# 742101277887
Unscheduled inspection
Start date: 2021-11-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742101193220
Unscheduled inspection
Start date: 2021-10-14, end date: 2021-10-20, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of works on landscaping of the house territory, installation of small architectural forms, facade work, installation of pits at the entrance to the basement, installation of a porch and building materials used during construction, reconstruction of a capital construction facility, as well as the results of such work with the requirements of the design approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code documentation (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which the requirements of energy efficiency do not apply) and the requirements for equipping the capital construction facility with metering devices for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100954286
Unscheduled inspection
Start date: 2021-09-30, end date: 2021-10-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of finishing works, installation of elevator equipment, compliance with fire-fighting and sanitary-epidemiological measures, measures to ensure access for low-mobility groups of the population and construction materials used during construction, reconstruction of a capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this law The Code of Project Documentation (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of facilities capital construction, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100373715
Unscheduled inspection
Start date: 2021-07-26, end date: 2021-07-29, duration: 4
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on the installation of external water supply networks, sewerage, electricity, internal cold and hot water supply systems, wastewater disposal, input nodes and construction materials used during construction, reconstruction of a capital construction facility, as well as the results of such work with the requirements of the design approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code documentation (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which the requirements of energy efficiency do not apply) and the requirements for equipping the capital construction facility with metering devices for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100257890
Unscheduled inspection
Start date: 2021-06-08, end date: 2021-06-15, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on filling window openings of 1-10 floors before the installation of window sills and slopes and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects to which energy efficiency requirements do not apply) and requirements for the equipment of the capital construction facility with metering devices for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100107780
Unscheduled inspection
Start date: 2021-04-09, end date: 2021-04-15, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on the installation of load-bearing and enclosing structures (external and internal wall panels, floor slabs, stairwell and elevator shafts, plumbing cabins, ventilation units) of 8-10 floors, technical floor structures, parapet and building materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with with parts 15, 15.2 and 15.3 of Article 48 of this Code of the project documentation (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including the requirements of energy efficiency (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100040637
Unscheduled inspection
Start date: 2021-03-11, end date: 2021-03-17, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on the installation of load-bearing and enclosing structures (external and internal wall panels, floor slabs, stairwell and elevator shafts, plumbing cabins, ventilation units) of 4-7 floors and building materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code of project documentation (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used;
2. Availability of a building permit.
3. Compliance with the requirements of Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742005282169
Unscheduled inspection
Start date: 2020-12-24, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742005145661
Unscheduled inspection
Start date: 2020-10-06, end date: 2020-10-12, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of foundations and building materials used in the process of construction reconstruction of a capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or information models if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning the Code of the Russian Federation
# 742004490591
Unscheduled inspection
Start date: 2020-08-24, end date: 2020-09-18, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004430356
Unscheduled inspection
Start date: 2020-06-23, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742004430265
Unscheduled inspection
Start date: 2020-06-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004383262
Unscheduled inspection
Start date: 2020-04-02, end date: 2020-04-08, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of elevator equipment and construction materials used in the process of construction reconstruction of a capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation
# 742004295230
Unscheduled inspection
Start date: 2020-02-26, end date: 2020-03-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of internal cold and hot water supply systems heating drainage power supply in axes 45 and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation in accordance with in parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources2 The availability of a permit for construction3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741904033805
Unscheduled inspection
Start date: 2019-12-03, end date: 2019-12-09, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the actual condition of the object2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903941402
Unscheduled inspection
Start date: 2019-11-19, end date: 2019-11-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on filling window openings before the slopes and installation of window sills in the axes 45 and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903685267
Unscheduled inspection
Start date: 2019-10-01, end date: 2019-10-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of external water supply networks sewerage power supply and construction materials used in the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code If the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902857978
Unscheduled inspection
Start date: 2019-07-12, end date: 2019-07-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of building structures from the overlap of the 3rd floor to the overlap of the 6th floor in axes 45 and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of design documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902873924
Unscheduled inspection
Start date: 2019-07-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902822650
Unscheduled inspection
Start date: 2019-07-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902889924
Unscheduled inspection
Start date: 2019-07-26, end date: 2019-08-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of structures of the technical floor of the parapet in axes 45 and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902806622
Unscheduled inspection
Start date: 2019-06-25, end date: 2019-07-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The actual condition of the object2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800661482
Unscheduled inspection
Start date: 2018-08-29, end date: 2018-09-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction of the facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800597156
Unscheduled inspection
Start date: 2018-08-07, end date: 2018-08-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the works on landscaping in the 67AsGs axes for the installation of elevator equipment in the 67AsGs axes with compliance with fire and sanitary epidemiological measures measures to ensure access for low-mobility groups of the population and the construction materials used during the construction of the capital construction facility as well as the results of such works with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800299411
Unscheduled inspection
Start date: 2018-04-20, end date: 2018-04-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed in the installation of internal cold and hot water supply systems heating drainage power supply finishing works in the axes 67AsGs and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800073191
Unscheduled inspection
Start date: 2018-02-21, end date: 2018-02-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed in the installation of external water supply sewerage power supply networks in the 67AsGs axes and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800008705
Unscheduled inspection
Start date: 2018-01-26, end date: 2018-02-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the waterproofing of the roof in the 67AsGs axes after the actual completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802909215
Unscheduled inspection
Start date: 2017-12-07, end date: 2017-12-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of building structures from the overlap of the 8th floor to the end of the installation of the technical floor in the axes 67AsGs for the installation of similar groups compliance with fire and sanitary epidemiological measures and building materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2 The presence of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802787391
Unscheduled inspection
Start date: 2017-11-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802598776
Unscheduled inspection
Start date: 2017-10-04, end date: 2017-10-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on filling window openings before the slopes and installation of window sills in the axes 67AsGs and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701676640
Unscheduled inspection
Start date: 2017-06-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701598902
Unscheduled inspection
Start date: 2017-05-16, end date: 2017-05-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Compliance with the regulation of 18042017 G2the presence of a construction permit 3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701623098
Unscheduled inspection
Start date: 2017-05-23, end date: 2017-05-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of building structures from the overlap of the 4th floor to the overlap of the 6th floor in the axes 67AsGs and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701513832
Unscheduled inspection
Start date: 2017-04-12, end date: 2017-04-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of building structures from the overlap of the 2nd floor to the overlap of the 4th floor in the axes 67AsGs and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701450254
Unscheduled inspection
Start date: 2017-03-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160700083933
Unscheduled inspection
Start date: 2016-09-13, end date: 2016-09-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of load-bearing and enclosing structures of external and internal wall panels enclosing structures floor slabs of stair lift shafts sanitary cabins vent blocks of 13 floors before the start of installation of the 4th floor and the construction materials used during the construction of the capital construction facility as well as the results of such work to the requirements of technical regulations of the project documentation2 The presence of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700864684
Unscheduled inspection
Start date: 2016-09-30, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74160601735931
Unscheduled inspection
Start date: 2016-08-02, end date: 2016-08-04, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of supporting structures of the ground floor external and internal walls of the floor before the installation of external and internal wall panels of the first floor in axes 45 67 and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation2 The presence of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation