# 672101201503
Unscheduled inspection
Start date: 2021-10-11, end date: —, duration: 2
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This audit is conducted in order to confirm the information provided by the chief specialist of the industrial and civil construction supervision Sector of the State Construction Supervision Department Potapova M.A. in a reasoned submission dated 09/14/2021 No. b/n based on the results of consideration of the appeal of the Deputy Head of the City of Smolensk – Head of the Department of Architecture and Urban Planning of the Smolensk City Administration – Chief Architect N.B. Vasnetsov (No. Vx-17306 dated 09/03/2021).
The subject of this audit is the verification:
- carrying out measures to prevent harm to the life and health of citizens;