# 001800195526
Unscheduled inspection
Start date: 2018-03-13, end date: —, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001800215192
Unscheduled inspection
Start date: 2018-03-16, end date: 2018-03-16, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to issue a permit for the commissioning of the boiler house on the basis of an application from the director of JSC IC CHGS ex 13 from 05032018 vh Ch2873 from 05032018, the objectives of this inspection are to carry out measures to control the technical condition and safe operation of thermal power plants and heating networks at 454000 Chelyabinsk residential area Shagol mkrn 1 annex to apartment building 4b
# 00170802818483
Unscheduled inspection
Start date: 2017-11-02, end date: 2017-11-02, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to issue a permit for the commissioning of thermal power plants and heating networks
# 00170802818537
Unscheduled inspection
Start date: 2017-11-02, end date: 2017-11-02, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to issue a permit for the commissioning of thermal power plants and heating networks
# 00170802818261
Unscheduled inspection
Start date: 2017-11-01, end date: 2017-11-01, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to issue a permit for the commissioning of thermal power plants and heating networks
# 00170802797525
Unscheduled inspection
Start date: 2017-10-27, end date: 2017-10-30, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: issuance of a permit for the commissioning of power plants
# 00170802762620
Unscheduled inspection
Start date: 2017-10-20, end date: 2017-10-20, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to issue a permit for the commissioning of thermal power plants and heating networks
# 00170802761924
Unscheduled inspection
Start date: 2017-10-20, end date: 2017-10-20, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to issue a permit for the commissioning of thermal power plants and heating networks of a residential building 42
# 00170802762502
Unscheduled inspection
Start date: 2017-10-19, end date: 2017-10-19, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to issue a permit for the commissioning of thermal power plants and heating networks
# 00170802762475
Unscheduled inspection
Start date: 2017-10-19, end date: —, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00170802761837
Unscheduled inspection
Start date: 2017-10-17, end date: 2017-10-17, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Issuance of a permit for the commissioning of thermal power plants and heating networks of a residential building 41
# 00170701806140
Unscheduled inspection
Start date: 2017-07-18, end date: 2017-07-19, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: issuance of a permit for the commissioning of power plants
# 742201517686
Unscheduled inspection
Start date: 2022-01-20, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742201530332
Unscheduled inspection
Start date: 2022-01-21, end date: 2022-01-27, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of structures from the basement to the second floor (in the process of work) in the axes '1-4, D-K' and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 this Code of Project documentation (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities that are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742201530362
Unscheduled inspection
Start date: 2022-01-24, end date: 2022-01-28, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on the installation of internal engineering systems of water supply, sewerage, heating, electricity, ventilation, smoke removal, fire safety systems, low-current systems, interior finishing works, landscaping of the house territory and installation of small architectural forms, fire-fighting, sanitary and epidemiological measures, measures to ensure access for low-mobility groups of the population, the facade of the building (after completion of the work) and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742201530381
Unscheduled inspection
Start date: 2022-01-25, end date: 2022-01-31, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on reinforcement and concreting of grillages (in progress) in the axes '5-8' and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes, included in the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects for which energy efficiency requirements they do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742201528272
Unscheduled inspection
Start date: 2022-01-14, end date: 2022-01-20, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of reinforced concrete of 3-6 floors and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the design documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements of equipment of the capital construction facility with devices accounting for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742101418411
Unscheduled inspection
Start date: 2021-12-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742101299482
Unscheduled inspection
Start date: 2021-11-12, end date: 2021-11-18, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of reinforced concrete of the ground floor, 1-2 floors and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and equipment requirements of the facility capital construction with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742101357326
Unscheduled inspection
Start date: 2021-11-30, end date: 2021-12-27, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742101375536
Unscheduled inspection
Start date: 2021-11-30, end date: 2021-12-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of works on the installation of window structures, internal engineering systems of water supply, sewerage, heating, electricity, finishing works during the work, installation of structures after completion of work, installation of internal engineering systems of water supply, sewerage, heating, electricity, finishing works after completion of work and applied building materials during construction, reconstruction of the facility capital construction, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance information models are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742101324861
Unscheduled inspection
Start date: 2021-11-23, end date: 2021-11-29, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of the grillage (in the course of work) in the axes '1-4, D-K' and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (with taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects for which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742101324854
Unscheduled inspection
Start date: 2021-11-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742101338248
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742101226773
Unscheduled inspection
Start date: 2021-10-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742101248464
Unscheduled inspection
Start date: 2021-10-26, end date: 2021-11-01, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the foundation pit, pile foundation (in the course of work) in axes (5-8) and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects for which the requirements energy efficiency does not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742101226803
Unscheduled inspection
Start date: 2021-10-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100515118
Unscheduled inspection
Start date: 2021-09-10, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742100715274
Unscheduled inspection
Start date: 2021-09-28, end date: 2021-10-04, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of structures during the work and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and equipment requirements of the capital construction facility metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100365470
Unscheduled inspection
Start date: 2021-07-22, end date: 2021-07-28, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of reinforced concrete of 3-10 floors and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the design documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements of equipment of the capital construction facility with devices accounting for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100314139
Unscheduled inspection
Start date: 2021-06-30, end date: 2021-07-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the foundation pit, pile foundation (in the course of work) in axes (1-6, A-D) and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code documentation (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which the requirements of energy efficiency do not apply) and the requirements for equipping the capital construction facility with metering devices for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100314141
Unscheduled inspection
Start date: 2021-06-30, end date: 2021-07-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the foundation pit, pile foundation (in the course of work) in the axes (1-4, D-K) and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code documentation (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which the requirements of energy efficiency do not apply) and the requirements for equipping the capital construction facility with metering devices for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100307117
Unscheduled inspection
Start date: 2021-06-29, end date: 2021-07-05, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of building structures during the work and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the design documentation in accordance with parts 3.8 and 3.9 of Articles 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and equipment requirements of the capital construction facility construction of metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100194398
Unscheduled inspection
Start date: 2021-05-14, end date: 2021-06-10, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100210377
Unscheduled inspection
Start date: 2021-05-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100143219
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-04-23, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of the pile field and grillage and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and equipment requirements of the capital construction facility metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100181121
Unscheduled inspection
Start date: 2021-04-29, end date: 2021-05-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Checking the actual condition of the object. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100181126
Unscheduled inspection
Start date: 2021-04-29, end date: 2021-05-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Checking the actual condition of the object. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100105912
Unscheduled inspection
Start date: 2021-04-08, end date: 2021-05-06, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100098879
Unscheduled inspection
Start date: 2021-04-06, end date: 2021-04-12, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of reinforced concrete on the 11th floor and the installation of the roof and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and equipment requirements of the facility capital construction with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100098872
Unscheduled inspection
Start date: 2021-04-06, end date: 2021-04-12, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of reinforced concrete of the ground floor, 1-2 floors and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and equipment requirements of the facility capital construction with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100162150
Unscheduled inspection
Start date: 2021-04-26, end date: 2021-05-25, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100093177
Unscheduled inspection
Start date: 2021-03-30, end date: 2021-04-05, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the performance of works on the implementation of internal engineering works: electrical installation of electrical equipment, plumbing, VC, installation of elevator equipment, installation of windows (during the production of works) and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such works with the requirements approved in accordance with parts 15, 15.2 and 15.3 Article 48 of this Code of project documentation (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, which are not subject to energy efficiency requirements) and the requirements for equipping a capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100092884
Unscheduled inspection
Start date: 2021-03-30, end date: 2021-04-05, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of the grillage during the work and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and equipment requirements of the capital construction facility metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100092195
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-02, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of the box during the work and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and equipment requirements of the capital construction facility metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100024064
Unscheduled inspection
Start date: 2021-02-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100003356
Unscheduled inspection
Start date: 2021-02-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100009973
Unscheduled inspection
Start date: 2021-02-12, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742100009890
Unscheduled inspection
Start date: 2021-02-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100009956
Unscheduled inspection
Start date: 2021-02-12, end date: 2021-02-12, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Verification of the execution of the order dated 12/18/2020, the deadline for execution is 18.01.2021. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100009994
Unscheduled inspection
Start date: 2021-02-12, end date: 2021-02-12, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Verification of the execution of the order dated 12/25/2020, the deadline for execution is 01/29/2021. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100021228
Unscheduled inspection
Start date: 2021-02-24, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742105339140
Unscheduled inspection
Start date: 2021-02-24, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742105339153
Unscheduled inspection
Start date: 2021-02-24, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742105339122
Unscheduled inspection
Start date: 2021-02-24, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742105334545
Unscheduled inspection
Start date: 2021-02-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742105308127
Unscheduled inspection
Start date: 2021-01-22, end date: 2021-01-28, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of a pile field in the course of work and the construction materials used in the process of construction, reconstruction of a capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and equipment requirements of the facility capital construction with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742105308129
Unscheduled inspection
Start date: 2021-01-22, end date: 2021-01-28, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of a box of 3-6 floors in the course of work and the construction materials used during construction, reconstruction of a capital construction facility, as well as the results of such work with the requirements of the design documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the design documentation in accordance with with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, which are not subject to energy efficiency requirements) and equipment requirements the capital construction facility is equipped with metering devices for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742105303881
Unscheduled inspection
Start date: 2021-01-19, end date: 2021-02-04, duration: 13
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of the pile field in the course of work. and the construction materials used in the process of construction, reconstruction of the capital construction facility, as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742105303885
Unscheduled inspection
Start date: 2021-01-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742105308185
Unscheduled inspection
Start date: 2021-01-27, end date: 2021-02-02, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the device of internal finishing works, the device of vertical planning (completed stage); the device of internal engineering systems, ventilation, smoke removal, installation of elevator equipment (in progress) and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code of the project documentation (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742005265447
Unscheduled inspection
Start date: 2020-12-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742005266176
Unscheduled inspection
Start date: 2020-12-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742005266175
Unscheduled inspection
Start date: 2020-12-14, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742005266174
Unscheduled inspection
Start date: 2020-12-14, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742005266173
Unscheduled inspection
Start date: 2020-12-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742005269418
Unscheduled inspection
Start date: 2020-12-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742005272816
Unscheduled inspection
Start date: 2020-12-17, end date: 2020-12-23, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the performance of works on the Actual condition of the facility and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including the requirements of energy efficiency, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 The Urban Planning Code of the Russian Federation
# 742005272799
Unscheduled inspection
Start date: 2020-12-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742005274595
Unscheduled inspection
Start date: 2020-12-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742005274594
Unscheduled inspection
Start date: 2020-12-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742005236420
Unscheduled inspection
Start date: 2020-11-25, end date: 2020-12-01, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the device of internal finishing works with the device of vertical planning the completed stage with the device of internal engineering ventilation smoke removal systems installation of elevator equipment during the execution and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipment of the capital construction facility metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742005201381
Unscheduled inspection
Start date: 2020-10-28, end date: 2020-11-25, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742005183908
Unscheduled inspection
Start date: 2020-10-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004482623
Unscheduled inspection
Start date: 2020-08-17, end date: 2020-08-21, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of window structures during the production of works and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004478276
Unscheduled inspection
Start date: 2020-08-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004454388
Unscheduled inspection
Start date: 2020-07-16, end date: 2020-08-11, duration: 19
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on compliance with fire-fighting and sanitary-epidemiological measures measures to ensure access for low-mobility groups of the population landscaping installation of curbs, construction of roads and sidewalks of small shapes with full readiness and used building materials during construction reconstruction of a capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Code project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and requirements equipment of the capital construction facility with metering devices for used energy resources 2 Verification of the completed construction of the capital construction facility 3 Availability of a construction permit 4 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004456703
Unscheduled inspection
Start date: 2020-07-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004438701
Unscheduled inspection
Start date: 2020-06-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004437974
Unscheduled inspection
Start date: 2020-06-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004435583
Unscheduled inspection
Start date: 2020-06-22, end date: 2020-06-26, duration: 4
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of technical floor structures after completion of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004434526
Unscheduled inspection
Start date: 2020-06-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004427165
Unscheduled inspection
Start date: 2020-06-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004417539
Unscheduled inspection
Start date: 2020-05-29, end date: 2020-06-04, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of structures of 16 floors in the course of work and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31st st52 of the Urban Planning Code of the Russian Federation
# 742004410934
Unscheduled inspection
Start date: 2020-05-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004381735
Unscheduled inspection
Start date: 2020-04-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004344468
Unscheduled inspection
Start date: 2020-04-01, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742004344453
Unscheduled inspection
Start date: 2020-04-01, end date: 2020-04-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of finishing works the completed stage of work on the installation of external engineering networks the completed stage of work on the installation of ITP pumping station the completed stage compliance with measures to ensure access for low-mobility groups of the population compliance with measures to ensure fire safety compliance with measures for sanitary and epidemiological safety landscaping and applied building materials during construction reconstruction of the capital construction facility as well as the results of such work requirements project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements for with the exception of capital construction projects for which energy efficiency requirements do not apply to the requirements for equipping a capital construction facility with metering devices for used energy resources2 A completed capital construction facility 3 Availability of a construction permit 4 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004374019
Unscheduled inspection
Start date: 2020-03-25, end date: 2020-03-31, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of pile works the final stage is reinforcement and concreting of grillings in the axes "12" during the execution and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources2 The presence of a permit on construction3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004300037
Unscheduled inspection
Start date: 2020-03-03, end date: 2020-03-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of reinforced concrete structures of the basement second floor during the production of works and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources2 Availability of a construction permit 3 Compliance with the requirements hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004344274
Unscheduled inspection
Start date: 2020-03-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004315572
Unscheduled inspection
Start date: 2020-03-16, end date: 2020-03-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of internal engineering networks in the process of installation of translucent structures completed stage of work on installation of the roof completed stage of work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Code of design documentation with taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipment of the capital construction facility construction with metering devices for used energy resources2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004315608
Unscheduled inspection
Start date: 2020-03-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004344255
Unscheduled inspection
Start date: 2020-03-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004291620
Unscheduled inspection
Start date: 2020-02-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004289788
Unscheduled inspection
Start date: 2020-02-20, end date: 2020-03-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on roofing, work on filling window openings, glazing of loggias after completion of work, inspection of interior decoration, installation of internal engineering systems after completion of work, installation of elevator equipment after completion of work, compliance with fire-fighting and sanitary epidemiological measures measures to ensure access for low-mobility groups of the population facade decoration landscaping of the house territory and installation of small architectural forms after completion of work and the construction materials used in the process of construction reconstruction of a capital construction facility as well as the results of such work meet the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of information models are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Checking the completed construction of the facility 3 Availability of a construction permit 4 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004289806
Unscheduled inspection
Start date: 2020-02-21, end date: 2020-02-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of internal and external enclosing structures of 47 floors in the course of work and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004222942
Unscheduled inspection
Start date: 2020-01-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004221874
Unscheduled inspection
Start date: 2020-01-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004221880
Unscheduled inspection
Start date: 2020-01-27, end date: —, duration: —
Authority: —
Purpose of inspection: