Found 47 inspections:

# 00170802716958
Unscheduled inspection
Start date: 2017-10-16, end date: —, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 742201503785
Unscheduled inspection
Start date: 2022-01-19, end date: 2022-01-25, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of foundations (at the end of the work), installation of load-bearing and enclosing structures on the 1st, 2nd floor (in the course of work). and the construction materials used in the process of construction, reconstruction of the capital construction facility, as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742101375136
Unscheduled inspection
Start date: 2021-12-06, end date: 2021-12-10, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of excavation work, foundation construction (in the course of work) and construction materials used during construction, reconstruction of a capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account changes made to the design documentation documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742101375160
Unscheduled inspection
Start date: 2021-12-06, end date: 2021-12-10, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on the installation of load-bearing and enclosing structures on the 3rd, 4th, 5th, 6th floor (at the end of work), installation of load-bearing and enclosing structures on the 7th-10th floor (during work), installation of internal and external engineering networks (during work), electrical work (during work). and the construction materials used in the process of construction, reconstruction of the capital construction facility, as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100795766
Unscheduled inspection
Start date: 2021-10-05, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742100410271
Unscheduled inspection
Start date: 2021-08-17, end date: 2021-08-23, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Verification of the execution of the order dated 07/22/2021 with a deadline of execution until 07/27/2021. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100345957
Unscheduled inspection
Start date: 2021-07-26, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742100300010
Unscheduled inspection
Start date: 2021-06-28, end date: —, duration:
Authority:
Purpose of inspection:


# 742004402962
Unscheduled inspection
Start date: 2020-04-30, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 742004358937
Unscheduled inspection
Start date: 2020-03-20, end date: 2020-04-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004295068
Unscheduled inspection
Start date: 2020-02-28, end date: —, duration:
Authority:
Purpose of inspection:


# 741904096315
Unscheduled inspection
Start date: 2019-12-20, end date: 2019-12-26, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of internal water supply and sewerage systems finishing works with the installation of external 04 kV power supply of building materials used during the construction reconstruction of a capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account changes made to the project documentation in accordance with in parts 38 and 39 of Articles 49 of the Urban Planning Code of the Russian Federation and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipping the capital construction facility with metering devices for used energy resources2 The availability of a permit on construction3 Compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741903958142
Unscheduled inspection
Start date: 2019-11-26, end date: 2019-12-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the painting of facades with the device of inter-panel seams of the building materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of this Code and or information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation


# 741903312952
Unscheduled inspection
Start date: 2019-09-16, end date: —, duration:
Authority:
Purpose of inspection:


# 741902719498
Unscheduled inspection
Start date: 2019-05-23, end date: —, duration:
Authority:
Purpose of inspection:


# 741902662481
Unscheduled inspection
Start date: 2019-04-29, end date: 2019-05-08, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of load-bearing and enclosing structures of external and internal walls of floor slabs of the 10th floor of floor slabs 34 block sections installation of window blocks of building materials used during the construction of a capital construction facility as well as the results of such work with the requirements of design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902570229
Unscheduled inspection
Start date: 2019-03-29, end date: 2019-04-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of load-bearing and enclosing structures of external and internal walls of floor slabs 789 floors 34 block sections of building materials used during the construction of a capital construction facility as well as the results of such work with the requirements of design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902483435
Unscheduled inspection
Start date: 2019-02-19, end date: 2019-02-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of load-bearing and enclosing structures of external and internal walls of floor slabs 456 floors 34 block sections of building materials used during the construction of a capital construction facility as well as the results of such work with design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902331811
Unscheduled inspection
Start date: 2019-01-15, end date: 2019-01-21, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of load-bearing and enclosing structures of external and internal walls of floor slabs 3 floors 34 block sections of materials used in the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations and design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802199856
Unscheduled inspection
Start date: 2018-12-11, end date: 2018-12-17, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of load-bearing and enclosing structures of external and internal walls of floor slabs 910 of those floors and floor slabs 12 of the block sections of materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations and design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802149812
Unscheduled inspection
Start date: 2018-11-27, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741802021614
Unscheduled inspection
Start date: 2018-11-08, end date: 2018-11-14, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of external and internal walls of the 56th floor floor slabs with the materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations and design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 001802200533
Unscheduled inspection
Start date: 2018-11-19, end date: 2018-11-30, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The inspection is carried out in order to comply with Rostechnadzor Order No. 85 dated March 15, 2017 "On inspections of organizations operating tower cranes" on the basis of instructions from Deputy Prime Minister of the Russian Federation AG Khloponin dated February 8, 2017 AHP9682 "On the organization and conduct of unscheduled inspections of organizations operating tower cranes from 2017 to 2019" The objectives of this inspection are prevention detection and suppression of violations of mandatory requirements established by federal laws and other regulatory acts of the Russian Federation in the field of industrial safety and technical regulation of mandatory requirements taking measures to eliminate violations of mandatory requirements in case of their detection and to bring to justice persons who have committed violations of the requirements of federal laws and other regulatory legal acts The subject of this audit is compliance by a legal entity with the requirements of federal laws and other regulatory legal acts. in the course of carrying out the activities of mandatory industrial safety requirements in the design construction operation conservation and liquidation of hazardous production facilities manufacture installation commissioning maintenance and repair of technical devices of lifting cranes used at hazardous production facilities compliance with the specified requirements of buildings premises structures equipment and materials used as well as requirements for machinery and equipment and related requirements for these products operation processes and recycling


# 741801892077
Unscheduled inspection
Start date: 2018-10-09, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741800680714
Unscheduled inspection
Start date: 2018-09-05, end date: —, duration:
Authority:
Purpose of inspection:


# 741800619323
Unscheduled inspection
Start date: 2018-08-15, end date: —, duration:
Authority:
Purpose of inspection:


# 741800397082
Unscheduled inspection
Start date: 2018-05-31, end date: 2018-06-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of external and internal walls of the basement floor floor slabs before the installation of load-bearing and enclosing structures of the 1st floor for the installation of HVAC networks during the work process of the materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations and design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800007535
Unscheduled inspection
Start date: 2018-01-29, end date: —, duration:
Authority:
Purpose of inspection:


# 74170802935621
Unscheduled inspection
Start date: 2017-12-08, end date: 2018-01-12, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802966212
Unscheduled inspection
Start date: 2017-12-26, end date: —, duration:
Authority:
Purpose of inspection:


# 00170802851999
Unscheduled inspection
Start date: 2017-11-20, end date: 2017-11-22, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Checking the technical condition and safe operation of the electrical power supply installation of a residential building at the address Chelyabinsk region Magnitogorsk Lesoparkovaya street d 93 building 2


# 00170802716958
Unscheduled inspection
Start date: 2017-10-16, end date: 2017-10-20, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to issue a permit for the commissioning of a power plant on the basis of an application from the head of the SLE 01823 dated 18092017xx H 13518 dated 27092017. The objectives of this inspection are to carry out measures to control the technical condition and safe operation of thermal power plants of a residential building at Lesoparkovaya Street d 931 Magnitogorsk Chelyabinsk. The subject of this inspection is the compliance of the information contained in the application and documents of the legal entity a person or an individual entrepreneur on granting the legal status of a special permit license for the right to carry out certain types of activities or permit approval for other legally significant actions if conducting an appropriate unscheduled inspection of a legal entity individual entrepreneur is provided for by the rules for granting the legal status of a special permit license issuance of a permit approval of mandatory requirements as well as data on these legal entities and individual entrepreneurs contained in the the unified State Register of Legal entities the unified State Register of individual entrepreneurs and other federal information resources


# 74170802753713
Unscheduled inspection
Start date: 2017-10-30, end date: 2017-11-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of finishing works on external power supply networks landscaping of the house territory and installation of small architectural forms verification of compliance with sanitary and epidemiological requirements and fire safety of materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations and design documentation2 Availability of construction permits 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802581519
Unscheduled inspection
Start date: 2017-09-27, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701838807
Unscheduled inspection
Start date: 2017-08-24, end date: 2017-08-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of load-bearing and enclosing structures of external and internal walls of floor slabs of 810 floors of the technical floor of the parapet before the start of work on the waterproofing of the roof filling window openings of 110 floors installation of a heating system of 110 floors during the work installation of water supply and sewerage systems telephone and radio networks installation of internal electrical networks during the work of materials used in during the construction of a capital construction facility as well as the results of such work to the requirements of technical regulations and design documentation2 The presence of a construction permit 3 Compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170701834163
Unscheduled inspection
Start date: 2017-07-25, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74170701696561
Unscheduled inspection
Start date: 2017-06-27, end date: 2017-07-03, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of load-bearing and enclosing structures of external and internal walls of floor slabs of 47 floors prior to the installation of load-bearing and enclosing structures of the 8th floor of the materials used during the construction of the capital construction facility as well as the results of such work to the requirements of technical regulations and design documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701576134
Unscheduled inspection
Start date: 2017-05-04, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701494837
Unscheduled inspection
Start date: 2017-04-07, end date: 2017-04-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of supporting structures of the ground floor external and internal walls of the floor before the installation of external and internal wall panels of the 1st floor of the materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations and design documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701444092
Unscheduled inspection
Start date: 2017-03-21, end date: 2017-03-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the excavation work with the foundation of the materials used in the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701219050
Unscheduled inspection
Start date: 2016-12-12, end date: 2017-01-13, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701265052
Unscheduled inspection
Start date: 2016-12-28, end date: 2017-01-31, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701204386
Unscheduled inspection
Start date: 2016-12-06, end date: 2016-12-09, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of load-bearing structures of external and internal walls floor slabs of staircases and platforms of the 5th floor and technical floor of the building windows completion of external and internal networks completion of landscaping winter version implementation of fire-fighting and sanitary epidemiological norms and building materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701070335
Unscheduled inspection
Start date: 2016-11-07, end date: 2016-11-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of load-bearing structures of external and internal walls floor slabs of staircases and platforms of the 2nd, 3rd and 4th floors windows external and internal engineering networks and building materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 Urban Planning the Code of the Russian Federation


# 74160700794914
Unscheduled inspection
Start date: 2016-10-03, end date: 2016-10-07, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of load-bearing structures of external and internal walls floor slabs of staircases and platforms of the ground and 1st floor and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160700050337
Unscheduled inspection
Start date: 2016-09-01, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74160601737464
Unscheduled inspection
Start date: 2016-08-02, end date: 2016-08-08, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: Compliance of the work on the installation of pile works and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation