Found 1 inspection:

# 782100312520
Unscheduled inspection
Start date: 2021-06-29, end date: —, duration: 19
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy Sankt-Peterburga
Purpose of inspection: Goal: Determination of compliance of the constructed capital construction facility with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources. The objectives of this review are: Prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of the project documentation performed during the construction and reconstruction of capital construction facilities. The subject of the check is: Inspection of the completed facility, including the implementation of fire prevention measures, measures to ensure the sanitary and epidemiological welfare of the population, and environmental protection.


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.