Found 27 inspections:

# 00150601076143
Unscheduled inspection
Start date: 2015-10-19, end date: 2015-10-23, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Decision-making by the licensing authority on granting a license to Granit LLC for the operation of explosion- and fire-hazardous and chemically hazardous production facilities of hazard classes I II and III


# 00150601076132
Unscheduled inspection
Start date: 2015-10-05, end date: 2015-10-23, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Decision-making by the licensing authority on granting a license to Granit LLC for the operation of explosion- and fire-hazardous and chemically hazardous production facilities of hazard classes I II and III


# 342004438813
Unscheduled inspection
Start date: 2020-07-03, end date: 2020-07-13, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject is compliance with mandatory requirements in relation to compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model in if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, b availability of a construction permit, c compliance with the requirements set out in parts 2, 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation


# 342004430593
Unscheduled inspection
Start date: 2020-06-10, end date: 2020-06-23, duration: 9
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: the purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and project documentation tasks prevention identification and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation subject to compliance with mandatory requirements regarding a compliance with the performance of works and construction materials used in the construction process of reconstruction of a capital construction facility also, the results of such work meet the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code The Russian Federation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used b availability of a construction permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 342004408568
Unscheduled inspection
Start date: 2020-05-15, end date: 2020-05-25, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject is compliance with mandatory requirements in relation to compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model in if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, b availability of a construction permit, c compliance with the requirements set out in parts 2, 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation


# 342004408317
Unscheduled inspection
Start date: 2020-05-15, end date: 2020-05-25, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject is compliance with mandatory requirements in relation to compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model in if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, b availability of a construction permit, c compliance with the requirements set out in parts 2, 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation


# 341903542716
Unscheduled inspection
Start date: 2019-09-27, end date: 2019-10-08, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentationproblem prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentationproblem compliance with mandatory requirements in relation to the conformity of work and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation of and maintaining an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources, availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341902850188
Unscheduled inspection
Start date: 2019-07-19, end date: 2019-07-29, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentationsubject compliance with mandatory requirements in relation to compliance with construction works, their results, and the construction materials used meet the requirements of the project documentation and the availability of a construction permit and the fulfillment of the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341902702178
Unscheduled inspection
Start date: 2019-05-17, end date: 2019-05-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentationsubject compliance with mandatory requirements in relation to compliance with construction works, their results, and the construction materials used meet the requirements of the project documentation and the availability of a construction permit and the fulfillment of the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341801967731
Unscheduled inspection
Start date: 2018-10-26, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:


# 341801696337
Unscheduled inspection
Start date: 2018-10-05, end date: 2018-10-15, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject is compliance with mandatory requirements in relation to compliance of construction works, their results and the applied building materials with the requirements of the project documentation b availability of a building permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341800650916
Unscheduled inspection
Start date: 2018-09-10, end date: 2018-09-18, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection fire safety requirements and sanitary and epidemiological welfare of the population and project documentation The task is to prevent identify and suppress violations of the legislation of the Russian Federation and project documentation The subject is compliance with mandatory requirements regarding a compliance of construction works with their results and applied building materials with the requirements b the availability of a construction permit c the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341800578922
Unscheduled inspection
Start date: 2018-08-01, end date: 2018-08-10, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject is compliance with mandatory requirements in relation to compliance of construction works, their results and the applied building materials with the requirements of technical regulations and project documentation b availability of a construction permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341800463844
Unscheduled inspection
Start date: 2018-06-27, end date: 2018-07-10, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject is compliance with mandatory requirements in relation to compliance of construction works, their results and the applied building materials with the requirements of technical regulations and project documentation b availability of a construction permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 341800386738
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-06-13, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and project documentation, the task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, the subject is compliance with mandatory requirements in relation to compliance of construction works, their results and the applied building materials with the requirements of technical regulations and project documentation b availability of a construction permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 34170801930181
Unscheduled inspection
Start date: 2017-09-13, end date: 2017-09-21, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation The task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation The subject is compliance with mandatory requirements with regard to a the compliance of construction works with their results and the construction materials used with the requirements of technical regulations of project documentation b the availability of a construction permit c compliance with the established requirements for admission to construction work


# 34170801916023
Unscheduled inspection
Start date: 2017-09-08, end date: 2017-09-18, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation The task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation The subject is compliance with mandatory requirements with regard to a the compliance of construction works with their results and the construction materials used with the requirements of technical regulations of project documentation b the availability of a construction permit c compliance with the established requirements for admission to construction work


# 34170802577821
Unscheduled inspection
Start date: 2017-09-25, end date: 2017-10-03, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of urban planning legislation of the Russian Federation legislation of the Russian Federation in the field of environmental protection fire safety requirements and sanitary and epidemiological welfare of the population, including technical regulations and design documentationproblems prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and design documentationproblems compliance with mandatory requirements in relation to compliance with construction works their results and the applied building materials meet the requirements of technical regulations of the project documentation, the availability of a construction permit, and the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 34170701696276
Unscheduled inspection
Start date: 2017-06-15, end date: 2017-06-26, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation The task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation The subject is compliance with mandatory requirements with regard to a the compliance of construction works with their results and the construction materials used with the requirements of technical regulations of project documentation b the availability of a construction permit c compliance with the established requirements for admission to construction work


# 34170701718002
Unscheduled inspection
Start date: 2017-06-20, end date: 2017-06-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation The task is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation The subject is compliance with mandatory requirements with regard to a the compliance of construction works with their results and the construction materials used with the requirements of technical regulations of project documentation b the availability of a construction permit c compliance with the established requirements for admission to construction work


# 34160701043311
Unscheduled inspection
Start date: 2016-10-28, end date: 2016-12-08, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Purpose assessment of compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and requirements for equipment of the capital construction facility with metering devices for energy resources used, including technical regulations and design documentation The task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation The subject of this audit compliance with mandatory requirements regarding a compliance of construction works with their results and applied building materials with the requirements of technical regulations of project documentation b availability of a construction permit c compliance with the established requirements for admission to construction work


# 34160701043085
Unscheduled inspection
Start date: 2016-10-28, end date: 2016-11-08, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Purpose assessment of compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and requirements for equipment of the capital construction facility with metering devices for energy resources used, including technical regulations and design documentation The task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentation The subject of this audit compliance with mandatory requirements regarding a compliance of construction works with their results and applied building materials with the requirements of technical regulations of project documentation b availability of a construction permit c compliance with the established requirements for admission to construction work


# 34160601745273
Unscheduled inspection
Start date: 2016-08-05, end date: 2016-08-15, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation tasks prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation Subject compliance with mandatory requirements in relation to compliance construction works, their results and the construction materials used, the requirements of technical regulations, design documentation, the availability of a construction permit, and the fulfillment of established requirements for admission to construction work


# 34160601737756
Unscheduled inspection
Start date: 2016-07-27, end date: 2016-08-04, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation tasks prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation Subject compliance with mandatory requirements in relation to compliance construction works, their results and the construction materials used, the requirements of technical regulations, design documentation, the availability of a construction permit, and the fulfillment of established requirements for admission to construction work


# 34160601737654
Unscheduled inspection
Start date: 2016-07-27, end date: —, duration:
Authority:
Purpose of inspection:


# 00150601076143
Unscheduled inspection
Start date: 2015-10-19, end date: 2015-10-23, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Decision-making by the licensing authority on granting a license to Granit LLC for the operation of explosion- and fire-hazardous and chemically hazardous production facilities of hazard classes I II and III


# 00150601076132
Unscheduled inspection
Start date: 2015-10-05, end date: 2015-10-23, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Decision-making by the licensing authority on granting a license to Granit LLC for the operation of explosion- and fire-hazardous and chemically hazardous production facilities of hazard classes I II and III


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.