# 742101350784
Unscheduled inspection
Start date: 2021-11-29, end date: 2021-12-03, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the construction of the frame of the building on the 10th, 11th, 12th, 13th floor after the actual completion and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes, included in the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects for which energy efficiency requirements they do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742004415712
Unscheduled inspection
Start date: 2020-05-26, end date: 2020-05-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of entrance groups, the device of internal walls and partitions in axes 14, the device of translucent structures during the production of works and building materials used during the construction of reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account changes made to project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices used energy resources2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004202792
Unscheduled inspection
Start date: 2020-01-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741903873712
Unscheduled inspection
Start date: 2019-10-23, end date: 2019-10-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of a monolithic reinforced concrete frame of a building in axes 13 brickwork in axes 710 during the production of works of building materials used during the construction reconstruction of a capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903902656
Unscheduled inspection
Start date: 2019-10-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902720415
Unscheduled inspection
Start date: 2019-05-22, end date: 2019-05-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of the roof filling of window openings bricklaying of walls and partitions and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902594318
Unscheduled inspection
Start date: 2019-04-16, end date: 2019-04-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the regulation of 27022019 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902512271
Unscheduled inspection
Start date: 2019-02-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741802026406
Unscheduled inspection
Start date: 2018-11-07, end date: 2018-11-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during the installation of the frame of the 3rd floor building and the building materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800950014
Unscheduled inspection
Start date: 2018-09-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800965269
Unscheduled inspection
Start date: 2018-09-12, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741800381040
Unscheduled inspection
Start date: 2018-05-24, end date: 2018-05-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the device of the load-bearing structures of the fourth floor of masonry work of external walls as well as the construction materials used in the construction of a capital construction facility with the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation