Found 7 inspections:

# 742004412381
Unscheduled inspection
Start date: 2020-05-18, end date: —, duration:
Authority: FGKU Specialnoe upravlenie FPS 10 MCHS Rossii
Purpose of inspection:


# 741903014233
Unscheduled inspection
Start date: 2019-09-04, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741902954968
Unscheduled inspection
Start date: 2019-08-15, end date: 2019-08-21, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the fulfillment of the prescription from 050819g with a deadline of 150819g2 The availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902890138
Unscheduled inspection
Start date: 2019-07-30, end date: 2019-08-05, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed on the floor covering above the second floor, the bathroom floor, and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902807357
Unscheduled inspection
Start date: 2019-06-26, end date: 2019-07-02, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the roof covering device and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902758946
Unscheduled inspection
Start date: 2019-06-05, end date: 2019-06-10, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed during dismantling to the brickwork around the perimeter of the building in the cornice area during the installation of the rafter system and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the design documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902541463
Unscheduled inspection
Start date: 2019-03-06, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.