# 66170701646336
Unscheduled inspection
Start date: 2017-05-29, end date: 2017-06-09, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The audit is conducted in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 29140264 dated February 17, 2017. The objectives of this audit are to carry out regional state construction supervision. The purpose of this audit is to comply with the previously issued instruction on the elimination of identified violations of mandatory requirements 29140264 dated February 17, 2017
# 66170701296586
Unscheduled inspection
Start date: 2017-01-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66170701336729
Unscheduled inspection
Start date: 2017-01-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66170701331259
Unscheduled inspection
Start date: 2017-01-27, end date: 2017-02-10, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291402688 dated December 12, 2016The purpose of this audit is to comply with the previously issued order to eliminate the identified violation of mandatory requirements 291402688 dated December 12, 2016The task of this audit is to carry out state construction supervision
# 66160701221065
Unscheduled inspection
Start date: 2016-12-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66160701192529
Unscheduled inspection
Start date: 2016-12-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66160701017484
Unscheduled inspection
Start date: 2016-10-17, end date: 2016-10-28, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: elimination of the revealed violation of mandatory requirements 291704x12506P2 dated August 05, 2016
# 66160701017568
Unscheduled inspection
Start date: 2016-10-17, end date: 2016-10-28, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: verification of the compliance of the work and applicable building materials during the construction of a capital construction facility
# 66160700088630
Unscheduled inspection
Start date: 2016-09-05, end date: 2016-09-16, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the inspection program 29170124416 dated July 18, 2016, the objectives of which are to carry out state construction supervision. The purpose of this inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "47-storey part of the shopping center 2 according to ROM 2 stage of construction adjustment of the launch complex 1 4th floor of the premises in axes 117LP 9111LP 11111KL 11111AD with the exception of the ventilation chamber 2 in the axes 111AB 5th floor of the room in the axes 11111LP 11111KL 1111AD with the exception of the rooms of the ventilation chamber 7 8 in the axes 12BV 12VD machine room elevators 10 in the axes 12VD 6th floor of the room in the axes 11111LP 11111KL 7th floor of the room in the axes 11111LP 11111KL" located at Yekaterinburg ul. Heroes of Russia house 2 results such works are subject to building codes and regulations fire safety requirements safety rules and state standards as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities
# 66160700598344
Unscheduled inspection
Start date: 2016-09-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66160700042285
Unscheduled inspection
Start date: 2016-08-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66160601792283
Unscheduled inspection
Start date: 2016-08-15, end date: 2016-08-26, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that the real test is aimed at the implementation of the tasks of which is the implementation of state construction supervision of the notice of the developer of the beginning of construction of the object of capital construction program of inspections 2917014716 of February 16, 2016 In the verification process to conduct the following monitoring activities necessary to achieve the purposes and objectives of conducting proverbia to consider the developer technical customer entity engaged in construction on the basis of an agreement with the developer or technical customer for verification of documents relating to the performance of work including construction construction areas of networking engineering engineering systems and equipment for the use of construction materials, products and construction supervision namely General and special the log is a record of work of the Executive documentation including acts of examination of the work of building constructions areas of engineering networks of engineering systems and equipment affect the security control over the performance of which could not be carried out after performing other work as well without disassembly or damage to building structures and parts of networks of engineering and technical engineering systems and equipment acts to eliminate violations of the drawbacks with regard to the work performed previously identified during construction, control and implementation of state construction supervision of the results of expert examinations and other laboratory tests performed works conducted in the process of construction control documents confirming the performance of the control over the quality of the applied construction materials documents provided for by regulatory legal acts of confirming compliance with the legislation of the Russian Federation in the field of environmental protection requirements of fire safety and sanitary and epidemiological welfare of the population as well as the requirements of the energy efficiency requirements of equipment capital