# 001802015725
Unscheduled inspection
Start date: 2018-10-15, end date: 2018-11-12, duration: —
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: In order to implement the Inspection Program approved by the Deputy Head of the Siberian Department of Rostechnadzor DV Kolegov dated 07052018 3242018, the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer, the customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, the subject of this inspection is the compliance of the work and the applied construction materials and results during the construction of the capital construction facility "Construction of the ash dump Main ash dump Construction of section 4A of the joint venture "TETS5", as well as the results of such work to the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used availability of a construction permit compliance with the requirements of parts 2 3 3_1 of Article 52 of the Urban Planning Code Of the Russian Federation