Start date: 2019-08-26, end date: 2019-08-27, duration:
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the measures taken by SSK LLC to comply with the order taking measures to bring to justice persons who committed violations of the requirements of Federal laws and other regulatory legal acts when verifying the fulfillment of non-compliance by SSK LLC with the order


# 001902755892
Unscheduled inspection
Start date: 2019-05-27, end date: 2019-05-31, duration:
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: assessment of compliance with Rostechnadzor Order No. 15032017 85 "On inspections of organizations operating tower cranes" based on the instruction of Deputy Chairman of the Government of the Russian Federation AG Khloponin dated 08022017 AHP9682 "On the organization and conduct of unscheduled inspections of organizations operating tower cranes in the period from 2017 to 2019"


# 262101426827
Unscheduled inspection
Start date: 2021-12-06, end date: —, duration: 3
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: The inspection program dated 05/18/2021 No. 24/04-2021 stage No. 4. The objectives of this inspection are to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, technical customer, person carrying out construction. - compliance with the procedure for conducting construction control, maintaining general and (or) special work logs, executive documentation, drawing up acts of inspection of works, structures, sections of engineering and technical support networks; - compliance with the compliance of the work performed and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved design documentation; - compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 262101305959
Unscheduled inspection
Start date: 2021-12-06, end date: —, duration: 3
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: The inspection program dated 02/26/2021 No. 24/02-2021 stage No. 5. The objectives of this inspection are to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, technical customer, person carrying out construction. 7. The subject of this audit is (underline the necessary): - compliance with the procedure for conducting construction control, maintaining general and (or) special work logs, executive documentation, drawing up acts of inspection of works, structures, sections of engineering support networks; - compliance with the compliance of the work performed and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved design documentation; - compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 262101293384
Unscheduled inspection
Start date: 2021-10-29, end date: —, duration:
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: The inspection program dated 01/10/2020 No. 06/01-2020 stage No. 9,10,11,12 the objectives of this inspection are to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, technical customer, person engaged in construction. 7. The subject of this audit is (underline the necessary): - compliance with the procedure for conducting construction control, maintaining general and (or) special work logs, executive documentation, drawing up acts of inspection of works, structures, sections of engineering support networks; - compliance with the compliance of the work performed and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved design documentation; - compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 262101093708
Unscheduled inspection
Start date: 2021-09-29, end date: —, duration:
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: The inspection program dated 01/10/2020 No. 06/01-2020 stage No.8. The objectives of this inspection are to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, technical customer, person carrying out construction. 7. The subject of this audit is (underline the necessary): - compliance with the procedure for conducting construction control, maintaining general and (or) special work logs, executive documentation, drawing up acts of inspection of works, structures, sections of engineering support networks; - compliance with the compliance of the work performed and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved design documentation; - compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 262100905442
Unscheduled inspection
Start date: 2021-09-23, end date: —, duration:
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: The inspection program dated 05/18/2021 No. 24/04-2021 stage No. 3. The objectives of this inspection are to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, technical customer, person carrying out construction. - compliance with the procedure for conducting construction control, maintaining general and (or) special work logs, executive documentation, drawing up acts of inspection of works, structures, sections of engineering and technical support networks; - compliance with the compliance of the work performed and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved design documentation; - compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 262100504196
Unscheduled inspection
Start date: 2021-08-19, end date: —, duration:
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: Notice dated 08/13/2021, vh. No. 12167/01-04 on the completion dates of the works that are subject to verification. The inspection program dated 05/18/2021 No. 24/04-2021 stage No. 2. The objectives of this audit are to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, the person carrying out the construction. - compliance with the procedure for conducting construction control, maintaining general and (or) special work logs, executive documentation, drawing up acts of inspection of works, structures, sections of engineering support networks; - compliance with the compliance of the work performed and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved design documentation; - compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 262100504021
Unscheduled inspection
Start date: 2021-08-19, end date: —, duration:
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: Notification dated 08/03/2021 of the Supreme Court. No. 11700/01-04 on the completion dates of the works that are subject to verification. The inspection program dated 02/26/2021 No. 24/02-2021 stage No. 3. The objectives of this inspection are to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, technical customer, person carrying out construction. 7. The subject of this audit is (underline the necessary): - compliance with the procedure for conducting construction control, maintaining general and (or) special work logs, executive documentation, drawing up acts of inspection of works, structures, sections of engineering support networks; - compliance with the compliance of the work performed and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved design documentation; - compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 262101293404
Unscheduled inspection
Start date: 2021-08-19, end date: —, duration:
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: Notice dated 08/13/2021, vh. No. 12167/01-04 on the completion dates of the works that are subject to verification. The inspection program dated 05/18/2021 No. 24/04-2021 stage No. 2. The objectives of this audit are to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, the person carrying out the construction. - compliance with the procedure for conducting construction control, maintaining general and (or) special work logs, executive documentation, drawing up acts of inspection of works, structures, sections of engineering support networks; - compliance with the compliance of the work performed and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved design documentation; - compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 262100349307
Unscheduled inspection
Start date: 2021-07-12, end date: —, duration:
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: Notification dated 07/01/2021 bx. No. 9745/01-04 on the completion dates of the works that are subject to verification. The inspection program dated 02/26/2021 No. 24/02-2021 stage No. 2. The objectives of this audit are to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, the person carrying out the construction. 7. The subject of this audit is (underline the necessary): - compliance with the procedure for conducting construction control, maintaining general and (or) special work logs, executive documentation, drawing up acts of inspection of works, structures, sections of engineering and technical support networks; - compliance with the compliance of the work performed and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the approved design documentation; - compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 262100296681
Unscheduled inspection
Start date: 2021-06-17, end date: —, duration:
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: Notification of the completion dates of works that are subject to verification dated 05/26/2021 No. 7290/01-04. The inspection program dated 05/18/2021 No. 24/04-2021 stage No. 1. The objectives of this inspection are to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, technical customer, person carrying out construction. - compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 262100227838
Unscheduled inspection
Start date: 2021-05-20, end date: —, duration:
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: Notice of the start of construction of the capital construction facility dated 05/12/2021 No. 6574/01-04 The objectives of this audit are to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, the person carrying out the construction. - compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 262100085902
Unscheduled inspection
Start date: 2021-04-01, end date: —, duration:
Authority:
Purpose of inspection:


# 262100043636
Unscheduled inspection
Start date: 2021-03-02, end date: 2021-03-30, duration:
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: Notice of the beginning of the reconstruction of the capital construction facility dated 02/17/2021 No. 2159/01-04 The objectives of this audit are to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, the person carrying out the construction. - compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 262005267970
Unscheduled inspection
Start date: 2020-12-16, end date: 2021-01-20, duration: 20
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: this inspection is carried out for the purpose of notification of the completion of construction reconstruction FINAL INSPECTION


# 262005284696
Unscheduled inspection
Start date: 2020-12-21, end date: 2021-01-25, duration:
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: The inspection program from 10012020 06012020 stage 7 the tasks of this inspection are the prevention identification and suppression of violations of the legislation on urban planning activities committed by the developer, the technical customer, the person carrying out construction, including technical regulations and design documentation, compliance with the procedure for conducting construction control, maintaining general and or special work logs, executive documentation, drawing up certificates of inspection of works of structures of sections of engineering support networks, compliance with other requirements when performing works established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used, compliance with mandatory requirements and or requirements established by municipal legal acts


# 262005235755
Unscheduled inspection
Start date: 2020-11-18, end date: 2020-12-15, duration:
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: The inspection program from 10012020 06012020 stage 6 the objectives of this inspection are to prevent identify and suppress violations of the legislation on urban planning activities committed by the developer, the technical customer, the person carrying out construction, including technical regulations and design documentation, compliance with the procedure for conducting construction control, maintaining general and or special work logs, executive documentation, drawing up certificates of inspection of works of structures of sections of engineering support networks, compliance with other requirements for the performance of work established by the design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used compliance with mandatory requirements and or requirements established by municipal legal acts


# 262005222138
Unscheduled inspection
Start date: 2020-11-10, end date: 2020-12-07, duration: 20
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: This audit is conducted for the purpose of the verification program dated 29122018 29112018


# 262004480858
Unscheduled inspection
Start date: 2020-08-04, end date: 2020-08-28, duration:
Authority: Gosudarstvennaya inspekciya truda v Stavropolskom krae
Purpose of inspection: implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms on the basis of the instruction of Deputy Prime Minister of the Russian Federation TA Golikova dated December 27, 2019 TG 1211486 of the Rostrud Order dated February 07, 2020 29 "On conducting unscheduled on-site inspections of compliance by employers engaged in activities in the field of construction state normative requirements for labor protection and proper registration of employment contracts with employees or the conclusion of civil law contracts actually regulating labor relations between an employee and an employer"


# 262004483174
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-09-04, duration: 20
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: This inspection is carried out for the purpose of the inspection program from 10012020 06012020 stage 5 The tasks of this inspection are the prevention identification and suppression of violations of the legislation on urban development activities committed by the developer, the technical customer, the person carrying out construction, including technical regulations and project documentation The subject of this inspection is compliance with the procedure for conducting construction control, maintaining general and or special work logs, executive documentation, drawing up inspection acts works of structures of sections of engineering and technical support networks compliance with other requirements when performing works established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used compliance with mandatory requirements and or requirements established by municipal legal acts


# 262004417711
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-06-22, duration: 20
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: This inspection is carried out for the purpose of the inspection program from 10012020 06012020 stage 4 The tasks of this inspection are the prevention detection and suppression of violations of the legislation on urban development activities committed by the developer, the technical customer, the person carrying out construction, including technical regulations and project documentation The subject of this inspection is compliance with the procedure for conducting construction control, maintaining general and or special work logs, executive documentation, drawing up inspection acts works of structures of sections of engineering and technical support networks compliance with other requirements when performing works established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used compliance with mandatory requirements and or requirements established by municipal legal acts


# 262004254766
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-03-02, duration:
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: Notification dated 24012020 bx 5340105 on the completion dates of works that are subject to verification Inspection program from 10012020 06012020 stage 23 the objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer, the technical customer, the person carrying out construction, including technical regulations and project documentation, compliance with the procedure for conducting construction control, maintaining general and or special logs of work of executive documentation preparation of certificates of inspection of works of structures of sections of engineering and technical support networks compliance with other requirements when performing works established by design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used compliance with mandatory requirements and or requirements established by municipal legal acts


# 262004300735
Unscheduled inspection
Start date: 2020-02-20, end date: 2020-03-20, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: this inspection is carried out in order to comply with the order of 111219 29112018 the objectives of this inspection are to prevent identify and suppress violations of the legislation on urban planning activities committed by the developer, the technical customer, the person carrying out construction, including technical regulations and project documentation. The subject of this inspection is the elimination of violations of compliance with the requirements of technical works identified during construction control and implementation of regional state construction supervision regulations norms and rules of other regulatory legal acts and project documentation hereinafter violations as well as compliance with the prohibition to proceed with the continuation of work before drawing up acts on the elimination of such violations


# 262004176401
Unscheduled inspection
Start date: 2020-01-13, end date: 2020-02-07, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: This inspection is carried out for the purpose of notification dated 24122019 ex 72 reg 224450114 dated 24122019 on the elimination of violations during the construction of a capital construction facility The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development activities committed by the developer, the technical customer, the person carrying out construction, including technical regulations and project documentation The subject of this inspection is the elimination of violations identified during construction control and implementation of regional state construction supervision of violations of compliance of completed works with the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation hereinafter violations as well as compliance with the prohibition to proceed with the continuation of work before drawing up acts on the elimination of such violations


# 261903946343
Unscheduled inspection
Start date: 2019-11-11, end date: 2019-12-06, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: this inspection is carried out in order to notify about the completion dates of works that are subject to verification from 311019 48 the inspection program from 29122018 29112018 the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer, the technical customer, the person carrying out construction, including technical regulations and project documentation The subject of this inspection is compliance with the procedure for conducting construction control, conducting general and or special logs of works of executive documentation preparation of acts of inspection of works of structures of sections of engineering and technical support networks compliance with other requirements when performing works established by design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used compliance with mandatory requirements and or requirements established by municipal legal acts


# 261903957933
Unscheduled inspection
Start date: 2019-11-14, end date: 2019-12-11, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: this inspection is carried out for the purpose of the instruction from 05072019 29112018 the objectives of this inspection are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, the person carrying out construction, the subject of this inspection is the elimination of violations of compliance with the requirements of technical regulations identified during construction control and implementation of regional state construction supervision norms and rules of other regulatory legal acts and project documentation, hereinafter violations, as well as compliance with the prohibition to proceed with the continuation of work before drawing up acts on the elimination of such violations


# 261903411794
Unscheduled inspection
Start date: 2019-09-11, end date: —, duration:
Authority:
Purpose of inspection:


# 261902973121
Unscheduled inspection
Start date: 2019-08-20, end date: —, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection:


# 001902823437
Unscheduled inspection
Start date: 2019-08-26, end date: 2019-08-27, duration:
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring the measures taken by SSK LLC to comply with the order taking measures to bring to justice persons who committed violations of the requirements of Federal laws and other regulatory legal acts when verifying the fulfillment of non-compliance by SSK LLC with the order


# 261902917035
Unscheduled inspection
Start date: 2019-07-29, end date: 2019-08-23, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: The audit is carried out in order to carry out measures to monitor compliance by SSK LLC with the mandatory requirements established by Federal Law No. 214 FZ of December 30, 2004 "On Participation in the Shared Construction of Apartment Buildings and Other Real Estate Objects and on Amendments to Certain Legislative Acts of the Russian Federation" The objectives of this audit are to prevent, identify and suppress violations by the head and others officials in carrying out the activities of SSK LLC related to attracting funds from participants in shared-equity construction, the subject of this audit is compliance by persons attracting citizens' funds for construction with the mandatory requirements established by Federal Law 214 FZ and other regulatory legal acts of the Russian Federation adopted in accordance with it when posting information in the Unified Housing Construction Information System


# 261902825061
Unscheduled inspection
Start date: 2019-06-28, end date: —, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection:


# 261902775362
Unscheduled inspection
Start date: 2019-06-05, end date: 2019-07-02, duration:
Authority: Gosudarstvennaya inspekciya truda v Stavropolskom krae
Purpose of inspection: 360 of the Labor Code of the Russian Federation


# 001902755892
Unscheduled inspection
Start date: 2019-05-27, end date: 2019-05-31, duration:
Authority: Kavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: assessment of compliance with Rostechnadzor Order No. 15032017 85 "On inspections of organizations operating tower cranes" based on the instruction of Deputy Chairman of the Government of the Russian Federation AG Khloponin dated 08022017 AHP9682 "On the organization and conduct of unscheduled inspections of organizations operating tower cranes in the period from 2017 to 2019"


# 261902605896
Unscheduled inspection
Start date: 2019-03-28, end date: —, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection:


# 261902460720
Unscheduled inspection
Start date: 2019-01-28, end date: —, duration:
Authority:
Purpose of inspection:


# 261802412802
Unscheduled inspection
Start date: 2018-12-29, end date: 2019-02-04, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: this inspection is carried out for the purpose of notifying the start of construction. The objectives of this inspection are to prevent, identify and suppress violations of legislation on urban planning activities committed by the developer, the technical customer, the person carrying out construction, including technical regulations and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts


# 261800561304
Unscheduled inspection
Start date: 2018-07-19, end date: 2018-08-15, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: the purpose of the notification of completion of works subject to inspection from 009072018 155 Final inspection the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or technical customer hereinafter the contractor, the subject of this inspection is compliance with mandatory requirements and or the requirements established by municipal legal acts


# 261800027369
Unscheduled inspection
Start date: 2018-02-01, end date: 2018-03-01, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: for the purpose of notification of the completion of works subject to inspection the inspection program from 20072017 23042015 the objectives of this inspection are to prevent identify and suppress violations of the legislation on urban development activities committed by the developer, the technical customer, the person carrying out construction, including technical regulations and project documentation The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts


# 26170802954122
Unscheduled inspection
Start date: 2017-12-04, end date: 2017-12-29, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: this inspection is carried out for the purpose of notification 119 dated 23112017 on the completion of construction reconstruction FINAL INSPECTION program 29062016 dated 23092016 the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development activities committed by the developer, the technical customer, the person carrying out construction, including technical regulations and design documentationthe subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts


# 26170802744050
Unscheduled inspection
Start date: 2017-11-13, end date: 2017-12-08, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: this audit is carried out in order to notify about the completion dates of works that are subject to verification from 041017 103The tasks of this audit are to prevent identify and suppress violations of legislation on urban development activities committed by the developer, the technical customer, the person carrying out construction, including technical regulations and project documentationthe subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts


# 26170802920511
Unscheduled inspection
Start date: 2017-11-30, end date: 2017-12-22, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Stavropolskomu krayu
Purpose of inspection: verification of compliance with the regulation dated 23102017 345pr


# 26170701845672
Unscheduled inspection
Start date: 2017-08-04, end date: 2017-08-31, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: this inspection is carried out for the purpose of notifying about the completion of works subject to inspection from 24072017 47 the objectives of this inspection are to prevent identify and suppress violations of the legislation on urban planning activities committed by the developer, the technical customer, the person carrying out construction, including technical regulations and design documentationthe subject of this inspection is the conformity of the work and the construction materials used during the construction reconstruction of the capital construction facility and also, the results of such work meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources, as well as permits for construction to comply with the requirements established by parts 2 3 and 31 of Article 52 of this Code


# 26170701564095
Unscheduled inspection
Start date: 2017-04-27, end date: 2017-05-30, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: for the purpose of notification of completion of works subject to inspection dated 17042017 18 the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or technical customer, hereinafter referred to as the contractor, the subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts


# 26170701328536
Unscheduled inspection
Start date: 2017-01-26, end date: 2017-02-27, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: this audit is carried out in order to notify about the completion dates of works that are subject to verification from 17.0117 7The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the technical customer, hereinafter referred to as the contractor, the subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts


# 26160701219156
Unscheduled inspection
Start date: 2016-12-12, end date: 2017-01-13, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: this inspection is carried out with the purpose of announcing the completion of works subject to inspection from 23112016 bx 114970114 in accordance with the inspection program from 03062013 39042013 the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the technical customer The purpose of this check is to comply with the mandatory requirements defined by the Urban Planning Code of the Russian Federation and other normative legal acts of the Russian Federation, the compliance of the information contained in the certificate of admission issued by the SRO with the work performed


# 26160701267045
Unscheduled inspection
Start date: 2016-12-21, end date: 2017-01-24, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: this audit is carried out in order to notify of the final audit in accordance with the audit program from 03062013 39042013 the objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the technical customer, the subject of this audit is compliance with mandatory requirements defined by the Urban Planning Code of the Russian Federation and other normative legal acts of the Russian Federation compliance of the information contained in the certificate of admission issued by the SRO to the work performed


# 26160701096292
Unscheduled inspection
Start date: 2016-11-09, end date: 2016-12-06, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: this audit is carried out in order to notify about the completion dates of works that are subject to verification from 011116 93 inspection program 26062016 the tasks of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or technical customer hereinafter the contractor, the subject of this audit It is the observance of mandatory requirements defined by the Urban Planning Code of the Russian Federation and other normative legal acts of the Russian Federation


# 26160700989243
Unscheduled inspection
Start date: 2016-10-05, end date: —, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection:


# 26160700851590
Unscheduled inspection
Start date: 2016-09-22, end date: 2016-10-19, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: this inspection is carried out for the purpose of notifying the beginning of construction. The objectives of this inspection are to prevent, identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or technical customer, hereinafter the contractor, the subject of this inspection is compliance with mandatory requirements defined by the Urban Planning Code of the Russian Federation and other regulatory legal acts of the Russian Federation compliance of the information contained in the certificate of admission issued by the SRO to the work performed


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.