# 001902618293
Unscheduled inspection
Start date: 2019-03-20, end date: 2019-03-23, duration: —
Authority: VolzhskoOkskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is being conducted in order to verify the information contained in the appeal of the Supreme Council of the Russian Federation No. 8819 dated February 21, 2019, which resulted in a reasoned submission dated February 28, 2019. The purpose of this audit is to monitor compliance with industrial safety requirements to prevent the threat of harm to the lives of citizens, harm to the environment, and the occurrence of man-made emergencies. 7 The subject of this audit is 1 compliance with mandatory requirements 2 carrying out measures to prevent harm to the health of citizens
# 522004315914
Unscheduled inspection
Start date: 2020-03-02, end date: 2020-03-30, duration: —
Authority: Gosudarstvennaya inspekciya truda v Nizhegorodskoi oblasti
Purpose of inspection: on behalf of the Deputy Prime Minister of the Russian Federation Golikova TA dated December 27, 2019 TG 1211486
# 522004317390
Unscheduled inspection
Start date: 2020-03-04, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection:
# 522004248652
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-02-05, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: The inspection is carried out in order to verify compliance with the requirements of the regulation dated 18122019 519030104181 issued to the person carrying out the construction of Promgrazhdanstroy LLC to assess the compliance of work performed and building materials used during construction, as well as the results of such work, with the requirements of approved design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and equipment requirements. an object of capital construction with metering devices for the energy resources used, the availability of a construction permit, the fulfillment of the requirements established by parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, the task of verification, control over compliance with the requirements of urban planning legislation and approved design documentation
# 372004233030
Unscheduled inspection
Start date: 2020-01-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 522004190748
Unscheduled inspection
Start date: 2020-01-21, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection:
# 001902618293
Unscheduled inspection
Start date: 2019-03-20, end date: 2019-03-23, duration: —
Authority: VolzhskoOkskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this audit is being conducted in order to verify the information contained in the appeal of the Supreme Council of the Russian Federation No. 8819 dated February 21, 2019, which resulted in a reasoned submission dated February 28, 2019. The purpose of this audit is to monitor compliance with industrial safety requirements to prevent the threat of harm to the lives of citizens, harm to the environment, and the occurrence of man-made emergencies. 7 The subject of this audit is 1 compliance with mandatory requirements 2 carrying out measures to prevent harm to the health of citizens
# 521802036651
Unscheduled inspection
Start date: 2018-10-11, end date: 2018-10-11, duration: —
Authority: Gosudarstvennaya inspekciya truda v Nizhegorodskoi oblasti
Purpose of inspection: Compliance with the Labor Code of the Russian Federation
# 521801140199
Unscheduled inspection
Start date: 2018-09-12, end date: 2018-09-14, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: the inspection is carried out on the basis of the notification of Promgrazhdanstroy LLC on the elimination of violations during the construction of the capital construction facility bx 6120 dated 29082018, the approved inspection program for the capital construction facility, as well as in order to verify compliance with the requirements of the regulation dated 26012018 51903020418 issued to Promgrazhdanstroy LLC, the general contractor, to assess the compliance of work performed and building materials used during construction with the requirements of technical regulations norms and rules and design documentation, including during the construction phase, the installation of the aboveground part of the building, walls and partitions, roofing, the installation of external and internal networks, landscaping, the task of verification, monitoring compliance with the requirements of urban planning legislation and other regulatory legal acts in the field of construction, fire and other safety
# 521800456495
Unscheduled inspection
Start date: 2018-06-21, end date: 2018-06-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: the inspection is carried out on the basis of the notification of Promgrazhdanstroy LLC on the elimination of violations during the construction of the capital construction facility bx 3260 dated 29052018 and in order to verify compliance with the requirements of the regulation dated 24042018 5190303050408 issued to Promgrazhdanstroy LLC, the general contractor, as well as to assess the compliance of the work and the construction materials used during construction with the requirements of technical regulations, norms and rules and project documentation The purpose of the audit is to monitor compliance with the requirements of urban planning legislation and other regulatory legal acts in the field of construction
# 521800345117
Unscheduled inspection
Start date: 2018-05-10, end date: 2018-05-11, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: The inspection is carried out in order to assess the facts set out in the appeal of Mr. Komkov AM received from the territorial department in the city district of Arzamas, Arzamas, Ardatovsky, Vadsky, Diveevsky districts, to the city district of Pervomaysk of the Rospotrebnadzor Office for the Nizhny Novgorod region, vx 071431 dated 24042018, as well as to assess the compliance of the work and the construction materials used during construction with the requirements of technical regulations norms and rules and design documentation. documentation The task of verification is to monitor compliance with the requirements of urban planning legislation and other regulatory legal acts in the field of construction and other safety
# 52180803150464
Unscheduled inspection
Start date: 2018-05-15, end date: 2018-05-16, duration: —
Authority: Gosudarstvennaya zhilischnaya inspekciya Nizhegorodskoi oblasti
Purpose of inspection: verification of the facts set out in the collective appeals of residents living at the address Nizhny Novgorod region Arzamas ul. 50 let VLKSM d 38 vx 9570a6115zh dated 27042018 vx 8840a dated 23042018 vx 9003a5803zh dated 23042018 on the legality of the placement of a swimming pool in an uninhabited apartment building 38 on ul. 50 let VLKSM Arzamas Nizhny Novgorod region implementation of state housing supervision on on the territory of the Nizhny Novgorod Region, compliance with other mandatory requirements for the use and preservation of housing stock, regardless of its forms of ownership, established by housing legislation and legislation on energy conservation and energy efficiency improvement
# 521800287271
Unscheduled inspection
Start date: 2018-04-23, end date: 2018-04-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: the inspection is carried out on the basis of a notification of the approved inspection program for the capital construction facility, as well as in order to verify compliance with the requirements of regulation No. 13032018 5190303050405 issued to the contractor Promgrazhdanstroy LLC to assess the compliance of work performed and building materials used during construction and reconstruction with the requirements of technical regulations, norms and rules and design documentation, including during the construction phase preparatory period earthworks The work of the construction of the underground part is the task of checking the control over compliance with the requirements of urban planning legislation and other regulatory legal acts in the field of construction
# 521800023130
Unscheduled inspection
Start date: 2018-02-02, end date: 2018-02-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: the inspection is carried out on the basis of the notification of Promgrazhdanstroy LLC on the elimination of violations during the construction of the capital construction facility bx 5993 dated 13122017 of the approved inspection program for the capital construction facility, as well as in order to verify compliance with the requirements of the regulations dated 29112017 519030204214 519030204213 issued to Promgrazhdanstroy LLC contractor to assess the compliance of work performed and building materials used during construction with the requirements of technical regulations norms and rules and design documentation, including during the construction phase, the establishment of engineering networks and landscaping, the task of verification is to monitor compliance with the requirements of urban planning legislation and other regulatory legal acts in the field of construction, fire, sanitary, epidemiological and other safety
# 521800008141
Unscheduled inspection
Start date: 2018-01-25, end date: 2018-01-26, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: the inspection is carried out in order to verify the fulfillment of the regulations on the elimination of violations dated 15112017 519030204207 51903030304022 issued to the general contractor Promgrazhdanstroy LLC to assess the compliance of work performed and building materials used during construction with the requirements of technical regulations, norms and rules and design documentation. The task of the inspection is to monitor compliance with the requirements of urban planning legislation and other regulatory legal acts in the field of construction, fire, sanitary, epidemiological and other security
# 52170802858992
Unscheduled inspection
Start date: 2017-11-15, end date: 2017-11-17, duration: —
Authority: Administraciya goroda Arzamasa Nizhegorodskoi oblasti
Purpose of inspection: Purpose Verification of the execution of the order to eliminate violations of land legislation 1 dated 09082017, which expired on 09/12/2017the task is to establish the fact of execution of non-fulfillment of the order to eliminate violations of land legislation 1 dated 09082017the execution of the order of the municipal land control authority
# 52170802832121
Unscheduled inspection
Start date: 2017-11-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 52170802772793
Unscheduled inspection
Start date: 2017-10-30, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection:
# 52170802494943
Unscheduled inspection
Start date: 2017-09-21, end date: 2017-09-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: the inspection is carried out in order to verify compliance with the requirements of the regulation dated 04072017 5190303070441 issued to the contractor Promgrazhdanstroy LLC to assess the compliance of work performed and building materials used during construction with the requirements of technical regulations, norms and rules and design documentationthe task of the inspection is to monitor compliance with the requirements of urban planning legislation and other regulatory legal acts in the field of construction
# 52170801921270
Unscheduled inspection
Start date: 2017-08-24, end date: 2017-08-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: the inspection is carried out on the basis of notices from the State Control Institution NO "Nizhegorodstroyzakazchik" on the completion of the construction of the capital construction facility bx 3738 dated 17082017 Promgrazhdanstroy LLC on the elimination of violations during the construction of the capital construction facility bx 37381 37382 dated 17082017, as well as in order to verify compliance with the requirements of regulations from 19062017 5190303050413 dated 13072017 5190303050416 issued to the general contractor Promgrazhdanstroy LLC and assessment compliance of the constructed capital construction facility with the requirements of technical regulations norms and rules and design documentationthe task of verification is to monitor compliance with the requirements of urban planning legislation and other regulatory legal acts in the field of construction, fire, sanitary, epidemiological and other safety
# 52170701751822
Unscheduled inspection
Start date: 2017-07-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 52170701501501
Unscheduled inspection
Start date: 2017-04-04, end date: 2017-04-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: the inspection is carried out on the basis of the notification of Promgrazhdanstroy LLC on the elimination of violations during the construction of the capital construction facility bx 1045 dated 10032017 of the approved inspection program for the capital construction facility in order to verify compliance with the requirements of the instruction dated 11012017 519030307046 issued to the developer, the customer, the general contractor Promgrazhdanstroy LLC, to assess the compliance of work performed and building materials used during construction with the requirements of technical regulations norms and rules and design documentation, including during the construction phase specialized and outdoor worksapplication of inspections monitoring compliance with the requirements of urban planning legislation and other regulatory legal acts in the field of construction
# 52170701530461
Unscheduled inspection
Start date: 2017-04-20, end date: 2017-04-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: the inspection is carried out on the basis of the notification of Promgrazhdanstroy LLC on the elimination of violations during the construction of the capital construction facility BX 1472 dated 05042017, as well as in order to verify compliance with the requirements of the regulation dated 14032017 5190303050407 issued to Promgrazhdanstroy LLC, the general contractor, to assess the compliance of work performed and building materials used during construction with the requirements of technical regulations, norms and rules and design documentationthe task of verification monitoring compliance with the requirements of urban planning legislation and other regulatory legal acts in the field of construction
# 52170701441326
Unscheduled inspection
Start date: 2017-03-13, end date: 2017-03-14, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: the inspection is carried out in order to verify compliance with the requirements of the regulation dated 24012017 5190303050402 issued to the contractor Promgrazhdanstroy LLC for assessing the compliance of work performed and building materials used during construction with the requirements of technical regulations, norms and rules and design documentationthe task of the inspection is to monitor compliance with the requirements of urban planning legislation and other regulatory legal acts in the field of construction
# 52170701362773
Unscheduled inspection
Start date: 2017-02-13, end date: 2017-02-14, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: the inspection is carried out in order to verify compliance with the requirements of the regulation dated 08122016 5190303050440 issued to the contractor Promgrazhdanstroy LLC for assessing the compliance of work performed and building materials used during construction with the requirements of technical regulations, norms and rules and design documentationthe task of the inspection is to monitor compliance with the requirements of urban planning legislation and other regulatory legal acts in the field of construction
# 52170701277786
Unscheduled inspection
Start date: 2017-01-09, end date: 2017-01-11, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: the inspection is carried out on the basis of the notification of Promgrazhdanstroy LLC on the elimination of violations during the construction of the capital construction facility BX 2170 dated 16052016 approved inspection program for the capital construction facility in order to verify compliance with the requirements of the regulation dated 11052016 5190303070414 issued to the general contractor Promgrazhdanstroy LLC to assess the compliance of work and construction materials used during construction with the requirements of technical regulations standards and rules and design documentation, including during the construction phase, the construction of the aboveground part of a residential building, the task of inspection, control over compliance with the requirements of urban planning legislation and other regulatory legal acts in the field of construction
# 52160701208203
Unscheduled inspection
Start date: 2016-12-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 52160701042907
Unscheduled inspection
Start date: 2016-10-26, end date: 2016-10-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Nizhegorodskoi oblasti
Purpose of inspection: the inspection is carried out in order to verify compliance with the requirements of the regulation dated 14092016 issued to the contractor Promgrazhdanstroy LLC for assessing the compliance of work performed and building materials used during construction with the requirements of technical regulations, norms and rules and design documentationthe task of the inspection is to monitor compliance with the requirements of urban planning legislation and other regulatory legal acts in the field of construction