Found 18 inspections:

# 742101414830
Unscheduled inspection
Start date: 2021-12-09, end date: —, duration:
Authority:
Purpose of inspection:


# 742101436089
Unscheduled inspection
Start date: 2021-12-16, end date: 2021-12-22, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of internal power supply networks, heat supply, roofing, installation of stained glass systems and building materials used during the construction, reconstruction of a capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities for which energy efficiency requirements are not they are distributed) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.


# 742101193155
Unscheduled inspection
Start date: 2021-10-14, end date: —, duration:
Authority:
Purpose of inspection:


# 742100454976
Unscheduled inspection
Start date: 2021-08-26, end date: 2021-09-01, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of railway floors, stairs to a height of +10,800, masonry walls up to a height of +10,800, filling of window and door openings, monolithic bypass gallery and building materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with the parts 15, 15.2 and 15.3 of Article 48 of this Code of the project documentation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100227534
Unscheduled inspection
Start date: 2021-05-25, end date: 2021-05-31, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the organization of the construction site, the foundation (in the course of work) and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the design documentation documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100092705
Unscheduled inspection
Start date: 2021-03-30, end date: 2021-04-05, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of reinforced concrete walls, columns, slabs up to +10,800, monolithic reinforced concrete stairs up to +7,200, masonry walls up to +0.000, +3,600 and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code of the project documentation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), This includes energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742005243943
Unscheduled inspection
Start date: 2020-12-01, end date: 2020-12-07, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the Installation of reinforced concrete walls, columns, slabs at otm +3600 +7200 monolithic reinforced concrete stairs up to otm +3600 and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices used energy resources 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742005145664
Unscheduled inspection
Start date: 2020-10-01, end date: 2020-10-07, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the performance of work on the installation of reinforced concrete walls columns plates on otm 0130 +2620 +4670 reinforced concrete slabs for otm +3930 +2230 monolithic reinforced concrete stairs up to otm +3260 and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, according to the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Code and project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply. and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 742004295132
Unscheduled inspection
Start date: 2020-03-03, end date: —, duration:
Authority:
Purpose of inspection:


# 741904033795
Unscheduled inspection
Start date: 2019-12-05, end date: 2019-12-11, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of an internal system of cold and hot water supply sewerage air conditioning fire alarm low current systems and building materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account changes made to the project documentation in accordance with in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources2 The availability of a permit on construction3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741904083851
Unscheduled inspection
Start date: 2019-12-19, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741903981664
Unscheduled inspection
Start date: 2019-11-27, end date: —, duration:
Authority:
Purpose of inspection:


# 741903857800
Unscheduled inspection
Start date: 2019-10-18, end date: 2019-10-24, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the landscaping works, the installation of internal heating systems and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used2 The availability of a construction permit3 Meeting the requirements of HR 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741903082529
Unscheduled inspection
Start date: 2019-09-10, end date: —, duration:
Authority:
Purpose of inspection:


# 741902954804
Unscheduled inspection
Start date: 2019-08-23, end date: 2019-08-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the construction of monolithic reinforced concrete structures below hm +0000 and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902889993
Unscheduled inspection
Start date: 2019-07-30, end date: 2019-08-05, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the repair of the heating system, the installation of brickwork partitions and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902867413
Unscheduled inspection
Start date: 2019-07-17, end date: 2019-07-23, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on dismantling partitions walls and building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902806675
Unscheduled inspection
Start date: 2019-06-26, end date: 2019-07-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of excavation work, compliance with fire and sanitary epidemiological measures and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.