Found 1 inspection:

# 82170701593986
Unscheduled inspection
Start date: 2017-05-15, end date: 2017-05-19, duration:
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora Respubliki Krym
Purpose of inspection: The purpose is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations, other normative acts and project documentation, including requirements for energy efficiency and requirements for equipping the capital construction facility with metering devices for energy resources used, the presence of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 The Urban Planning Code of the Russian Federation during the construction of a capital construction facility tasks prevention detection and suppression of violations of the law on the contract with the developer or the customer committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer violations of the law on urban planning activities, including technical regulations and design documentationsubject compliance with mandatory requirements for the prevention of natural and man-made emergencies


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.