (in the process of work), installation of windows and stained glass windows (in the process of work), exterior decoration (in the process of work), installation of external water supply, sanitation, and gas supply networks (in progress) and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100284061
Unscheduled inspection
Start date: 2021-06-25, end date: 2021-07-01, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of works on the construction of structures below 0.000 1-3 b/s (in the process of work), the installation of engineering networks (in the process of work), interior and exterior decoration (in the process of work), power supply and electric lighting (in the process of work) and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work, the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100294193
Unscheduled inspection
Start date: 2021-06-23, end date: 2021-07-20, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100231882
Unscheduled inspection
Start date: 2021-05-31, end date: 2021-06-04, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of window blocks, finishing works, installation of internal and external engineering systems, electricity supply, electric lighting and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (with taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100162298
Unscheduled inspection
Start date: 2021-04-28, end date: 2021-05-05, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on roofing, installation of windows and stained glass windows, installation of internal and external engineering systems, power supply, electric lighting and construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, on which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.


# 742100049820
Unscheduled inspection
Start date: 2021-03-15, end date: 2021-03-19, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the foundations and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of the Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices used energy resources; 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100006877
Unscheduled inspection
Start date: 2021-03-10, end date: 2021-03-23, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: compliance by the developer with the mandatory requirements of Articles 3.1, 19 of the Federal Law of 12/30/2004. No. 214-F, Decree of the Government of the Russian Federation dated 26.03.2019 No. 319 "On the Unified Information System of Housing Construction", establishing signs of compliance or non-compliance of residential buildings under construction with the criteria established by Part 1.1 of Article 23.1 of Federal Law No. 214-FZ of December 30, 2004


# 742100022479
Unscheduled inspection
Start date: 2021-02-24, end date: 2021-03-03, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of load-bearing and enclosing structures of the 1st floor - during the production of works and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (as amended, included in the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources; 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742105306241
Unscheduled inspection
Start date: 2021-01-28, end date: 2021-02-03, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of the 3rd floor and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and equipment requirements for capital construction facilities accounting for the energy resources used. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742105321385
Unscheduled inspection
Start date: 2021-01-27, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742005229272
Unscheduled inspection
Start date: 2020-11-27, end date: 2020-12-03, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the 2nd floor and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Meeting the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742005189447
Unscheduled inspection
Start date: 2020-10-23, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742005186433
Unscheduled inspection
Start date: 2020-10-20, end date: 2020-10-26, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the insulation of exterior walls using the Ceresit system with thin-walled plaster finishing 14 bs work on the verification of fire and sanitary epidemiological measures measures for access to low-mobility groups of the population energy efficiency measures landscaping at the end of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements approved in accordance with in accordance with Parts 15 152 and 153 of Article 48 of this Code of the project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital buildings for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742005172910
Unscheduled inspection
Start date: 2020-10-14, end date: —, duration:
Authority:
Purpose of inspection:


# 742005202722
Unscheduled inspection
Start date: 2020-10-30, end date: 2020-11-27, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004480651
Unscheduled inspection
Start date: 2020-08-17, end date: —, duration:
Authority:
Purpose of inspection:


# 742004438138
Unscheduled inspection
Start date: 2020-06-30, end date: 2020-07-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the organization of the construction site excavation work on the installation of external engineering networks installation of foundations during the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices used energy resource2 The availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902800048
Unscheduled inspection
Start date: 2019-06-28, end date: 2019-07-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of reinforced concrete structures of the technical floor and the 1st floor during the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with project documentation2 Availability of a construction permit3 Compliance with the requirements of HR 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902590409
Unscheduled inspection
Start date: 2019-03-27, end date: —, duration:
Authority:
Purpose of inspection:


# 741902497871
Unscheduled inspection
Start date: 2019-02-21, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741902497808
Unscheduled inspection
Start date: 2019-02-21, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741802127239
Unscheduled inspection
Start date: 2018-11-20, end date: 2018-11-26, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work organization of the construction site excavation work on the construction of a pile field during the work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.