# 772105307819
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-02-05, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po g. Moskve
Purpose of inspection: control over the execution of GPN regulation No. 123/1/1
dated 13.06.2019 on the elimination of violations of fire safety requirements, on the implementation of measures to ensure fire safety at protective facilities and to prevent the threat of fire