Found 1 inspection:

# 782100474177
Unscheduled inspection
Start date: 2021-09-01, end date: —, duration: 10
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy Sankt-Peterburga
Purpose of inspection: Determination of compliance of the constructed capital construction facility with the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. Prevention, as well as identification and suppression of violations committed by the person carrying out the construction, of compliance with the work performed during the construction of the facility with the requirements of the design documentation. Verification of the completed capital construction facility for compliance with the requirements of design documentation, including fire-fighting measures, measures to ensure the sanitary and epidemiological well-being of the population, environmental protection, energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used.


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.