Found 37 inspections:

# 741802303858
Unscheduled inspection
Start date: 2018-12-20, end date: 2018-12-26, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the basement foundation blocks in axes 12AB and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code of the Russian Federation


# 741802198006
Unscheduled inspection
Start date: 2018-12-06, end date: 2019-01-10, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on compliance with fire and sanitary epidemiological measures measures to ensure access for low-mobility groups of the population after the actual completion of landscaping and landscaping of the territory with full readiness and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation 2 Verification of the completed construction of the capital construction facility 3 Availability of a construction permit 4 Meeting the requirements of hr 2 3 31 st52 of the Urban Planning Code of the Russian Federation


# 741802303548
Unscheduled inspection
Start date: 2018-12-19, end date: 2018-12-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of internal and external engineering communications with full readiness and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code of the Russian Federation


# 741802130686
Unscheduled inspection
Start date: 2018-11-26, end date: 2018-11-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the foundation plate in axes 12AB and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code of the Russian Federation


# 741802153224
Unscheduled inspection
Start date: 2018-11-28, end date: 2018-12-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation and waterproofing of the roof in the 59AB axes with the installation of loggia glazing when fully ready and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741802162570
Unscheduled inspection
Start date: 2018-11-29, end date: —, duration:
Authority:
Purpose of inspection:


# 741802085641
Unscheduled inspection
Start date: 2018-11-14, end date: 2018-11-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of load-bearing and enclosing structures of the 510th floor in axes 4Ac with the installation of load-bearing and enclosing structures of the technical floor and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741801775353
Unscheduled inspection
Start date: 2018-10-03, end date: —, duration:
Authority:
Purpose of inspection:


# 741801891853
Unscheduled inspection
Start date: 2018-10-08, end date: 2018-10-12, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of translucent structures with full readiness and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 ct52 of the Urban Planning Code of the Russian Federation


# 741800661645
Unscheduled inspection
Start date: 2018-08-28, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741800575458
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-10, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of load-bearing supporting structures of the 8th floor in axes 15AB and the construction materials used during the construction of capital construction, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800536140
Unscheduled inspection
Start date: 2018-07-16, end date: 2018-07-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of load-bearing supporting structures of the 4th floor in axes 15AB and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800515344
Unscheduled inspection
Start date: 2018-07-05, end date: 2018-07-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of pile work before the start of work on the foundations in the 4Ac axes and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741800495353
Unscheduled inspection
Start date: 2018-06-29, end date: 2018-07-05, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of load-bearing supporting structures of the 1st floor in axes 15AB and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of h 23 and 31 Art 52 of the Urban Planning Code of the Russian Federation


# 741800381766
Unscheduled inspection
Start date: 2018-05-21, end date: 2018-05-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the foundation in axes 15AB and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code of the Russian Federation


# 741800236069
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the excavation work with the existing foundation plate in axes 15AB and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 Urban Planning Code of the Russian Federation


# 74170802786624
Unscheduled inspection
Start date: 2017-11-01, end date: 2017-11-07, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The performance of work on the installation and waterproofing of the roof in full readiness, the installation of elevators in full readiness, the installation of engineering communications in full readiness, and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802786619
Unscheduled inspection
Start date: 2017-11-01, end date: 2017-11-07, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The performance of work on the installation and waterproofing of the roof in full readiness, the installation of elevators in full readiness, the installation of engineering communications in full readiness, and the construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802001832
Unscheduled inspection
Start date: 2017-09-06, end date: 2017-09-12, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of works on the installation of engineering communications with full readiness and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations for project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170802001830
Unscheduled inspection
Start date: 2017-09-06, end date: 2017-09-12, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of window blocks prior to the installation of slopes and window sills and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 74170701788117
Unscheduled inspection
Start date: 2017-07-17, end date: 2017-07-21, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation and waterproofing of the roof in axes 15 with full readiness and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701712986
Unscheduled inspection
Start date: 2017-06-19, end date: 2017-06-23, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the construction of the 8th floor in axes 15 with full readiness and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701623316
Unscheduled inspection
Start date: 2017-05-19, end date: 2017-05-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the construction of the 5th floor in axes 15 with full readiness and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701529720
Unscheduled inspection
Start date: 2017-04-14, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701529609
Unscheduled inspection
Start date: 2017-04-13, end date: 2017-04-19, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of engineering communications with full readiness and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit3 Compliance with the requirements of hr 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701441782
Unscheduled inspection
Start date: 2017-03-13, end date: 2017-03-17, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of translucent structures prior to the installation of slopes, the installation of roof waterproofing when fully ready and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701437392
Unscheduled inspection
Start date: 2017-03-10, end date: 2017-03-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the construction of the second floor in axes 15 with full readiness for the installation of roof waterproofing with full readiness and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701377755
Unscheduled inspection
Start date: 2017-02-15, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701377967
Unscheduled inspection
Start date: 2017-02-15, end date: 2017-02-21, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of load-bearing structures on the 8th floor before the installation of load-bearing structures on the 9th floor and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701320438
Unscheduled inspection
Start date: 2017-01-25, end date: 2017-01-31, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of load-bearing structures on the 6th floor before the installation of load-bearing structures on the 7th floor and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701311923
Unscheduled inspection
Start date: 2017-01-23, end date: 2017-01-27, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the arrangement of the basement in axes 15 with full readiness and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701219566
Unscheduled inspection
Start date: 2016-12-12, end date: 2016-12-16, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of load-bearing structures on the 9th floor prior to the installation of load-bearing structures on the 10th floor and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701205166
Unscheduled inspection
Start date: 2016-12-07, end date: 2016-12-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2 Availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701110588
Unscheduled inspection
Start date: 2016-11-17, end date: 2016-11-22, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the actual condition of the object2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701047496
Unscheduled inspection
Start date: 2016-10-27, end date: 2016-10-31, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of load-bearing structures on the 6th floor before the installation of load-bearing structures on the 7th floor and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160601752152
Unscheduled inspection
Start date: 2016-08-02, end date: —, duration:
Authority:
Purpose of inspection:


# 74160700042957
Unscheduled inspection
Start date: 2016-08-22, end date: 2016-08-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The actual condition of the object2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation