Found 1 inspection:

# 782005270532
Unscheduled inspection
Start date: 2020-12-10, end date: 2021-01-14, duration: 20
Authority: Sluzhba gosudarstvennogo stroitelnogo nadzora i ekspertizy SanktPeterburga
Purpose of inspection: determination of compliance of the work and construction materials used in the construction of a capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements compliance with the requirements of h2 h 3 h 31 st 52 of the Urban Planning Code, prevention as well as identification and suppression of violations of compliance by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer During the construction of the capital construction facility, the requirements of the project documentation are met


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.