# 772004418653
Unscheduled inspection
Start date: 2020-05-27, end date: 2020-05-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor Compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including the requirements of energy efficiency efficiency and equipment requirements of the capital construction facility with metering devices for energy resources used
# 772004253451
Unscheduled inspection
Start date: 2020-02-03, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 771903936982
Unscheduled inspection
Start date: 2019-11-05, end date: —, duration: —
Authority: —
Purpose of inspection: