Found 44 inspections:

# 772101392554
Unscheduled inspection
Start date: 2021-11-29, end date: 2021-12-09, duration: 9
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100988544
Unscheduled inspection
Start date: 2021-09-27, end date: —, duration:
Authority:
Purpose of inspection:


# 772100449656
Unscheduled inspection
Start date: 2021-08-12, end date: 2021-08-27, duration: 12
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100271416
Unscheduled inspection
Start date: 2021-06-07, end date: 2021-06-25, duration: 14
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100220619
Unscheduled inspection
Start date: 2021-05-18, end date: 2021-05-20, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100219168
Unscheduled inspection
Start date: 2021-05-18, end date: —, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100170321
Unscheduled inspection
Start date: 2021-04-22, end date: 2021-04-23, duration: 2
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100031203
Unscheduled inspection
Start date: 2021-02-26, end date: 2021-03-16, duration: 12
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Celi proverki: provedenie meropriyatii po kontrolyu v svyazi s vypolneniem programmy proverok; Zadachi proverki: preduprezhdenie, vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii trebovanii proektnoi dokumentacii, zakonodatelstva o gradostroitelnoi deyatelnosti; Predmet proverki: sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii, v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov, v tom chisle proverka ustraneniya vyyavlennyh pri provedenii stroitelnogo kontrolya i osuschestvleniya gosudarstvennogo stroitelnogo nadzora narushenii sootvetstviya vypolnennyh rabot trebovaniyam proektnoi dokumentacii


# 772105305609
Unscheduled inspection
Start date: 2021-01-19, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772004483100
Unscheduled inspection
Start date: 2020-08-13, end date: 2020-08-26, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notice from the developer of the customer. The objectives of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development activities by the person being audited. The subject of the audit is to verify the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources


# 772004456966
Unscheduled inspection
Start date: 2020-07-15, end date: 2020-07-17, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and requirements for the equipment of the capital construction facility with metering devices for used energy resources


# 772004412956
Unscheduled inspection
Start date: 2020-05-20, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772004387440
Unscheduled inspection
Start date: 2020-03-30, end date: 2020-03-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer's task of verification, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to check and verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772004310455
Unscheduled inspection
Start date: 2020-02-25, end date: 2020-02-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used


# 772004220031
Unscheduled inspection
Start date: 2020-01-22, end date: 2020-01-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer of the customer's task of verification, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to check and verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771903942133
Unscheduled inspection
Start date: 2019-11-08, end date: —, duration:
Authority:
Purpose of inspection:


# 771903980295
Unscheduled inspection
Start date: 2019-11-18, end date: —, duration:
Authority:
Purpose of inspection:


# 771903809525
Unscheduled inspection
Start date: 2019-10-04, end date: 2019-10-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for energy resources used


# 771903643436
Unscheduled inspection
Start date: 2019-09-20, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77190803489274
Unscheduled inspection
Start date: 2019-08-29, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77190803447600
Unscheduled inspection
Start date: 2019-06-27, end date: 2019-07-10, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu provedenie meropriyatii po kontrolyu v svyazi s vypolneniem programmy proverok na osnovanii utverzhdennoi programmy proverok ot 25122018 2Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii trebovanii proektnoi dokumentacii zakonodatelstva o gradostroitelnoi deyatelnostiPredmetom nastoyaschei proverki yavlyaetsya sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov proverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom 362419 ot 28052019


# 77190803406854
Unscheduled inspection
Start date: 2019-04-26, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803369059
Unscheduled inspection
Start date: 2019-03-12, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77190803341981
Unscheduled inspection
Start date: 2019-02-20, end date: 2019-02-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu sootvetstvie obekta kapitalnogo stroitelstva trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na osnovanii utverzhdennoi programmy proverok ot 25122018 2Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 77180803308918
Unscheduled inspection
Start date: 2018-12-29, end date: 2019-01-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803283971
Unscheduled inspection
Start date: 2018-11-23, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803257591
Unscheduled inspection
Start date: 2018-10-19, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803230160
Unscheduled inspection
Start date: 2018-09-18, end date: 2018-09-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803203720
Unscheduled inspection
Start date: 2018-08-14, end date: 2018-08-16, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, certificates of admission issued by a self-regulatory organization to works that affect the safety of capital construction facilities, construction permits


# 501800522287
Unscheduled inspection
Start date: 2018-06-22, end date: 2018-07-13, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Proverka ispolneniya predpisaniya ot 23052018 0131150900501 izveschenie ob ustranenii ot 15062018 P001842255133713737056 ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii


# 77170802658567
Unscheduled inspection
Start date: 2017-10-03, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802784666
Unscheduled inspection
Start date: 2017-10-30, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802448844
Unscheduled inspection
Start date: 2017-09-18, end date: 2017-09-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701873584
Unscheduled inspection
Start date: 2017-08-08, end date: 2017-08-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701790920
Unscheduled inspection
Start date: 2017-07-13, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701790407
Unscheduled inspection
Start date: 2017-07-07, end date: 2017-08-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701802967
Unscheduled inspection
Start date: 2017-07-20, end date: 2017-08-04, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701634213
Unscheduled inspection
Start date: 2017-05-24, end date: 2017-06-07, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701568495
Unscheduled inspection
Start date: 2017-05-24, end date: —, duration:
Authority:
Purpose of inspection:


# 77160701238449
Unscheduled inspection
Start date: 2016-12-09, end date: 2016-12-14, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 50160701259687
Unscheduled inspection
Start date: 2016-12-28, end date: 2016-12-29, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Proverka ispolneniya predpisaniya 0461123300505 ot 30112016 ocenka sootvetstviya vypolnyaemyh rabot trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii na obekte kapitalnogo stroitelstva nadzemnye garazhi stoyanki korpus 26a 29a vtoraya ochered stroitelstva po adresu Moskovskaya obl Mytischinskii rn g Mytischi mkr 17A


# 77160700973400
Unscheduled inspection
Start date: 2016-10-06, end date: 2016-10-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used


# 77160700029204
Unscheduled inspection
Start date: 2016-08-16, end date: 2016-08-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used


# 77160601751449
Unscheduled inspection
Start date: 2016-07-28, end date: 2016-07-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.