# 001904100502
Unscheduled inspection
Start date: 2019-12-16, end date: 2019-12-20, duration: —
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Primorskomu krayu i Sahalinskoi oblasti
Purpose of inspection: To establish that this audit is conducted in order to monitor the implementation of the order to eliminate the identified violation dated 24072019 3, the deadline for which has expired. The purpose of this audit is to verify compliance with the requirements for the protection and use of agricultural land, including reclaimed land. The purpose of this audit is to verify the implementation of the order to eliminate the identified violation dated 24072019 3
# 652101546169
Unscheduled inspection
Start date: 2021-12-13, end date: 2021-12-24, duration: 10
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of the completed construction stage, verification of the completed construction stage, verification of the completed construction stage
# 652101546150
Unscheduled inspection
Start date: 2021-12-13, end date: 2021-12-24, duration: 10
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of the completed construction stage, verification of the completed construction stage, verification of the completed construction stage
# 652101546088
Unscheduled inspection
Start date: 2021-12-13, end date: 2021-12-24, duration: 10
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: inspection of the completed construction stage, Visual inspection of the capital construction facility from 12/13/2021 Verification of the executive documentation from 12/13/2021 to 12/24/2021, verification of the completed construction stage
# 652101447745
Unscheduled inspection
Start date: 2021-12-13, end date: —, duration: 10
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of the completed construction stage
# 652101447735
Unscheduled inspection
Start date: 2021-12-13, end date: —, duration: 10
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of the completed construction stage
# 652101447778
Unscheduled inspection
Start date: 2021-12-13, end date: —, duration: 10
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of the completed construction stage
# 652101312626
Unscheduled inspection
Start date: 2021-11-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 652101418030
Unscheduled inspection
Start date: 2021-11-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 652101418004
Unscheduled inspection
Start date: 2021-11-25, end date: —, duration: 1
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of the execution of regulation No. 19-20 dated 02/21/2020
# 652105318219
Unscheduled inspection
Start date: 2021-01-20, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection:
# 652105318288
Unscheduled inspection
Start date: 2021-01-20, end date: 2021-02-09, duration: 15
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: - verification of the compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used;
-checking for a building permit;
- verification of the membership of the person carrying out construction in the SRO, as well as the availability of specialists included in the national register of specialists in the field of construction
# 652105318243
Unscheduled inspection
Start date: 2021-01-20, end date: 2021-02-09, duration: 15
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used;
-checking for a building permit;
- verification of the membership of the person carrying out construction in the SRO, as well as the availability of specialists included in the national register of specialists in the field of construction
# 652105317864
Unscheduled inspection
Start date: 2021-01-20, end date: 2021-02-09, duration: 15
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used;
-checking for a building permit;
- verification of the membership of the person carrying out construction in the SRO, as well as the availability of specialists included in the national register of specialists in the field of construction
# 652004420673
Unscheduled inspection
Start date: 2020-06-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 652004353998
Unscheduled inspection
Start date: 2020-03-16, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya truda v Sahalinskoi oblasti
Purpose of inspection:
# 652004262279
Unscheduled inspection
Start date: 2020-02-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 652004262276
Unscheduled inspection
Start date: 2020-02-10, end date: 2020-02-21, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work of the project documentation in PM with the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, verification of the availability of a construction permit, verification of the membership of the person carrying out the construction in the SRO, as well as the availability of specialists included in the national register of specialists in the field of construction
# 652004262264
Unscheduled inspection
Start date: 2020-02-10, end date: 2020-02-21, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work of the project documentation in PM with the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, verification of the availability of a construction permit, verification of the membership of the person carrying out the construction in the SRO, as well as the availability of specialists included in the national register of specialists in the field of construction
# 652004262257
Unscheduled inspection
Start date: 2020-02-10, end date: 2020-02-21, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work of the project documentation in PM with the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, verification of the availability of a construction permit, verification of the membership of the person carrying out the construction in the SRO, as well as the availability of specialists included in the national register of specialists in the field of construction
# 652004262243
Unscheduled inspection
Start date: 2020-02-10, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection:
# 001904100502
Unscheduled inspection
Start date: 2019-12-16, end date: 2019-12-20, duration: —
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Primorskomu krayu i Sahalinskoi oblasti
Purpose of inspection: To establish that this audit is conducted in order to monitor the implementation of the order to eliminate the identified violation dated 24072019 3, the deadline for which has expired. The purpose of this audit is to verify compliance with the requirements for the protection and use of agricultural land, including reclaimed land. The purpose of this audit is to verify the implementation of the order to eliminate the identified violation dated 24072019 3
# 651903810485
Unscheduled inspection
Start date: 2019-10-16, end date: 2019-10-25, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work of the project documentation in PM with the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, verification of the availability of a construction permit, verification of the membership of the person carrying out the construction in the SRO, as well as the availability of specialists included in the national register of specialists in the field of construction
# 651903810428
Unscheduled inspection
Start date: 2019-10-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 651903810448
Unscheduled inspection
Start date: 2019-10-16, end date: 2019-10-25, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work of the project documentation in PM with the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, verification of the availability of a construction permit, verification of the membership of the person carrying out the construction in the SRO, as well as the availability of specialists included in the national register of specialists in the field of construction
# 651903810399
Unscheduled inspection
Start date: 2019-10-16, end date: 2019-10-25, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work of the project documentation in PM with the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, verification of the availability of a construction permit, verification of the membership of the person carrying out the construction in the SRO, as well as the availability of specialists included in the national register of specialists in the field of construction
# 651903810376
Unscheduled inspection
Start date: 2019-10-16, end date: 2019-10-25, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work of the project documentation in PM with the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, verification of the availability of a construction permit, verification of the membership of the person carrying out the construction in the SRO, as well as the availability of specialists included in the national register of specialists in the field of construction
# 651902873588
Unscheduled inspection
Start date: 2019-07-11, end date: 2019-07-11, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: Verification of the execution of the prescription
# 001902873408
Unscheduled inspection
Start date: 2019-07-18, end date: 2019-07-24, duration: —
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Primorskomu krayu i Sahalinskoi oblasti
Purpose of inspection: To establish that this audit is conducted in order to verify the facts set out in the submission dated 03072019 084519. The purpose of this audit is to verify compliance with the requirements of the land legislation of the Russian Federation. The subject of the audit is compliance by a legal entity in the course of its activities with mandatory requirements in the field of land legislation of the Russian Federation and measures to prevent harm to the environment
# 651902806416
Unscheduled inspection
Start date: 2019-07-24, end date: —, duration: —
Authority: Agentstvo veterinarii i plemennogo zhivotnovodstva Sahalinskoi oblasti
Purpose of inspection:
# 651902780838
Unscheduled inspection
Start date: 2019-07-24, end date: 2019-07-30, duration: —
Authority: Agentstvo veterinarii i plemennogo zhivotnovodstva Sahalinskoi oblasti
Purpose of inspection: In order to monitor the implementation of the regulations of the Agency for Veterinary Medicine and Livestock Breeding of the Sakhalin Region dated 22032019 37p2019, the purpose of this audit is to monitor compliance with the mandatory requirements of the legislation of the Russian Federation in the field of veterinary medicine. The purpose of the audit is to comply with the regulations of state control bodies, supervision bodies, municipal control bodies
# 651902560207
Unscheduled inspection
Start date: 2019-03-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 651902560200
Unscheduled inspection
Start date: 2019-03-11, end date: 2019-03-22, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work of the project documentation in PM with the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, verification of the availability of a construction permit, verification of the membership of the person carrying out the construction in the SRO, as well as the availability of specialists included in the national register of specialists in areas of construction execution of the inspection program
# 651902560013
Unscheduled inspection
Start date: 2019-03-11, end date: 2019-03-22, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work of the project documentation in PM with the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, verification of the availability of a construction permit, verification of the membership of the person carrying out the construction in the SRO, as well as the availability of specialists included in the national register of specialists in areas of construction execution of the inspection program
# 651902560009
Unscheduled inspection
Start date: 2019-03-11, end date: 2019-03-22, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work of the project documentation in PM with the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, verification of the availability of a construction permit, verification of the membership of the person carrying out the construction in the SRO, as well as the availability of specialists included in the national register of specialists in areas of construction execution of the inspection program
# 651902560006
Unscheduled inspection
Start date: 2019-03-11, end date: 2019-03-22, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of the compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work of the project documentation in PM with the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, verification of the availability of a construction permit, verification of the membership of the person carrying out the construction in the SRO, as well as the availability of specialists included in the national register of specialists in areas of construction execution of the inspection program
# 651902580184
Unscheduled inspection
Start date: 2019-03-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 651802177944
Unscheduled inspection
Start date: 2018-11-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 651802177858
Unscheduled inspection
Start date: 2018-11-19, end date: 2018-11-26, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation in PM, energy efficiency requirements and equipment requirements for the capital construction facility with metering devices for energy resources used, verification of the construction permit, verification of the membership of the person carrying out the construction in the SRO, as well as the availability of specialists included in the national register of specialists in the field of construction
# 651802129118
Unscheduled inspection
Start date: 2018-11-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 651802098632
Unscheduled inspection
Start date: 2018-11-19, end date: 2018-11-26, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation in PM, energy efficiency requirements and equipment requirements for the capital construction facility with metering devices for energy resources used, verification of the construction permit, verification of the membership of the person carrying out the construction in the SRO, as well as the availability of specialists included in the national register of specialists in the field of construction, the implementation of the inspection program
# 651802098625
Unscheduled inspection
Start date: 2018-11-19, end date: 2018-11-26, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation in PM, energy efficiency requirements and equipment requirements for the capital construction facility with metering devices for energy resources used, verification of the construction permit, verification of the membership of the person carrying out the construction in the SRO, as well as the availability of specialists included in the national register of specialists in the field of construction
# 651802098623
Unscheduled inspection
Start date: 2018-11-19, end date: 2018-11-29, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: inspections of an object completed by construction
# 651801964644
Unscheduled inspection
Start date: 2018-10-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 651800424826
Unscheduled inspection
Start date: 2018-06-04, end date: 2018-06-09, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: execution of the inspection program verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation in pm energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used checking the availability of a construction permit checking the membership of the person carrying out construction in the SRO as well as the availability of specialists included in the national register of specialists in the field of construction
# 651800424824
Unscheduled inspection
Start date: 2018-06-04, end date: 2018-06-09, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: execution of the inspection program verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation in pm energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used checking the availability of a construction permit checking the membership of the person carrying out construction in the SRO as well as the availability of specialists included in the national register of specialists in the field of construction
# 651800424822
Unscheduled inspection
Start date: 2018-06-04, end date: 2018-06-09, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: execution of the inspection program verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation in pm energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used checking the availability of a construction permit checking the membership of the person carrying out construction in the SRO as well as the availability of specialists included in the national register of specialists in the field of construction
# 651800211128
Unscheduled inspection
Start date: 2018-03-21, end date: 2018-03-26, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: the implementation of the inspection program verification of the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation in PM, the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the availability of a construction permit, verification of the membership of the person carrying out the construction in the SRO, as well as the availability of specialists included to the national register of specialists in the field of construction
# 651800053295
Unscheduled inspection
Start date: 2018-02-08, end date: 2018-02-16, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: execution of the inspection program verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, in particular, energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of a construction permit, verification of the membership of the person carrying out the construction in the SRO, as well as the availability of specialists included in the national register of specialists in the field of construction
# 651800053283
Unscheduled inspection
Start date: 2018-02-08, end date: 2018-02-16, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: execution of the inspection program verification of compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations, project documentation, in particular, energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of a construction permit, verification of the membership of the person carrying out the construction in the SRO, as well as the availability of specialists included in the national register of specialists in the field of construction
# 65170803008370
Unscheduled inspection
Start date: 2017-12-07, end date: 2017-12-15, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: according to the inspection program
# 65170803002594
Unscheduled inspection
Start date: 2017-12-07, end date: 2017-12-15, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: according to the inspection program
# 65170803002616
Unscheduled inspection
Start date: 2017-12-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 65170803018141
Unscheduled inspection
Start date: 2017-12-11, end date: 2017-12-15, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of the completed construction stage
# 65170802604520
Unscheduled inspection
Start date: 2017-09-14, end date: 2017-09-20, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: compliance with the requirements of project documentation and technical regulations
# 65170802266571
Unscheduled inspection
Start date: 2017-09-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 65170701723150
Unscheduled inspection
Start date: 2017-06-20, end date: 2017-06-28, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: according to the inspection program
# 65170701500637
Unscheduled inspection
Start date: 2017-04-03, end date: 2017-04-10, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: according to the inspection program
# 65170701358703
Unscheduled inspection
Start date: 2017-02-06, end date: 2017-02-15, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: execution of the verification program
# 65160701154038
Unscheduled inspection
Start date: 2016-11-24, end date: 2016-11-30, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: execution of the inspection program
# 65160700047656
Unscheduled inspection
Start date: 2016-08-26, end date: 2016-08-31, duration: —
Authority: Gosudarstvennaya inspekciya stroitelnogo nadzora Sahalinskoi oblasti
Purpose of inspection: verification of compliance of completed works with the requirements of project documentation and technical regulations