Found 12 inspections:

# 742100274767
Unscheduled inspection
Start date: 2021-06-15, end date: 2021-07-12, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the installation of the pulp pipeline (No. 3), installation of pumping units of the PNS-1; PNS-2; PNS-3 pulp pumping station, installation of station pipelines of the PNS-1; PNS-2; PNS-3 pulp pumping station, installation of station pipelines of emergency tank No. 1;2 and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.


# 742100184760
Unscheduled inspection
Start date: 2021-05-11, end date: —, duration: 15
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the Installation of the pulp pipeline (No. 3), installation of pumping units of the pulp pumping station PNS-1; PNS-2; PNS-3 and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 this Code of Project documentation (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities that are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742100094459
Unscheduled inspection
Start date: 2021-03-31, end date: 2021-04-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on 1) Sand preparation device for w/b blocks 2) Installation of concrete blocks 3) Installation of sliding supports for the pulp pipeline (3 threads) 4) Installation of guide supports for the pulp pipeline (3 threads) 5) Installation of the pulp pipeline (3 threads) and used building materials during construction, reconstruction the capital construction facility, as well as the results of such work, meet the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintaining an information model is mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 742004235165
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-02-07, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The conformity of work on the Warehouse of finished products, the installation of external on-site networks and structures in the course of work on the Administrative Building, the installation of external on-site networks and structures in the course of work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code, including energy efficiency requirements, with the exception of capital construction projects that are not subject to energy efficiency requirements and equipment of the capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741904043698
Unscheduled inspection
Start date: 2019-12-11, end date: 2019-12-17, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the Warehouse of finished products with the installation of a membrane roof in the process of work, the installation of a monolithic floor slab in the process of work, the installation of internal engineering networks in the process of work, the installation of external on-site networks and structures in the process of work, the Administrative building, the installation of external on-site networks and structures in the process of work, the pumping station, and construction work in the process of work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model if the formation and maintenance of information models are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for energy resources used2 The availability of a construction permit3 Compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741903797268
Unscheduled inspection
Start date: 2019-10-21, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741902988845
Unscheduled inspection
Start date: 2019-09-02, end date: 2019-09-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the Warehouse of finished products with the installation of the foundation after completion of the work, the installation of metal structures of the building frame during the work, the installation of enclosing structures of walls made of sandwich panels during the work, the installation of profiled roofing during the work, the installation of a membrane roof during the work, the installation of a monolithic floor slab during the work, the installation of external indoor networks and structures during the execution of work, the Administrative building, the installation of external on-site networks and structures during the execution of work, the pumping station, construction work during the execution of work, the boiler house, construction work during the execution of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, project documentation2 The availability of a construction permit,3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code Russian Federation


# 74170701498337
Unscheduled inspection
Start date: 2017-04-17, end date: 2017-04-21, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of on-site networks of the HVAC roof and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701217578
Unscheduled inspection
Start date: 2016-12-14, end date: 2016-12-20, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of technological wells, testing of pipelines, backfilling, verification of fire and sanitary epidemiological measures and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations for project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701098298
Unscheduled inspection
Start date: 2016-11-14, end date: 2016-11-18, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the work on the installation of the foundation for pipelines, the installation of pipelines and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The availability of a construction permit3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701025736
Unscheduled inspection
Start date: 2016-10-24, end date: 2016-10-28, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the walls and ceilings of the RBB building with the internal walls and ceilings of the building, the internal engineering networks of the building, the on-site networks and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The availability of a construction permit3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160700620127
Unscheduled inspection
Start date: 2016-09-26, end date: 2016-09-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: Compliance of the work on the walls of the RBB building with the internal walls of the floors of the coating of the OPZ building, the frame of the walls of the oil station building, the internal engineering networks of the OPZ building, the on-site networks and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The availability of a construction permit 3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation