Found 1 inspection:

# 562004330090
Unscheduled inspection
Start date: 2020-03-20, end date: 2020-03-26, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: Implementation of regional state construction supervision identification and suppression of violations of the requirements of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources legislation on urban development c2 st51 h 26 art 52 of the Urban Planning Code of the Russian Federation compliance with the performance of work and the construction materials used during the construction of a capital construction facility, as well as the results of such requirements of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.