# 00170802940704
Unscheduled inspection
Start date: 2017-12-15, end date: 2017-12-15, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: issuing permits for the commissioning of thermal power plants and heating networks
# 00170802823091
Unscheduled inspection
Start date: 2017-11-03, end date: 2017-11-03, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: issuance of a permit for the commissioning of power plants
# 742101409118
Unscheduled inspection
Start date: 2021-12-03, end date: 2021-12-06, duration: 2
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Checking the actual condition of the object. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742101436189
Unscheduled inspection
Start date: 2021-12-13, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742100072173
Unscheduled inspection
Start date: 2021-04-06, end date: 2021-05-04, duration: —
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii, kadastra i kartografii po CHelyabinskoi oblasti
Purpose of inspection: The inspection is carried out in order to determine the fact of eliminating violations of land legislation on the basis of an order to eliminate violations of land legislation.;
The objectives of the audit are to ensure that the person being audited complies with land legislation, protection and land requirements.;
the subject of the audit is the fulfillment of the instructions of the state control (supervision) bodies
# 742004489888
Unscheduled inspection
Start date: 2020-08-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004434507
Unscheduled inspection
Start date: 2020-06-22, end date: 2020-06-26, duration: 4
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of internal engineering systems as well as the compliance of the construction materials used during the construction and reconstruction of a capital construction facility with the results of such work with the requirements of the Code of Design Documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the design documentation in accordance with Parts 38 and 39 of Article 49 of the Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning the Code of the Russian Federation
# 742004377227
Unscheduled inspection
Start date: 2020-03-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004377215
Unscheduled inspection
Start date: 2020-03-26, end date: 2020-04-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of reinforced concrete structures of the ninth floor in the axes "12 AB" with the stormwater drainage system, as well as the compliance of the construction materials used during the construction and reconstruction of the capital construction facility with the results of such work with the requirements of the Code of Design Documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of the Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources2 The availability of permits for building3 Meeting the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004336463
Unscheduled inspection
Start date: 2020-03-12, end date: 2020-03-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The final stage for the repair of interior finishing works roofing facades filling window openings installation of internal engineering systems for water supply sewerage heating electricity ventilation smoke extraction fire safety systems for low-current systems installation of elevators and elevator equipment Verification of landscaping and installation of small architectural forms Verification of fire prevention sanitary and epidemiological measures measures to ensure access for low mobility groups of the population After completion of work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, meet the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of information models are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources.2 Availability of a construction permit.3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004248176
Unscheduled inspection
Start date: 2020-02-10, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742004214136
Unscheduled inspection
Start date: 2020-01-24, end date: 2020-01-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of reinforced concrete structures from the fifth to the ninth floor in the "12 AB" axes, as well as the compliance of the construction materials used during the construction and reconstruction of the capital construction facility with the results of such work with the requirements of the Code of Design Documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of the Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for used energy resources2 The availability of permits for building3 Meeting the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741904030428
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741904050624
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-16, duration: —
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po CHelyabinskoi oblasti
Purpose of inspection: Compliance with the requirements of land legislation
# 741903965864
Unscheduled inspection
Start date: 2019-11-20, end date: 2019-11-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of repair work installation of floor screeds installation of Windows plastering in axes 16AG during the production of work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources2 The presence of building permits3 Meeting the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903965767
Unscheduled inspection
Start date: 2019-11-18, end date: 2019-11-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of reinforced concrete structures from the basement to the fourth floor in the "12 AB" axes, as well as the compliance of the construction materials used during the construction and reconstruction of the capital construction facility with the results of such work with the requirements of the Code of Design Documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of the Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources2 The availability of permits for building3 Meeting the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903878679
Unscheduled inspection
Start date: 2019-10-28, end date: 2019-11-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of elevator equipment, fire protection measures, internal engineering systems, landscaping, accessibility for low-mobility groups of the population, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model in the event that the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Meeting the requirements of HR 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903815299
Unscheduled inspection
Start date: 2019-10-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741903119328
Unscheduled inspection
Start date: 2019-09-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741903599575
Unscheduled inspection
Start date: 2019-09-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902960590
Unscheduled inspection
Start date: 2019-08-19, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741902816598
Unscheduled inspection
Start date: 2019-06-26, end date: 2019-07-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on interior decoration, installation of elevator equipment, installation of internal engineering systems during the work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hr 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902690838
Unscheduled inspection
Start date: 2019-05-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902541668
Unscheduled inspection
Start date: 2019-03-11, end date: 2019-03-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the wet facade installation work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902476884
Unscheduled inspection
Start date: 2019-02-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902455671
Unscheduled inspection
Start date: 2019-01-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741802298070
Unscheduled inspection
Start date: 2018-12-18, end date: 2018-12-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed in the axes "35 AB" for the installation of internal engineering systems of elevator equipment for the installation of windows during the work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741801949562
Unscheduled inspection
Start date: 2018-11-20, end date: 2018-11-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the wet facade installation work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802090902
Unscheduled inspection
Start date: 2018-11-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741801976011
Unscheduled inspection
Start date: 2018-10-22, end date: 2018-11-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of facade finishing works, installation of elevator equipment, commissioning of internal engineering systems, finishing works, implementation of fire prevention measures and sanitary and epidemiological requirements, accessibility requirements for low-mobility groups of the population, verification of the readiness of internal engineering systems and finishing works, landscaping and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741801020874
Unscheduled inspection
Start date: 2018-10-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741801213489
Unscheduled inspection
Start date: 2018-09-17, end date: 2018-09-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of window blocks and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 ct52 of the Urban Planning Code of the Russian Federation
# 741800645306
Unscheduled inspection
Start date: 2018-08-28, end date: 2018-09-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the work in the axes "35 AB" for concreting the foundation slab, the completed stage of the installation of reinforced concrete structures from the basement to the 2nd floor and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 The availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800491426
Unscheduled inspection
Start date: 2018-07-04, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741800488184
Unscheduled inspection
Start date: 2018-07-04, end date: 2018-07-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the excavation work with the reinforcement and concreting of the foundation plate in the process of execution in the axes "35 AB" and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code of the Russian Federation
# 741800488461
Unscheduled inspection
Start date: 2018-07-03, end date: 2018-07-09, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the actual condition of the facility 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800314575
Unscheduled inspection
Start date: 2018-05-14, end date: 2018-05-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the construction of foundations during the construction process and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 ct52 of the Urban Planning Code of the Russian Federation
# 741800273378
Unscheduled inspection
Start date: 2018-04-23, end date: 2018-04-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of elevator equipment, facade finishing, installation of internal engineering systems during the execution and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800222041
Unscheduled inspection
Start date: 2018-03-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800060734
Unscheduled inspection
Start date: 2018-02-26, end date: 2018-03-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of monolithic diaphragms DM2 on the 16th floor of the monolithic floor of the 16th floor of otm + 48500 masonry exterior interior walls and partitions during the construction process and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 00170802940704
Unscheduled inspection
Start date: 2017-12-15, end date: 2017-12-15, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: issuing permits for the commissioning of thermal power plants and heating networks
# 74170802956108
Unscheduled inspection
Start date: 2017-12-11, end date: 2017-12-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of monolithic DM2 diaphragms on the 14th and 15th floors of the monolithic floor of the 15th floor of otm + 45500 and the 14th floor of otm +42500 completion of masonry work on the exterior interior walls and partitions of the 11th floor in the process of finishing the facade during the work and the construction materials used during the construction of the capital construction facility, as well as the results of such requirements of the technical regulations of the project documentation2 Obtaining a construction permit3compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 00170802823091
Unscheduled inspection
Start date: 2017-11-03, end date: 2017-11-03, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: issuance of a permit for the commissioning of power plants
# 74170802820250
Unscheduled inspection
Start date: 2017-11-13, end date: 2017-11-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of precast reinforced concrete columns from the 12th to the 16th floor of the monolithic DM2 diaphragm on the 12th and 13th floors completion of the monolithic floor covering on the 13th floor of otm + 39500 and on the 14th floor of otm +42500 completion of the masonry work on the exterior interior walls and partitions of the 11th floor in the process of finishing the facade in the process of work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, the requirements of the technical regulations of the project documentation 2The receipt of a construction permit 3The fulfillment of the requirements of HH 23 and 31st52 of the Urban Planning Code of the Russian Federation
# 74170802582623
Unscheduled inspection
Start date: 2017-09-29, end date: 2017-10-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170701756427
Unscheduled inspection
Start date: 2017-07-04, end date: 2017-07-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The completion of work on the monolithic floor covering of the 10th floor of otm 30500 completion of work on the 11th floor of otm 33500 in the process of installation of monolithic diaphragm DM2 on 1011 floors completion of work on the installation of prefabricated reinforced concrete columns of the 5th tier of otm 2850034500 completion of work on the masonry of the exterior interior walls and partitions of the 9th floor in the process and the construction materials used during the construction of the capital construction facility as well as the results of such work to the requirements of the technical regulations of the project documentation2 Obtaining a construction permit3 Complying with the requirements of HR 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701685539
Unscheduled inspection
Start date: 2017-06-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701615258
Unscheduled inspection
Start date: 2017-05-19, end date: 2017-05-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of monolithic diaphragm DM2 on 7-9 floors of monolithic floor covering 7th floor otm 21500 8th floor otm 24500 9th floor otm 27500 installation of precast reinforced concrete columns 4 tiers otm 2250028500 5th tiers otm 2850034500 in progress masonry exterior interior walls and partitions 68 floors in progress and applied building materials during construction the capital construction facility as well as the results of such work meet the requirements of the technical regulations of the project documentation2 Receipt of a construction permit3compliance with the requirements of HH 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701609847
Unscheduled inspection
Start date: 2017-05-16, end date: 2017-05-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of PVC profile window and balcony blocks during the installation of internal engineering systems for heating water supply, drainage, and smoke ventilation during the construction process and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 00170701658763
Unscheduled inspection
Start date: 2017-05-29, end date: 2017-05-30, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: issuance of a permit for the commissioning of power plants
# 74170701428168
Unscheduled inspection
Start date: 2017-03-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701363472
Unscheduled inspection
Start date: 2017-02-14, end date: 2017-02-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The completion of work on the roof installation, the completion of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, comply with the requirements of the technical regulations of the project documentation2the receipt of a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701302818
Unscheduled inspection
Start date: 2017-01-23, end date: 2017-01-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of a monolithic floor covering of the 4th floor of OTM +12500 monolithic floor covering of the 5th floor of OTM +15500 in the process of performing a DM2 diaphragm on the 5th floor in the process of masonry exterior interior walls and partitions of 12 floors and the building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the need for permits for building3compliance with the requirements of HR 23 ST52 of the Urban Planning Code of the Russian Federation
# 74160701211096
Unscheduled inspection
Start date: 2016-12-15, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74160701224073
Unscheduled inspection
Start date: 2016-12-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160701077263
Unscheduled inspection
Start date: 2016-11-10, end date: 2016-11-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of floor slabs on the 12th and 13th floors, the masonry of the exterior interior walls and partitions on the 13th floor, the masonry of the exterior interior walls and partitions on the 14th floor during the execution and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The need for a construction permit3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701131606
Unscheduled inspection
Start date: 2016-11-24, end date: 2016-11-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of internal engineering systems and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701110680
Unscheduled inspection
Start date: 2016-11-22, end date: 2016-11-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the monolithic floor covering of the 3rd floor otm +9500 of the DM2 diaphragm on 34 floors with the installation of precast reinforced concrete columns of the 2nd tier OTM 1050016500 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700861904
Unscheduled inspection
Start date: 2016-09-29, end date: 2016-10-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of floor slabs on the 711th floor, the masonry of the exterior interior walls and partitions on the 811th floor, the masonry of the exterior interior walls and partitions on the 12th floor during the process, the plastering of the walls on the 6th floor during the process, and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3 requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700604138
Unscheduled inspection
Start date: 2016-09-19, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74160601714656
Unscheduled inspection
Start date: 2016-07-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160601714686
Unscheduled inspection
Start date: 2016-07-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160601714625
Unscheduled inspection
Start date: 2016-07-19, end date: 2016-07-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of finishing works in common areas, electrical installation works in the process of landscaping the adjacent territory during the process and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation