Found 1 inspection:

# 262004268891
Unscheduled inspection
Start date: 2020-02-07, end date: 2020-03-06, duration:
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: Notification dated 03022020 bx 10670105 on the completion dates of the works that are subject to verification Inspection program dated 14012020 24012020 stage 12The objectives of this audit are to prevent identify and suppress violations of legislation on urban development by the developer, technical customer, and the person carrying out construction, including technical regulations and project documentation, compliance with the construction control procedure, general and or special work logs, and executive documentation drawing up certificates of inspection of work on structures of sections of engineering and technical support networks compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources compliance with mandatory requirements and or requirements established by municipal legal acts


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.