# 001903822365
Unscheduled inspection
Start date: 2019-10-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 00180803044364
Unscheduled inspection
Start date: 2018-01-11, end date: —, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001800008541
Unscheduled inspection
Start date: 2018-01-19, end date: 2018-01-19, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: kontrolyu tehnicheskogo sostoyaniya i bezopasnoi ekspluatacii sistemy teplopotrebleniya zhilogo doma
# 00170802823054
Unscheduled inspection
Start date: 2017-11-10, end date: 2017-11-13, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: issuance of a permit for the commissioning of power plants
# 742101418280
Unscheduled inspection
Start date: 2021-12-10, end date: 2022-01-14, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742101170746
Unscheduled inspection
Start date: 2021-10-18, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742005272934
Unscheduled inspection
Start date: 2020-12-22, end date: 2020-12-28, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po montazhu ITP nasosnaya zavershennyi etap montazhu liftov zavershennyi etap rabot montazhu teh etazha krovli zavershennyi etap rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 742004472018
Unscheduled inspection
Start date: 2020-07-31, end date: 2020-08-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu svetoprozrachnyh konstrukcii v processe proizvodstva rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741904021035
Unscheduled inspection
Start date: 2019-11-27, end date: 2019-12-04, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu proverki vypolneniya OOO SK «FeniksGran» punktov ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii ot 18102019 Sv4845r
# 001903822365
Unscheduled inspection
Start date: 2019-10-14, end date: 2019-10-18, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu proverki vypolneniya OOO SK «FeniksGran» punktov ranee vydannyh predpisanii ob ustranenii vyyavlennyh narushenii ot 28062019 Sv2432r ot 28062019 Sv2433r
# 741902897931
Unscheduled inspection
Start date: 2019-07-30, end date: 2019-08-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Fakticheskoe sostoyanie obekta2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF
# 741902897160
Unscheduled inspection
Start date: 2019-07-31, end date: 2019-08-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the regulation dated 27062019 g2 Compliance of the installation of 910 floors the completed stage and the construction materials used in the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation3 Availability of a construction permit 4 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902806516
Unscheduled inspection
Start date: 2019-06-21, end date: 2019-06-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po montazhu 68 etazhei zavershennyi etap i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 2 3 i 31 st52 Gradostroitelnogo kodeksa RF
# 741902772979
Unscheduled inspection
Start date: 2019-06-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902751841
Unscheduled inspection
Start date: 2019-06-04, end date: 2019-06-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Proverka predpisaniya ot 26042019 g2 Sootvetstvie vypolneniya rabot po montazhu 35 etazhei zavershennyi etap i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii3 Nalichie razresheniya na stroitelstvo4 Vypolnenie trebovanii chch 2 3 i 31 st52 Gradostroitelnogo kodeksa RF
# 741902627200
Unscheduled inspection
Start date: 2019-04-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902649451
Unscheduled inspection
Start date: 2019-04-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902535493
Unscheduled inspection
Start date: 2019-02-27, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741802328897
Unscheduled inspection
Start date: 2018-12-25, end date: 2019-01-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction of the facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802210651
Unscheduled inspection
Start date: 2018-12-07, end date: 2018-12-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the completed work on the installation of reinforced concrete from the 2nd to the 9th floors upon completion of work on the 10th floor during the production of works and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802151678
Unscheduled inspection
Start date: 2018-11-28, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741802054947
Unscheduled inspection
Start date: 2018-11-08, end date: 2018-11-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolnennyh rabot po montazhu ZHBI cokolnogo i pervogo etazha i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741800634424
Unscheduled inspection
Start date: 2018-09-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800575461
Unscheduled inspection
Start date: 2018-07-31, end date: 2018-08-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the completed works on the installation of the pile field and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 00180803044364
Unscheduled inspection
Start date: 2018-01-11, end date: 2018-01-12, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: issuance of a permit for the commissioning of power plants
# 001800008541
Unscheduled inspection
Start date: 2018-01-19, end date: 2018-01-19, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: kontrolyu tehnicheskogo sostoyaniya i bezopasnoi ekspluatacii sistemy teplopotrebleniya zhilogo doma
# 74170802928113
Unscheduled inspection
Start date: 2017-12-06, end date: 2017-12-12, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po montazhu konstrukcii 610 etazhei montazhu okon s 1 po 5 etazh posle zaversheniya rabot montazhu sistem otopleniya vodosnabzheniya kanalizacii v processe proizvodstva rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 74170802985994
Unscheduled inspection
Start date: 2017-12-18, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170802831388
Unscheduled inspection
Start date: 2017-11-16, end date: 2017-11-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po montazhu konstrukcii 15 etazhei posle zaversheniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 00170802823054
Unscheduled inspection
Start date: 2017-11-10, end date: 2017-11-13, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: issuance of a permit for the commissioning of power plants
# 74170802484465
Unscheduled inspection
Start date: 2017-09-20, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170802484464
Unscheduled inspection
Start date: 2017-09-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701820484
Unscheduled inspection
Start date: 2017-07-31, end date: 2017-08-04, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po montazhu sistem elektrosnabzheniya vodosnabzheniya vodootvedeniya v processe proizvodstva rabot montazh okon liftov v processe proizvodstva rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF
# 74170701707152
Unscheduled inspection
Start date: 2017-06-16, end date: 2017-06-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of work on the installation of structures of 10 technical floors and roofs and the construction materials used in the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701563591
Unscheduled inspection
Start date: 2017-04-28, end date: 2017-05-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of structures of 79 floors and the building materials used in the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701472314
Unscheduled inspection
Start date: 2017-03-24, end date: 2017-03-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of work on the installation of structures of 46 floors and the construction materials used in the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701322417
Unscheduled inspection
Start date: 2017-01-31, end date: 2017-02-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po montazhu konstrukcii 13 etazhei i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF
# 74160701131602
Unscheduled inspection
Start date: 2016-11-25, end date: 2016-12-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po montazhu konstrukcii tehpodpolya i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF
# 74160701042996
Unscheduled inspection
Start date: 2016-10-26, end date: 2016-11-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed construction object2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701011132
Unscheduled inspection
Start date: 2016-10-20, end date: 2016-10-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po obespecheniyu protivopozharnyh i sanitarnoepidemiologicheskih trebovanii i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF
# 74160700089325
Unscheduled inspection
Start date: 2016-09-07, end date: 2016-09-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po ustroistvu svainogo polya rostverkov i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF
# 74160601706105
Unscheduled inspection
Start date: 2016-07-15, end date: —, duration: —
Authority: —
Purpose of inspection: