Found 18 inspections:

# 262101370002
Unscheduled inspection
Start date: 2021-11-19, end date: —, duration: 20
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: the inspection is carried out for the purpose of: stage 3 of the inspection program dated 02/01/2021 No. 27/01-2021 (work on the installation of structures on the 1st floor), the objectives of this inspection are to prevent, identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, technical customer, person carrying out construction, the subject of this The verification is: - compliance with the procedure for conducting construction control, maintaining general and (or) special work logs, executive documentation, drawing up acts of inspection of works, structures, sections of engineering and technical support networks; - compliance with the compliance of the work performed and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved project documentation;- compliance with mandatory requirements and (or) requirements established by municipal legal acts; - holding events:


# 262005212635
Unscheduled inspection
Start date: 2020-11-05, end date: 2020-12-02, duration: 20
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: inspection program from 27062019 08022019 stage 5 prevention detection and suppression of violations of the legislation on urban planning activities committed by the developer, the technical customer, the person carrying out construction, including technical regulations and design documentation compliance with the procedure for conducting construction control, maintaining general and or special logs of work, executive documentation, drawing up certificates of inspection of works of structures of sections of engineering support networks, compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used


# 262004480908
Unscheduled inspection
Start date: 2020-08-25, end date: —, duration:
Authority:
Purpose of inspection:


# 262004480605
Unscheduled inspection
Start date: 2020-07-27, end date: 2020-08-21, duration:
Authority: Gosudarstvennaya inspekciya truda v Stavropolskom krae
Purpose of inspection: implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms on the basis of the instruction of Deputy Prime Minister of the Russian Federation TA Golikova dated December 27, 2019 TG 1211486 of the Rostrud Order dated February 07, 2020 29 "On conducting unscheduled on-site inspections of compliance by employers engaged in activities in the field of construction state normative requirements for labor protection and proper registration of employment contracts with employees or the conclusion of civil law contracts actually regulating labor relations between an employee and an employer"


# 262004410459
Unscheduled inspection
Start date: 2020-05-19, end date: 2020-06-16, duration:
Authority: Ministerstvo stroitelstva i arhitektury Stavropolskogo kraya
Purpose of inspection: inspection program from 27062019 08022019 stage 3 prevention detection and suppression of violations of the legislation on urban planning activities committed by the developer, the technical customer, the person carrying out construction, including technical regulations and design documentation compliance with the procedure for conducting construction control, maintaining general and or special logs of work, executive documentation, drawing up certificates of inspection of works of structures of sections of engineering support networks, compliance with other requirements when performing work the requirements established by the design documentation, including requirements for energy efficiency and requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with mandatory requirements and or requirements established by municipal legal acts, and implementation of measures


# 262004240723
Unscheduled inspection
Start date: 2020-01-30, end date: 2020-02-26, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: notification of LLC Specialized Developer Prospect vx 190105 dated 13012020 on the completion dates of works that are subject to verification stages 1 2 inspection program dated 27062019 08022019 prevention identification and suppression of violations of the legislation on urban development by the developer, the technical customer, the person carrying out construction, including technical regulations and design documentationcompliance with the procedure for conducting construction control conducting general and or special logs of works of executive documentation preparation of acts of inspection of works of structures of sections of engineering and technical support networks compliance with other requirements when performing works established by design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for energy resources used compliance with mandatory requirements and or requirements established by municipal legal acts holding events


# 26170803034140
Unscheduled inspection
Start date: 2017-12-26, end date: —, duration:
Authority:
Purpose of inspection:


# 26170803033545
Unscheduled inspection
Start date: 2017-12-26, end date: 2018-01-30, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: notice of completion of construction dated 22/122017 inspection program 27062015 dated 27112015 the tasks of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or technical customer hereinafter the contractor, compliance with mandatory requirements and or requirements established by municipal authorities by legal acts, compliance with the instructions of state control bodies, supervision bodies of municipal control, carrying out measures to prevent harm to the life and health of citizens, harm to animals, plants, the environment, cultural heritage sites, historical and cultural monuments of the peoples of the Russian Federation, to prevent the occurrence of natural and man-made emergencies, to eliminate the consequences of such harm


# 26170803022053
Unscheduled inspection
Start date: 2017-12-21, end date: 2018-01-25, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: notification of the completion dates of the works to be inspected dated 18122017 the inspection program 27072015 dated 27112015 the tasks of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or technical customer hereinafter the contractor, violations of legislation on urban development, including technical regulations and project documentation, compliance with mandatory requirements and or compliance with the requirements established by municipal legal acts compliance with the instructions of state control bodies supervision of municipal control bodies carrying out measures to prevent harm to the life and health of citizens, harm to animals, plants, the environment, cultural heritage sites, historical and cultural monuments of the peoples of the Russian Federation, to prevent the occurrence of natural and man-made emergencies, to eliminate the consequences of such harm


# 26170803022002
Unscheduled inspection
Start date: 2017-12-21, end date: 2018-01-25, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: notification of the completion dates of the works to be inspected dated 18122017 the inspection program 27062015 dated 27112015 the objectives of this inspection are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or technical customer hereinafter the contractor, compliance with mandatory requirements and or the requirements established by municipal legal acts compliance with the instructions of state control bodies supervision of municipal control bodies carrying out measures to prevent harm to the life and health of citizens harm to animals plants the environment objects of cultural heritage monuments of history and culture of the peoples of the Russian Federation to prevent the occurrence of emergency situations of a natural and man-made nature to eliminate the consequences of causing such harm


# 26170701907234
Unscheduled inspection
Start date: 2017-08-15, end date: 2017-09-11, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: notice of completion of construction from 0908 2017 the program of inspections 27082014 from 25032014 the tasks of this inspection are the prevention identification and suppression of violations of the legislation on urban development, including technical regulations and design documentation of compliance with the execution of works and applied building materials committed by the developer, the technical customer and the person carrying out construction on the basis of an agreement with the developer or the technical customer hereinafter the contractor. in the process of construction reconstruction of the capital construction facility as well as the results of such work, the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, the need for construction permits to comply with the requirements established by parts 2 3 and 31 of Article 52 of this Code


# 26170701639267
Unscheduled inspection
Start date: 2017-05-23, end date: 2017-06-20, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: notification of the completion dates of the works to be inspected dated 1705 2017 the inspection program 27062015 dated 27112015 the tasks of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or technical customer hereinafter the contractor, compliance with mandatory requirements and or the requirements established by municipal legal acts


# 26160701248562
Unscheduled inspection
Start date: 2016-12-12, end date: 2017-01-13, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: notice 4 dated 7122016 on the completion dates of works that are subject to verification by LLC "Kurortyugstroy" the objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or technical customer, hereinafter referred to as the contractor, compliance with mandatory requirements of certain The Urban Planning Code of the Russian Federation and other normative legal acts of the Russian Federation correspond to the information contained in the certificate of admission issued by the SRO to the work performed


# 26160701248559
Unscheduled inspection
Start date: 2016-12-12, end date: 2017-01-13, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: notice 6 dated 7122016 on the completion dates of works that are subject to verification the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or technical customer hereinafter the contractor, compliance with mandatory requirements defined by the Urban Planning Code of the Russian Federation and other normative legal acts of the Russian Federation correspond to the information contained in the certificate of admission issued by the SRO to the work performed


# 26160701248557
Unscheduled inspection
Start date: 2016-12-12, end date: —, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection:


# 26160701146480
Unscheduled inspection
Start date: 2016-11-14, end date: 2016-12-09, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: notice 3 of 9112016 on the completion dates of works that are subject to verification by LLC "Kurortyugstroy" the objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or technical customer, hereinafter referred to as the contractor, compliance with mandatory requirements of certain The Urban Planning Code of the Russian Federation and other normative legal acts of the Russian Federation correspond to the information contained in the certificate of admission issued by the SRO to the work performed


# 26160701146431
Unscheduled inspection
Start date: 2016-11-14, end date: 2016-12-09, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: notice 1 of 9112016 on the completion dates of works that are subject to verification by LLC Kurortyugstroy, the objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the technical customer, hereinafter referred to as the contractor, compliance with mandatory requirements of certain The Urban Planning Code of the Russian Federation and other normative legal acts of the Russian Federation correspond to the information contained in the certificate of admission issued by the SRO to the work performed


# 26160701145492
Unscheduled inspection
Start date: 2016-11-14, end date: 2016-12-09, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: notice 3 of 9112016 on the completion dates of works that are subject to verification by LLC "Kurortyugstroy" the objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or technical customer, hereinafter referred to as the contractor, compliance with mandatory requirements of certain The Urban Planning Code of the Russian Federation and other normative legal acts of the Russian Federation correspond to the information contained in the certificate of admission issued by the SRO to the work performed


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.