# 342100261938
Unscheduled inspection
Start date: 2021-04-30, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of the activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for used energy resources, technical regulations and design documentation;
b) the purpose of this audit is to prevent, identify and suppress violations of the legislation of the Russian Federation, including technical regulations, and project documentation.
7. The subject of this audit is compliance with the mandatory requirements regarding:
a) compliance of the work performed and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction projects for which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources;
b) availability of a building permit;
c) fulfillment of the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 342105318471
Unscheduled inspection
Start date: 2021-01-22, end date: 2021-01-28, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: S celyu ocenki sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte, trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii, zakonodatelstva Rossiiskoi Federacii v oblasti ohrany okruzhayuschei sredy, trebovanii pozharnoi bezopasnosti i sanitarno-epidemiologicheskogo blagopoluchiya naseleniya, a takzhe trebovanii energeticheskoi effektivnosti i trebovanii osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov, tehnicheskih reglamentov i proektnoi dokumentacii;
Zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie, vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii, v tom chisle tehnicheskih reglamentov, i proektnoi dokumentacii.
7. Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v otnoshenii:
a) sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 Gradostroitelnogo Kodeksa RF proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 Gradostroitelnogo Kodeksa RF) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami Gradostroitelnogo Kodeksa RF), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov;
b) nalichiya razresheniya na stroitelstvo;
v) vypolneniya trebovanii, ustanovlennyh chastyami 2, 3 i 3.1 stati 52 Gradostroitelnogo kodeksa RF.
# 342004465542
Unscheduled inspection
Start date: 2020-08-03, end date: 2020-08-28, duration: —
Authority: Gosudarstvennaya inspekciya truda v Volgogradskoi oblasti
Purpose of inspection: osuschestvleniya federalnogo gosudarstvennogo nadzora za soblyudeniem rabotodatelem trebovanii trudovogo zakonodatelstva i inyh normativnyh pravovyh aktov soderzhaschih normy trudovogo prava v sootvetstvii s prikazom Rostruda 128 ot 11062020 izdannogo na osnovanii porucheniya zamestitelya Predsedatelya Pravitelstva Rossiiskoi Federacii TA Golikovoi ot 27122019 TGP1211486 sluzhebnaya zapiska 34346420PV ot 08072020g
# 342004240300
Unscheduled inspection
Start date: 2020-01-31, end date: 2020-02-06, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: s celyu ocenki sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii tehnicheskih reglamentov i proektnoi dokumentacii b zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii tehnicheskih reglamentov i proektnoi dokumentacii7 Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v otnosheniia sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 Gradostroitelnogo Kodeksa RF proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 Gradostroitelnogo Kodeksa RF i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami Gradostroitelnogo Kodeksa RF v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursovb nalichiya razresheniya na stroitelstvov vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa RF
# 341904072472
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a nastoyaschaya proverka provoditsya v sootvetstvii s programmoi proverok poluchennoi predstavitelem zastroischika OOO «Domostroitelnaya kompaniya» s celyu ocenki sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii tehnicheskih reglamentov i proektnoi dokumentacii b zadachei nastoyaschei proverki yavlyaetsya obespechenie sootvetstviya obekta trebovaniyam utverzhdennym proektnoi dokumentaciei 7 Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v otnosheniia sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 Gradostroitelnogo Kodeksa RF proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 Gradostroitelnogo Kodeksa RF i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami Gradostroitelnogo Kodeksa RF v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursovb nalichiya razresheniya na stroitelstvov vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa RF
# 341904072340
Unscheduled inspection
Start date: 2019-11-21, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 341903876228
Unscheduled inspection
Start date: 2019-10-09, end date: 2019-10-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a nastoyaschaya proverka provoditsya v sootvetstvii s programmoi proverok poluchennoi predstavitelem zastroischika OOO «Domostroitelnaya kompaniya» s celyu ocenki sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii tehnicheskih reglamentov i proektnoi dokumentacii b zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii tehnicheskih reglamentov i proektnoi dokumentacii7 Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v otnosheniia sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 Gradostroitelnogo Kodeksa RF proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 Gradostroitelnogo Kodeksa RF i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami Gradostroitelnogo Kodeksa RF v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursovb nalichiya razresheniya na stroitelstvov vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa RF
# 341903876820
Unscheduled inspection
Start date: 2019-10-15, end date: 2019-10-17, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a nastoyaschaya proverka provoditsya v sootvetstvii s programmoi proverok poluchennoi predstavitelem zastroischika OOO «Domostroitelnaya kompaniya» s celyu ocenki sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii tehnicheskih reglamentov i proektnoi dokumentacii b zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii tehnicheskih reglamentov i proektnoi dokumentacii7 Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v otnosheniia sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15 152 i 153 stati 48 Gradostroitelnogo Kodeksa RF proektnoi dokumentacii s uchetom izmenenii vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 38 i 39 stati 49 Gradostroitelnogo Kodeksa RF i ili informacionnoi modeli v sluchae esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami Gradostroitelnogo Kodeksa RF v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursovb nalichiya razresheniya na stroitelstvov vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa RF
# 341903627121
Unscheduled inspection
Start date: 2019-09-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 341902947775
Unscheduled inspection
Start date: 2019-08-12, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 341902885056
Unscheduled inspection
Start date: 2019-07-04, end date: 2019-07-09, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a nastoyaschaya proverka provoditsya v sootvetstvii s programmoi proverok poluchennoi predstavitelem zastroischika OOO «Domostroitelnaya kompaniya» s celyu ocenki sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii tehnicheskih reglamentov i proektnoi dokumentacii b zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii tehnicheskih reglamentov i proektnoi dokumentacii7 Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v otnosheniia sootvetstviya stroitelnyh rabot ih rezultatov i primenyaemyh stroitelnyh materialov trebovaniyam proektnoi dokumentaciib nalichiya razresheniya na stroitelstvov vypolneniya trebovanii ustanovlennyh chastyami 23 i 31 stati 52 Gradostroitelnogo kodeksa RF
# 341902884178
Unscheduled inspection
Start date: 2019-07-04, end date: 2019-07-09, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: a nastoyaschaya proverka provoditsya v sootvetstvii s programmoi proverok poluchennoi predstavitelem zastroischika OOO «Domostroitelnaya kompaniya» s celyu ocenki sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii i proektnoi dokumentacii b zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii tehnicheskih reglamentov i proektnoi dokumentacii7 Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v otnosheniia sootvetstviya stroitelnyh rabot ih rezultatov i primenyaemyh stroitelnyh materialov trebovaniyam proektnoi dokumentaciib nalichiya razresheniya na stroitelstvov vypolneniya trebovanii ustanovlennyh chastyami 23 i 31 stati 52 Gradostroitelnogo kodeksa RF
# 341902683020
Unscheduled inspection
Start date: 2019-04-19, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 341902460076
Unscheduled inspection
Start date: 2019-02-01, end date: 2019-02-07, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: celyu ocenki sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii zakonodatelstva Rossiiskoi Federacii v oblasti ohrany okruzhayuschei sredy trebovanii pozharnoi bezopasnosti i sanitarnoepidemiologicheskogo blagopoluchiya naseleniya a takzhe trebovanii energeticheskoi effektivnosti i trebovanii osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii 7 Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v otnoshenii a sootvetstviya stroitelnyh rabot ih rezultatov i primenyaemyh stroitelnyh materialov trebovaniyam proektnoi dokumentacii b nalichiya razresheniya na stroitelstvo v vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa RF
# 341902534617
Unscheduled inspection
Start date: 2019-01-25, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 341802191471
Unscheduled inspection
Start date: 2018-11-29, end date: 2018-12-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: S celyu ocenki sootvetstviya Obekta trebovaniyam proektnoi dokumentacii zadachei nastoyaschei proverki yavlyaetsya obespechenie sootvetstviya Obekta trebovaniyam proektnoi dokumentacii
# 341801888714
Unscheduled inspection
Start date: 2018-10-02, end date: 2018-10-05, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: s celyu ocenki sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii i proektnoi dokumentaciizadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v otnoshenii a sootvetstviya stroitelnyh rabot ih rezultatov i primenyaemyh stroitelnyh materialov trebovaniyam proektnoi dokumentacii b nalichiya razresheniya na stroitelstvo v vypolneniya trebovanii ustanovlennyh chastyami 23 i 31 stati 52 Gradostroitelnogo kodeksa RF
# 341801609095
Unscheduled inspection
Start date: 2018-09-14, end date: 2018-09-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: s celyu ocenki sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii zakonodatelstva Rossiiskoi Federacii v oblasti ohrany okruzhayuschei sredy trebovanii pozharnoi bezopasnosti i sanitarnoepidemiologicheskogo blagopoluchiya naseleniya a takzhe trebovanii energeticheskoi effektivnosti i trebovanii osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov i proektnoi dokumentacii zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v otnoshenii a sootvetstviya stroitelnyh rabot ih rezultatov i primenyaemyh stroitelnyh materialov trebovaniyam proektnoi dokumentacii b nalichiya razresheniya na stroitelstvo v vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa RF
# 341801279771
Unscheduled inspection
Start date: 2018-09-14, end date: 2018-09-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: s celyu ocenki sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii zakonodatelstva Rossiiskoi Federacii v oblasti ohrany okruzhayuschei sredy trebovanii pozharnoi bezopasnosti i sanitarnoepidemiologicheskogo blagopoluchiya naseleniya a takzhe trebovanii energeticheskoi effektivnosti i trebovanii osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov i proektnoi dokumentacii zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii i proektnoi dokumentacii predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v otnoshenii a sootvetstviya stroitelnyh rabot ih rezultatov i primenyaemyh stroitelnyh materialov trebovaniyam proektnoi dokumentacii b nalichiya razresheniya na stroitelstvo v vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa RF
# 341801229014
Unscheduled inspection
Start date: 2018-08-31, end date: 2018-09-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation and project documentation, the objective of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation and project documentation. The subject of this audit is compliance with mandatory requirements regarding a compliance of construction works, their results and the construction materials used with the requirements of project documentation b availability of a construction permit c meeting the requirements established by parts 23 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 341800597832
Unscheduled inspection
Start date: 2018-07-30, end date: 2018-08-03, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, the legislation of the Russian Federation in the field of environmental protection, fire safety requirements and sanitary and epidemiological welfare of the population, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and design documentation, the objective of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and project documentation, The subject of this audit is compliance with mandatory requirements regarding a compliance of construction works, their results and applied building materials with the requirements of technical regulations of project documentation b availability of a building permit c compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 341800480621
Unscheduled inspection
Start date: 2018-05-25, end date: 2018-05-31, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: s celyu ocenki sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v otnoshenii a sootvetstviya stroitelnyh rabot ih rezultatov i primenyaemyh stroitelnyh materialov trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii b nalichiya razresheniya na stroitelstvo v vypolneniya trebovanii ustanovlennyh chastyami 23 i 31 stati 52 Gradostroitelnogo kodeksa RF
# 341800271053
Unscheduled inspection
Start date: 2018-04-05, end date: 2018-05-04, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: Cel proverki ocenka ispolneniya predpisaniya ot 21092017 9207 zadacha vyyavlenie i presechenie narushenii zakonodatelstva ob uchastii v dolevom stroitelstve predmet proverki vypolnenie predpisaniya ot 21092017 9207
# 34170802769586
Unscheduled inspection
Start date: 2017-10-24, end date: 2017-10-30, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of an Object with the requirements of technical regulations of other regulatory legal acts and project documentation, the task of this audit is to ensure that the Object meets the requirements of technical regulations of other regulatory legal acts and project documentationthe subject of this audit is compliance with mandatory requirements regarding the compliance of construction works with their results and applied building materials with the requirements of technical regulations of other regulatory legal acts and project documentation
# 34170802165494
Unscheduled inspection
Start date: 2017-09-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 34170701871247
Unscheduled inspection
Start date: 2017-08-08, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 34170701865141
Unscheduled inspection
Start date: 2017-08-04, end date: 2017-08-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: s celyu ocenki sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva Rossiiskoi Federacii v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciipredmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v otnosheniia sootvetstviya stroitelnyh rabot ih rezultatov i primenyaemyh stroitelnyh materialov trebovaniyam tehnicheskih reglamentov proektnoi dokumentaciib nalichiya razresheniya na stroitelstvov vypolneniya trebovanii ustanovlennyh chastyami 23 i 31 stati 52 Gradostroitelnogo kodeksa RF
# 34170701835343
Unscheduled inspection
Start date: 2017-07-26, end date: 2017-07-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with technical requirements regulations of the project documentation, the availability of a construction permit, and the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 34170701738576
Unscheduled inspection
Start date: 2017-06-26, end date: 2017-07-07, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of an Object with the requirements of technical regulations of other regulatory legal acts and project documentation, the task of this audit is to ensure that the Object meets the requirements of technical regulations of other regulatory legal acts and project documentationthe subject of this audit is compliance with mandatory requirements regarding the compliance of construction works with their results and applied building materials with the requirements of technical regulations of other regulatory legal acts and project documentation
# 34170701615841
Unscheduled inspection
Start date: 2017-05-19, end date: 2017-05-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with technical requirements the regulations of the project documentation, the availability of a construction permit, and the fulfillment of the established requirements for admission to construction work
# 34170701597905
Unscheduled inspection
Start date: 2017-05-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 34170701456497
Unscheduled inspection
Start date: 2017-03-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 34170701409912
Unscheduled inspection
Start date: 2017-02-28, end date: 2017-03-02, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: in order to assess the compliance of activities carried out at the facility with the requirements of the urban planning legislation of the Russian Federation, including technical regulations and design documentationthe task of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works, their results and applied building materials with technical requirements the regulations of the project documentation, the availability of a construction permit, and the fulfillment of the established requirements for admission to construction work
# 34160701232562
Unscheduled inspection
Start date: 2016-12-15, end date: 2016-12-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and design documentationthe purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements regarding the conformity of construction works, their results and the construction materials used, with the requirements of technical regulations, project documentation, and the availability of a construction permit, and compliance with established requirements for admission to construction work
# 34160701128834
Unscheduled inspection
Start date: 2016-11-11, end date: 2016-11-17, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: s celyu ocenki sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciizadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciipredmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v otnosheniia sootvetstviya stroitelnyh rabot ih rezultatov i primenyaemyh stroitelnyh materialov trebovaniyam tehnicheskih reglamentov proektnoi dokumentaciib nalichiya razresheniya na stroitelstvov vypolneniya ustanovlennyh trebovanii o dopuske k vypolneniyu stroitelnyh rabot
# 34160700433273
Unscheduled inspection
Start date: 2016-10-04, end date: 2016-10-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and design documentationthe purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements regarding the conformity of construction works, their results and the construction materials used, with the requirements of technical regulations, project documentation, and the availability of a construction permit, and compliance with established requirements for admission to construction work
# 34160601696354
Unscheduled inspection
Start date: 2016-07-05, end date: 2016-07-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: ocenki sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii a takzhe trebovanii energeticheskoi effektivnosti i trebovanii osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii
# 34160601696330
Unscheduled inspection
Start date: 2016-07-05, end date: 2016-07-11, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: ocenka sootvetstviya deyatelnosti osuschestvlyaemoi na Obekte trebovaniyam gradostroitelnogo zakonodatelstva Rossiiskoi Federacii zakonodatelstva Rossiiskoi Federacii v oblasti ohrany okruzhayuschei sredy trebovanii pozharnoi bezopasnosti i sanitarnoepidemiologicheskogo blagopoluchiya naseleniya a takzhe trebovanii energeticheskoi effektivnosti i trebovanii osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciisoblyudenie obyazatelnyh trebovanii v otnosheniia sootvetstviya stroitelnyh rabot ih rezultatov i primenyaemyh stroitelnyh materialov trebovaniyam tehnicheskih reglamentov proektnoi dokumentaciib nalichiya razresheniya na stroitelstvov vypolneniya ustanovlennyh trebovanii o dopuske k vypolneniyu stroitelnyh rabot
# 34160601728529
Unscheduled inspection
Start date: 2016-07-21, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection:
# 34160601744412
Unscheduled inspection
Start date: 2016-07-29, end date: 2016-08-04, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: In order to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation, as well as energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including technical regulations and design documentationthe purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements regarding the conformity of construction works, their results and the construction materials used, with the requirements of technical regulations, project documentation, and the availability of a construction permit, and compliance with established requirements for admission to construction work