# 742005282500
Unscheduled inspection
Start date: 2020-12-21, end date: 2021-01-25, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742005282495
Unscheduled inspection
Start date: 2020-12-21, end date: 2021-01-25, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004351017
Unscheduled inspection
Start date: 2020-03-23, end date: 2020-03-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of external and internal engineering networks and the construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation in accordance with parts 38 and 39 of Article 49 of this Code. If the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used2 The availability of a construction permit 3 Meeting the requirements of HR 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004351111
Unscheduled inspection
Start date: 2020-03-24, end date: 2020-03-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu fundamenta pod oborudovanie press v osyah BB229 i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 nastoyaschego Kodeksa i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 742004274276
Unscheduled inspection
Start date: 2020-02-17, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742004274323
Unscheduled inspection
Start date: 2020-02-14, end date: 2020-02-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of external and internal engineering networks and the construction materials used during the construction reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code. If the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used2 The availability of a construction permit 3 Meeting the requirements of HR 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004158383
Unscheduled inspection
Start date: 2020-01-10, end date: 2020-01-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of exterior finishing works finishing of the basement finishing of internal engineering networks of the roof finishing of translucent structures installation of external engineering networks and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the design documentation documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices used for energy resource 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004162526
Unscheduled inspection
Start date: 2020-01-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741903992965
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-11-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of enclosing structures of sandwich panels in axes 121D 121VD with the installation of a roofing pie of floors in axes 121 AB the actual performance and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, subject to changes included in the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with devices accounting for the energy resources used2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741903852153
Unscheduled inspection
Start date: 2019-10-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741903611980
Unscheduled inspection
Start date: 2019-09-30, end date: 2019-10-04, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po vosstanovleniyu i usileniyu metallokonstrukcii karkasa zdaniya ustroistvu ograzhdayuschih konstrukcii krovli i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741903028559
Unscheduled inspection
Start date: 2019-09-02, end date: 2019-09-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of a capital construction facility completed 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902934497
Unscheduled inspection
Start date: 2019-08-26, end date: 2019-08-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu naruzhnyh otdelochnyh rabot okonchanie pozharotusheniya okonchanie ventilyacii i kondicionirovaniya okonchanie otdelochnyh rabot okonchanie blagoustroistvu okonchanie vypolneniyu protivopozharnyh i sanitarnoepidemiologicheskih trebovanii i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741902800400
Unscheduled inspection
Start date: 2019-07-01, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741902800366
Unscheduled inspection
Start date: 2019-07-01, end date: 2019-07-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the actual condition of the object2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902792254
Unscheduled inspection
Start date: 2019-06-17, end date: 2019-06-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of landscaping work prior to asphalt laying and landscaping of external engineering networks of water supply and sewerage of electricity supply completion of internal engineering networks of water supply completion of fire protection of building structures workshop ABC completion of the construction materials used during the construction of the capital construction facility as well as the results of project documentation2 Availability of construction permits 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902690803
Unscheduled inspection
Start date: 2019-05-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902626336
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-04-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu otdelochnyh rabot sistem ventilyacii kondicionirovaniya vnutrennih setei vodootvedeniya setei bytovoi dozhdevoi proizvodstvennoi i drenazhnoi kanalizacii okonchanie naruzhnye seti gazosnabzheniya okonchanie ognezaschita stroitelnyh konstrukcii ABK i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741902570886
Unscheduled inspection
Start date: 2019-03-18, end date: 2019-03-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot po ustroistvu polov kotelnoi okonchanie i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 741902512050
Unscheduled inspection
Start date: 2019-02-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902415910
Unscheduled inspection
Start date: 2019-01-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741802292022
Unscheduled inspection
Start date: 2018-12-24, end date: 2019-01-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802215773
Unscheduled inspection
Start date: 2018-12-11, end date: 2018-12-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of basement beams and foundations FO1 the installation of roofs and enclosing structures of internal engineering networks of gas supply, water supply, external engineering networks and building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741801965568
Unscheduled inspection
Start date: 2018-10-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800661731
Unscheduled inspection
Start date: 2018-08-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800598211
Unscheduled inspection
Start date: 2018-08-08, end date: 2018-08-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Proverka vypolneniya pp 6 11 12 predpisaniya ot 11052017g so srokom vypolneniya do 07082018g s uchetom pisem o perenose srokov vypolneniya predpisaniya 431 ot 11072017g 324 ot 12102017g 417 ot 29122017g 43 ot 02032018g 120 ot 05062018g 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 74170802754206
Unscheduled inspection
Start date: 2017-10-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802754204
Unscheduled inspection
Start date: 2017-10-24, end date: 2017-11-21, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of a capital construction facility completed 2 The presence of a construction permit 3 Compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170801952822
Unscheduled inspection
Start date: 2017-09-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170801952818
Unscheduled inspection
Start date: 2017-09-01, end date: 2017-09-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po prokladke vodoprovoda na uchastke ot VK121PG do UP1 prokladke vodoprovoda na uchastke ot UP1 do VK122PG prokladke vodoprovoda na uchastke ot VK122PG do VK141PG ustroistvu vodoprovodnyh kolodcev i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 i 31 st 52 Gradostroitelnogo kodeksa RF
# 74170802512326
Unscheduled inspection
Start date: 2017-09-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802512321
Unscheduled inspection
Start date: 2017-09-20, end date: 2017-09-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot po promyvke dezinfekcii i ispytaniyu truboprovoda vrezke vodoprovoda i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF
# 74170701870585
Unscheduled inspection
Start date: 2017-08-10, end date: 2017-08-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Proverka vypolneniya pp 1234578910 predpisaniya ot 11052017 g2 Nalichie razresheniya na stroitelstvo3 Vypolnenie trebovanii chch 23 i 31 st 52 Gradostroitelnogo kodeksa RF
# 74170701661137
Unscheduled inspection
Start date: 2017-06-01, end date: 2017-06-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of external and internal engineering networks, landscaping, fire and sanitary epidemiological standards and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701576287
Unscheduled inspection
Start date: 2017-05-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160700823252
Unscheduled inspection
Start date: 2016-10-04, end date: 2016-10-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the actual condition of the facility 2 Availability of a construction permit 3 Compliance with the requirements of hr 23 st52 of the Urban Planning Code of the Russian Federation
# 74160601752373
Unscheduled inspection
Start date: 2016-08-02, end date: 2016-08-08, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: Fakticheskoe sostoyanie obekta
# 74160601788784
Unscheduled inspection
Start date: 2016-08-12, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: