# 242101283351
Unscheduled inspection
Start date: 2021-10-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 242100269668
Unscheduled inspection
Start date: 2021-06-30, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction No. 3007-ons-3 dated 01/20/2021 issued earlier to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 06/29/2021.
The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period.
7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.
# 242005258810
Unscheduled inspection
Start date: 2020-12-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 241903983234
Unscheduled inspection
Start date: 2019-11-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24190803489817
Unscheduled inspection
Start date: 2019-09-05, end date: 2019-10-02, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being checked regulation No. 259SENiEK dated 04022019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 04092019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the work actually performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision
# 24190803447285
Unscheduled inspection
Start date: 2019-07-01, end date: 2019-07-26, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being audited regulation No. 937TN dated 26042019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 28062019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period established by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision
# 241902749877
Unscheduled inspection
Start date: 2019-05-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24190803377929
Unscheduled inspection
Start date: 2019-04-01, end date: 2019-04-26, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the deadline for completion of work that is subject to verification in accordance with the approved program from 20122/2018 for inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction
# 241903783126
Unscheduled inspection
Start date: 2019-02-12, end date: 2019-03-12, duration: —
Authority: Gosudarstvennaya inspekciya truda v Krasnoyarskom krae
Purpose of inspection: Implementation of state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms in connection with the consideration of Sokolova's appeal D And vh 24754919 of 29.012019 ensuring compliance by employers with labor legislation and other regulatory legal acts containing labor law norms compliance with mandatory requirements and or requirements established by municipal legal acts
# 24190803342244
Unscheduled inspection
Start date: 2019-02-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 241902471537
Unscheduled inspection
Start date: 2019-02-01, end date: 2019-02-28, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 20122/2018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit
# 241802313471
Unscheduled inspection
Start date: 2018-12-20, end date: 2019-01-24, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 308 dated 12/122018 on the start of construction of the capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities, including technical regulations and project documentation. 7 The subject of this audit is 71 Verification of compliance with the works and construction materials used during the construction of a capital construction facility, as well as the results of such work, to the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and to the requirements for equipping a capital construction facility with metering devices for used energy resources 72 Meeting the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code Code of the Russian Federation 73 Checking the availability of a building permit