Found 13 inspections:

# 892100529044
Unscheduled inspection
Start date: 2021-08-16, end date: —, duration:
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora YAmalo-Neneckogo avtonomnogo okruga
Purpose of inspection: this audit is carried out in order to monitor the implementation of LLC "RGS GROUP" of the Service's instruction on the elimination of violations dated July 12, 2021 No. 6-D


# 892100296446
Unscheduled inspection
Start date: 2021-06-15, end date: —, duration: 20
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora YAmalo-Neneckogo avtonomnogo okruga
Purpose of inspection: The audit is carried out in order to monitor compliance with LLC RGS GROUP, which attracts funds from participants in shared-equity construction for the construction of apartment buildings, mandatory requirements of legislation on participation in shared-equity construction of apartment buildings and (or) other real estate objects, based on a reasoned presentation on the results of a control event, during which interaction of the service is not required State Construction supervision of the Yamalo-Nenets Autonomous Okrug with developers in the implementation of state control (supervision) in the field of shared-equity construction of apartment buildings and (or) other real estate objects, dated May 07, 2021. Prevention, detection and suppression of violations of the legislation on participation in shared-equity construction of apartment buildings and (or) other real estate objects. Compliance with mandatory requirements and (or) requirements established by municipal legal acts.


# 722005289765
Unscheduled inspection
Start date: 2020-12-23, end date: 2020-12-30, duration: 6
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora YAmaloNeneckogo avtonomnogo okruga
Purpose of inspection: verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements of equipping the capital construction facility with metering devices for energy resources used checking the availability of a construction permit checking compliance with the requirements established by Parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, the basis is a notice from RGS PARTNER 2 LLC on the completion of construction of a capital construction facility dated 21122020 g 2240 hereinafter the notice


# 722005286803
Unscheduled inspection
Start date: 2020-12-23, end date: 2021-01-27, duration: 20
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora YAmaloNeneckogo avtonomnogo okruga
Purpose of inspection: the purpose of checking the compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements of equipping the capital construction facility with metering devices for energy resources used checking the availability of a construction permit checking the implementation requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation The task is to prevent the identification and suppression of violations of legislation on urban planning activities project documentation as well as other mandatory requirements of the KNM subject compliance with mandatory requirements and or requirements established by municipal legal acts


# 722005274629
Unscheduled inspection
Start date: 2020-12-11, end date: 2020-12-30, duration: 14
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora YAmaloNeneckogo avtonomnogo okruga
Purpose of inspection: verification of compliance of work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements of equipment of the capital construction facility with metering devices for energy resources used checking the availability of a construction permit checking compliance with requirements established by Parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, the basis is a notice from RGS PARTNER 1 LLC on the completion of construction of a capital construction facility dated 09122020 g 2120 hereinafter referred to as the notice


# 722005265627
Unscheduled inspection
Start date: 2020-11-26, end date: —, duration:
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora YAmaloNeneckogo avtonomnogo okruga
Purpose of inspection:


# 722005265496
Unscheduled inspection
Start date: 2020-11-26, end date: —, duration:
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora YAmaloNeneckogo avtonomnogo okruga
Purpose of inspection:


# 722004465298
Unscheduled inspection
Start date: 2020-07-22, end date: 2020-08-14, duration:
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora YAmaloNeneckogo avtonomnogo okruga
Purpose of inspection: verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements of equipping the capital construction facility with metering devices for energy resources used checking the availability of a construction permit checking compliance with requirements established by Parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, the basis is a notice from RGS GROUP LLC on the completion of construction of the reconstruction of the capital construction facility from 15072020 g 149 hereinafter the notice


# 722004465290
Unscheduled inspection
Start date: 2020-07-22, end date: 2020-08-14, duration:
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora YAmaloNeneckogo avtonomnogo okruga
Purpose of inspection: verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements of equipping the capital construction facility with metering devices for energy resources used checking the availability of a construction permit checking compliance with requirements established by Parts 2, 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, the basis is a notice from RGS GROUP LLC on the completion of construction of the reconstruction of the capital construction facility from 15072020 g 149 hereinafter the notice


# 722004279682
Unscheduled inspection
Start date: 2020-02-04, end date: 2020-02-28, duration:
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora YAmaloNeneckogo avtonomnogo okruga
Purpose of inspection: verification of the elimination by a legal entity individual entrepreneur of violations of the mandatory requirements specified in the order of the service dated December 23, 2019 81p prevention detection and suppression of violations of legislation on urban development activities project documentation as well as other mandatory requirements


# 722004279367
Unscheduled inspection
Start date: 2020-02-13, end date: 2020-03-13, duration:
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora YAmaloNeneckogo avtonomnogo okruga
Purpose of inspection: verification of the elimination by a legal entity individual entrepreneur of violations of the mandatory requirements specified in the order of the service dated 06122019 74p prevention detection and suppression of violations of legislation on urban development activities project documentation as well as other mandatory requirements


# 721902617409
Unscheduled inspection
Start date: 2019-04-01, end date: 2019-04-26, duration:
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora YAmaloNeneckogo avtonomnogo okruga
Purpose of inspection: prevention detection and suppression of violations of the legislation on participation in shared-equity construction of apartment buildings and or other real estate objects


# 89170802696326
Unscheduled inspection
Start date: 2017-10-02, end date: 2017-10-27, duration:
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora YAmaloNeneckogo avtonomnogo okruga
Purpose of inspection: verification of compliance by the developer with the provisions of 214 FZ


Information about inspections