# 161904015587
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 19112019 case 121120180023the objectives of this inspection are to prevent, identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer of the works performed during the construction of the capital construction facility with the requirements of mandatory requirements and or requirements established by municipal authorities. legal acts
# 161903938060
Unscheduled inspection
Start date: 2019-11-11, end date: 2019-11-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules for determining the fact of execution of the order, as well as for the purpose of drawing up an act on the elimination of violations of the order based on the notice received by the Inspectorate from 30102019 10760 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the order from 30092019 1212104401 to 30102019 and the expiration of the order from 30092019 1212104401, the deadline for which expired on 30102019the tasks of this audit are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and design documentation. Documentationthe subject of this audit is to select the necessary fulfillment of the instructions of the state control bodies supervision of municipal control bodies
# 161903678795
Unscheduled inspection
Start date: 2019-10-04, end date: 2019-10-11, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program from 30032018 case 121120180023the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts. acts
# 161903566813
Unscheduled inspection
Start date: 2019-09-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161902996703
Unscheduled inspection
Start date: 2019-09-05, end date: 2019-09-05, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of fulfillment of the order dated 24052019 1212048201, the deadline for which expired on 15072019, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations of compliance by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations and other regulatory documents performed during the construction of a capital construction facility. legal acts and project documentationthe subject of this audit is to select the necessary fulfillment of the instructions of the state control bodies, supervision bodies of municipal control
# 161902993395
Unscheduled inspection
Start date: 2019-08-28, end date: 2019-09-04, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules for determining the fact of execution of the order, as well as for the purpose of drawing up an act on the elimination of violations of the order based on the notice received by the Inspectorate from 31072019 6632 16082019 7424 on the elimination of violations during the construction reconstruction of a capital construction facility that were ordered to be eliminated in the term established by the regulation from 17072019 1212072402 17072019 1212072401 to 19082019 19082019 and the expiration of the period for the execution of the regulation from 17072019 1212072401 17072019 1212072402 the term of which expired 19082019 19082019the objectives of this audit are the prevention as well as the detection and suppression of violations committed by the developer customer the person carrying out construction on the basis of a contract with the developer or customer of compliance with the works performed during the construction of the capital construction facility requirements technical regulations, other regulatory legal acts, and project documentationthe subject of this audit is to comply with the instructions of state control bodies, supervision bodies, and municipal control bodies.
# 161902859797
Unscheduled inspection
Start date: 2019-07-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161902805280
Unscheduled inspection
Start date: 2019-06-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161902722734
Unscheduled inspection
Start date: 2019-05-23, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 161902742823
Unscheduled inspection
Start date: 2019-05-27, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 161902646731
Unscheduled inspection
Start date: 2019-04-16, end date: 2019-04-17, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to determine the fact of fulfillment of the order dated 28022019 1212019501, the deadline for which expired 05042019 18012019 1212003101, the deadline for which expired 05042019 and drawing up an act based on the inspection results. The objectives of this inspection are to prevent, identify and suppress violations of conformity committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer performed during the construction of the facility The subject of this audit is to select the necessary compliance with the requirements of state control bodies, supervision bodies, and municipal control bodies for capital construction and work requirements of technical regulations, other regulatory legal acts, and project documentation.
# 161902650739
Unscheduled inspection
Start date: 2019-04-17, end date: 2019-04-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program from 30032018 case 121120180023 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations and other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts
# 161902612745
Unscheduled inspection
Start date: 2019-04-01, end date: 2019-04-01, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules for determining the fact of execution of the order, as well as for the purpose of drawing up an act on the elimination of violations of the order based on the notice received by the Inspection from 04032019 1859 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by regulation from 08022019 1212011501 to 11032019 and the expiration of the period for the execution of the regulation from 08022019 1212011501, the deadline for which has expired 11032019 The objectives of this audit are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, violations of compliance performed during the construction of a capital construction facility with the requirements of technical regulations other regulatory legal acts and The subject of this audit is the fulfillment of the requirements of the state control bodies, supervision of municipal control bodies.
# 161902613457
Unscheduled inspection
Start date: 2019-04-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161902617484
Unscheduled inspection
Start date: 2019-04-09, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 161902520390
Unscheduled inspection
Start date: 2019-03-05, end date: 2019-03-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules for determining the fact of execution of the order, as well as for the purpose of drawing up an act on the elimination of violations of the order based on the notice received by the Inspectorate from 10012019 96 28012019 617 on the elimination of violations during the construction reconstruction of a capital construction facility that were ordered to be eliminated in the period established by the regulation from 15112018 1219111801 15112018 1219111802 to 14122018 14122018 and the expiration of the period of execution of the regulation from 15112018 1219111802 15112018 1219111801 06022019 1212009901, the period of execution of which expired on 14122018 14122018 04032019
# 161902523269
Unscheduled inspection
Start date: 2019-02-22, end date: 2019-02-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this audit is conducted in order to determine the fact of fulfillment of the order dated 18012019 1212003001, the deadline for which expired 18022019 18012019 1212003002, the deadline for which expired 18022019 and drawing up an act based on the results of the audit The objectives of this audit are to prevent as well as identify and suppress violations of conformity committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer performed during the construction of the facility The subject of this audit is to select the necessary compliance with the requirements of state control bodies, supervision bodies, and municipal control bodies for capital construction and work requirements of technical regulations, other regulatory legal acts, and project documentation.
# 161902450029
Unscheduled inspection
Start date: 2019-02-05, end date: 2019-03-04, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program dated 19032018 case 121120180020
# 161902500196
Unscheduled inspection
Start date: 2019-02-08, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 161902431423
Unscheduled inspection
Start date: 2019-01-15, end date: 2019-01-18, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 26/122018 case 121120170063 The objectives of this inspection are to prevent, identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, carried out during the construction of a capital construction facility. The subject of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 161902442033
Unscheduled inspection
Start date: 2019-01-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161902467404
Unscheduled inspection
Start date: 2019-01-28, end date: 2019-01-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate dated 25/122018 10391 24/122018 10314 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation dated 07/122018 1219/122401 07122018 1219122402 until 14012019, the objectives of this audit are to prevent, identify and suppress violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this audit is to comply with the instructions of state control bodies, supervision bodies, municipal control bodies
# 161802337593
Unscheduled inspection
Start date: 2018-12-25, end date: 2018-12-26, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the Inspection notification dated 19122018 10080 19122018 10078 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation dated 14112018 1219111702 14112018 1219111701 to 14122018
# 161802184087
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-07, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This audit is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with The inspection program from 30032018 case 121120180023 The objectives of this inspection are to prevent, identify and prevent violations of compliance with technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, with the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this inspection is compliance with mandatory requirements and or requirements established by the Legislation of the Russian Federation. municipal legal acts
# 161802127969
Unscheduled inspection
Start date: 2018-11-20, end date: 2018-11-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determination of the fact of execution of the order dated 20092018 1219088201, the deadline for which expired 20102018, and drawing up an act based on the results of the inspection, prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation, with the requirements of the authorities state control supervision of municipal control bodies
# 161802041048
Unscheduled inspection
Start date: 2018-11-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161802091785
Unscheduled inspection
Start date: 2018-11-13, end date: 2018-11-14, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the work performed, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as to draw up an inspection report on the completed construction of the facility in accordance with the received to the Inspection with a notice dated 02112018 8370 on the completion of the construction of the capital construction facility
# 161802091846
Unscheduled inspection
Start date: 2018-11-14, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 161801630479
Unscheduled inspection
Start date: 2018-10-03, end date: 2018-10-04, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules for determining the fact of execution of the order, as well as for the purpose of drawing up an act on the elimination of violations of the order based on the notice received by the Inspectorate from 06092018 6413 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which were ordered to be eliminated within the time limit set by by the order from 07082018 1219071301 to 07092018 and the expiration of the period of execution of the order from 07082018 1219071301, the period of execution of which expired 07092018
# 161800676565
Unscheduled inspection
Start date: 2018-09-10, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 161800500105
Unscheduled inspection
Start date: 2018-09-10, end date: 2018-09-12, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: determining the fact of execution of the order dated 03072018 1219061101, the deadline for which expired on 15082018, and drawing up an act based on the results of the inspection, warning, as well as detecting and suppressing violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation, carried out during the construction of the capital construction facility. state control supervision of municipal control bodies
# 161801663747
Unscheduled inspection
Start date: 2018-09-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161801583597
Unscheduled inspection
Start date: 2018-08-13, end date: 2018-09-07, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: protection of the rights and interests of employees the basis of paragraph 4 of Part 7 of Article 360 of the Labor Code memo dated 02082018 The objectives of this audit are to ensure compliance and protection of labor rights and freedoms of citizens ensuring compliance by the employer with labor legislation and other regulatory legal acts containing labor law norms The subject of this audit is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts compliance of the information contained in the notification of the commencement of certain types of entrepreneurial activity with mandatory requirements compliance with the instructions of state control bodies supervision of municipal control bodies holding events
# 161800597418
Unscheduled inspection
Start date: 2018-08-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161800606158
Unscheduled inspection
Start date: 2018-08-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161800599349
Unscheduled inspection
Start date: 2018-08-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161800393993
Unscheduled inspection
Start date: 2018-08-07, end date: 2018-08-08, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the Inspection notification dated 05072018 4640 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 05062018 1219051501 to 05072018
# 161800538338
Unscheduled inspection
Start date: 2018-07-11, end date: 2018-07-11, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the fact of fulfillment of the order dated 04052018 1219041001, the deadline for which expired on 18062018, and to draw up an act based on the results of the inspection. The objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations and other regulations. regulatory legal acts and project documentation The subject of this audit is to select the necessary fulfillment of the instructions of the state control bodies supervision of municipal control bodies
# 161800500071
Unscheduled inspection
Start date: 2018-07-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161800347549
Unscheduled inspection
Start date: 2018-05-16, end date: 2018-05-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program from 26032018 case 121120160111, the objectives of this inspection are to prevent, identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, performed during the construction of the capital construction facility. The subject of this inspection is to select the necessary compliance with mandatory requirements and or the requirements established by municipal legal acts
# 161800351563
Unscheduled inspection
Start date: 2018-05-07, end date: 2018-05-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: to establish compliance with the requirements of Part 5 of Article 52 of the Urban Planning Code of the Russian Federation, as well as to determine whether the construction materials used in the construction of a capital construction facility comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of the notice received by the Inspectorate on the start of construction of a capital construction facility dated 23042018 2749, the objectives of this audit are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, violations of compliance of works performed during the construction of the capital construction facility with the requirements of technical regulations and other regulations. regulatory legal acts and project documentation compliance with mandatory requirements and or requirements established by municipal legal acts
# 161800538272
Unscheduled inspection
Start date: 2018-04-24, end date: 2018-05-04, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program from 06062017 case 121120170063, the objectives of this inspection are to prevent, identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. The subject of this inspection is to select the necessary compliance with mandatory requirements and or the requirements established by municipal legal acts
# 161800242819
Unscheduled inspection
Start date: 2018-04-03, end date: 2018-04-05, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program from 26032018 case 121120160111, the objectives of this inspection are to prevent, identify and suppress violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, performed during the construction of a capital construction facility. The purpose of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 161800016545
Unscheduled inspection
Start date: 2018-01-25, end date: 2018-01-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the Inspection notification dated 1001201867 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 06122017 1219139101 to 31.012018 The objectives of this audit are to prevent as well as identify and suppress violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts, and project documentation committed by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. 7 The subject of this audit is to select the necessary compliance with the requirements of state control, supervision, and municipal control bodies
# 16170802914299
Unscheduled inspection
Start date: 2017-12-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16170802933321
Unscheduled inspection
Start date: 2017-12-04, end date: 2017-12-06, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program from 06062017 case 121120170063, the objectives of this inspection are to prevent, identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. The purpose of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 16170802793360
Unscheduled inspection
Start date: 2017-11-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16170802675867
Unscheduled inspection
Start date: 2017-10-04, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 16170802683055
Unscheduled inspection
Start date: 2017-10-13, end date: 2017-10-13, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the Inspection notification dated 26092017 7736 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 26072017 1219085201 to 25092017G Tasks The purpose of this audit is to prevent as well as identify and suppress violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentationthe purpose of this audit is to select the necessary compliance with the instructions of state control bodies, supervision bodies, municipal control bodies.
# 16170802153275
Unscheduled inspection
Start date: 2017-09-14, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 16170802342442
Unscheduled inspection
Start date: 2017-09-14, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 16170802153272
Unscheduled inspection
Start date: 2017-09-13, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 16170701873167
Unscheduled inspection
Start date: 2017-08-10, end date: 2017-08-14, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction and reconstruction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with energy metering devices, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation. in accordance with the inspection program from 06062017 case 121120170063the objectives of this inspection are to prevent, as well as identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation carried out by the developer, the client, the person carrying out construction on the basis of a contract with the developer or the customer, performed during the construction of a capital construction facility. The purpose of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts
# 16170701817477
Unscheduled inspection
Start date: 2017-07-25, end date: 2017-07-26, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction and reconstruction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with energy metering devices, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation. in accordance with the inspection program dated 17052016 case 121120160029the objectives of this inspection are to prevent, as well as identify and prevent violations of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation7 carried out by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of the work performed during the construction of the capital construction facility. requirements established by municipal legal acts
# 16170701648597
Unscheduled inspection
Start date: 2017-06-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16170701626710
Unscheduled inspection
Start date: 2017-05-22, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 16170701511115
Unscheduled inspection
Start date: 2017-04-06, end date: 2017-04-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine whether the construction materials used in the construction and reconstruction of a capital construction facility and the results of such work comply with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with energy metering devices, construction permits, and compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation. in accordance with the inspection program dated 29062016 case 77501, the objectives of this inspection are to prevent, as well as identify and prevent violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The purpose of this inspection is to select the necessary compliance with mandatory requirements
# 16160601745787
Unscheduled inspection
Start date: 2016-07-28, end date: 2016-07-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: prevention, as well as detection and suppression of violations committed by the person carrying out the construction of the compliance of the works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation