# 742004386342
Unscheduled inspection
Start date: 2020-04-06, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742004327482
Unscheduled inspection
Start date: 2020-03-23, end date: 2020-04-06, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu proverki vypolneniya OOO GK «YUzhnaya Korona» punktov ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii ot 13122019 Sv6035r2
# 742004316800
Unscheduled inspection
Start date: 2020-03-03, end date: 2020-03-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the construction of the GTS enclosing dam up to otm 2840 m installation of foundations and metal structures for the overpasses of the main and pressure pulp pipelines installation of foundations and metal structures of buildings of the switching unit and the pumping station of circulating water installation of pipelines of the main and pressure pulp pipelines installation of pressure water pipelines and construction materials used in the construction process reconstruction of the capital construction facility as well as the results of such the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including the requirements of energy efficiency with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004302954
Unscheduled inspection
Start date: 2020-02-25, end date: 2020-03-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of load-bearing structures of a pedestrian tunnel 1st stage of the pulp pipeline overpass to PNC1 the end of the overpass with supply pulp pipelines the end of the overpass with recycled water pipelines the end of the upper drain tank the 1st stage of the load-bearing structures of a technical building with ABC the end of the construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements approved in accordance with with parts 15 152 and 153 of Article 48 of this Code of project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities buildings for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004258488
Unscheduled inspection
Start date: 2020-02-10, end date: 2020-02-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 1 Compliance of work on the construction of a pulp pipeline 2 threads construction of a patrol road construction of a pulp pump station PNS 1 PNS 2 PNS 3 construction of a crossing 2 through the railway of PTU LLC construction of a crossing 1 through the railway of Russian Railways construction of a crossing 1 through the highway Chelyabinsk Troitsk construction of a switching chamber construction of an emergency tank 1 2 and construction materials used in the construction of reconstruction the capital construction object as well as the results of such work meet the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements this Code, including the requirements of energy efficiency, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004187895
Unscheduled inspection
Start date: 2020-01-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741904074620
Unscheduled inspection
Start date: 2019-12-16, end date: 2019-12-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu nesuschih konstrukcii kommunikacionnogo tonnelya 1yi etap nesuschih konstrukcii podpornyh stenok 1yi etap vnutriploschadochnyh inzhenernyh setei 1yi etap fundamentov tehnicheskogo zdaniya s ABK okonchanie nesuschih konstrukcii sgustitelei 1yi etap naruzhnogo elektroosvescheniya 1yi etap estakady pulpoprovodov k PNS1 1i etap estakady s padayuschimi pulpoprovodami 1yi etap i sanitarnoepidemiologicheskih trebovanii i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741904030868
Unscheduled inspection
Start date: 2019-11-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902934106
Unscheduled inspection
Start date: 2019-08-26, end date: —, duration: —
Authority: —
Purpose of inspection: