Found 8 inspections:

# 001800750501
Unscheduled inspection
Start date: 2018-08-31, end date: 2018-09-27, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of mandatory requirements established by federal laws and other regulatory acts of the Russian Federation in the field of industrial safety and technical regulation of mandatory requirements, to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have violated the requirements of federal laws and other regulatory legal acts. The subject of this audit is compliance by a legal entity in the course of its activities with mandatory industrial safety requirements in the design construction operation conservation and liquidation of hazardous production facilities manufacture installation commissioning maintenance and repair of technical devices for lifting cranes used at hazardous production facilities compliance with the specified requirements of the buildings structures equipment and materials used


# 702100958218
Unscheduled inspection
Start date: 2021-10-01, end date: —, duration:
Authority:
Purpose of inspection:


# 702100011964
Unscheduled inspection
Start date: 2021-02-16, end date: 2021-03-02, duration: 10
Authority: Glavnaya inspekciya gosudarstvennogo stroitelnogo nadzora Tomskoi oblasti
Purpose of inspection: purpose: to prevent, as well as identify and suppress violations of urban planning legislation during an unscheduled on-site inspection based on the inspection program No. 1/16-18-PP4 dated 09/08/2020, the expiration of the deadline for the execution of Regulation No. 1/16-18-PR5 dated 07/09/2020. task:prevention, as well as detection and suppression of violations of urban planning legislation. The subject of this review is : ▪compliance with mandatory requirements and or requirements established by municipal legal acts: compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code. The Code of Project Documentation (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of facilities capital construction, which are not covered by energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for used energy resources; ,availability of a building permit; fulfillment of the requirements of Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation;▪compliance with the regulations of state control (supervision) bodies and municipal control bodies;


# 702004419667
Unscheduled inspection
Start date: 2020-06-11, end date: 2020-07-09, duration:
Authority: Glavnaya inspekciya gosudarstvennogo stroitelnogo nadzora Tomskoi oblasti
Purpose of inspection: Objectives of prevention and detection and suppression of violations of urban planning legislation when conducting an unscheduled on-site documentary inspection based on the expiration of the deadline for the elimination of violations 1618PR4 dated 22102019, failure to comply with which poses a threat to harm to life and health of citizens Tasks prevention and detection and suppression of violations of urban planning legislationsubject the implementation of regulations of state control bodies supervision bodies municipal control regulation 1618PR4 dated 22102019


# 701903555905
Unscheduled inspection
Start date: 2019-09-25, end date: 2019-10-22, duration:
Authority: Glavnaya inspekciya gosudarstvennogo stroitelnogo nadzora Tomskoi oblasti
Purpose of inspection: purpose prevention as well as detection and suppression of violations of urban planning legislation during an unscheduled on-site documentary inspection based on the inspection program 1618PP3 of 17072019 verification of compliance with the regulations on the elimination of violations 1618PR3 of 16052019the task is prevention as well as detection and suppression of violations of urban planning legislation subject to compliance with mandatory requirements and or requirements established by municipal legal acts of conformity of work and applied building materials during construction reconstruction the capital construction facility as well as the results of such work meet the requirements of the project documentation for the availability of a construction permit, compliance with the requirements of parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, compliance with the requirements of state control bodies, supervision of municipal control bodies, regulation 1618PR3 of 16052019


# 701902600111
Unscheduled inspection
Start date: 2019-04-12, end date: 2019-05-16, duration:
Authority: Glavnaya inspekciya gosudarstvennogo stroitelnogo nadzora Tomskoi oblasti
Purpose of inspection: purpose prevention as well as detection and suppression of violations of urban planning legislation during an unscheduled on-site inspection based on the inspection program 1618PP2 dated 27072018 verification of compliance with the regulations on the elimination of violations 1618PR1 dated 12102018 1618PR2 dated 27022019 subject compliance with mandatory requirements and or requirements established by municipal legal acts compliance with the performance of works and applied building materials during the construction reconstruction of a capital construction facility as well as the results of such work, the requirements of the project documentation for the availability of a construction permit, compliance with the requirements of parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, compliance with the instructions of state control bodies, supervision of municipal control bodies, regulation 1618PR1 of 12102018 regulation 1618PR2 of 27022019


# 701902450817
Unscheduled inspection
Start date: 2019-01-31, end date: —, duration:
Authority:
Purpose of inspection:


# 001800750501
Unscheduled inspection
Start date: 2018-08-31, end date: 2018-09-27, duration:
Authority: Sibirskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of mandatory requirements established by federal laws and other regulatory acts of the Russian Federation in the field of industrial safety and technical regulation of mandatory requirements, to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have violated the requirements of federal laws and other regulatory legal acts. The subject of this audit is compliance by a legal entity in the course of its activities with mandatory industrial safety requirements in the design construction operation conservation and liquidation of hazardous production facilities manufacture installation commissioning maintenance and repair of technical devices for lifting cranes used at hazardous production facilities compliance with the specified requirements of the buildings structures equipment and materials used


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.