Found 44 inspections:

# 001902681613
Unscheduled inspection
Start date: 2019-02-25, end date: 2019-03-01, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control over the implementation of regulation 357517rp54 dated 21/122018, the deadline for which expired on 01022019. The objectives of this audit are to assess the compliance of activities or actions omissions carried out by a legal entity with the requirements established by federal laws and other regulatory acts of the Russian Federation adopted in accordance with them. The subject of the audit is the implementation of the regulation of the state control supervision authority 357517rp54 dated 21/122018


# 662101318356
Unscheduled inspection
Start date: 2021-11-18, end date: —, duration:
Authority:
Purpose of inspection:


# 662100775721
Unscheduled inspection
Start date: 2021-09-22, end date: 2021-10-05, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations; Tasks - the implementation of regional state construction supervision; Subject - the implementation of a previously issued instruction on the elimination of an identified violation of mandatory requirements


# 562100439387
Unscheduled inspection
Start date: 2021-08-12, end date: —, duration: 7
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of a notification received on the elimination of violations as prescribed on 30.06.2021; - the objectives of this audit are: to identify and prevent violations of the legislation on urban planning and project documentation committed by the developer, including the requirements for equipping the capital construction facility with metering devices for used energy resources. compliance of the work and construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with the requirements of Articles 3 and 3.1 52 of the Urban Planning Code of the Russian Federation, elimination of violations identified in the process of carrying out construction control and state construction supervision, registration and submission of executive documentation.


# 662100349040
Unscheduled inspection
Start date: 2021-07-12, end date: 2021-08-06, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations; Tasks - the implementation of regional state construction supervision; Subject - the implementation of a previously issued instruction on the elimination of an identified violation of mandatory requirements


# 662100349013
Unscheduled inspection
Start date: 2021-07-26, end date: 2021-08-06, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations; Tasks - the implementation of regional state construction supervision; Subject - the implementation of a previously issued instruction on the elimination of an identified violation of mandatory requirements


# 562100323940
Unscheduled inspection
Start date: 2021-06-30, end date: —, duration: 4
Authority: Gosudarstvennaya inspekciya truda v Orenburgskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms (10001244260)


# 562100133680
Unscheduled inspection
Start date: 2021-04-16, end date: 2021-05-13, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Orenburgskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms, Written request of a citizen No.56/7-2646-21- ABOUT from 30.03.2021


# 662100100655
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-30, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: In order to verify compliance with the requirements of Regulation No. 29-13-28/1 dated 02/05/2021 issued by JSC Vector Design and Construction Company, the objective of this audit is to carry out regional state construction supervision. 7. The subject of this audit is: the fulfillment of the previously issued instruction on the elimination of identified violations of mandatory requirements dated 02/05/2021 No. 29-13-28/1, issued by JSC Vector Design and Construction Company


# 662100075786
Unscheduled inspection
Start date: 2021-03-22, end date: 2021-04-02, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations; Tasks - the implementation of regional state construction supervision; Subject - the implementation of a previously issued instruction on the elimination of an identified violation of mandatory requirements


# 662105311977
Unscheduled inspection
Start date: 2021-02-01, end date: 2021-02-12, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations; Tasks - the implementation of regional state construction supervision; Subject - the implementation of a previously issued instruction on the elimination of an identified violation of mandatory requirements


# 662105312300
Unscheduled inspection
Start date: 2021-02-01, end date: —, duration:
Authority:
Purpose of inspection:


# 562004458755
Unscheduled inspection
Start date: 2020-07-27, end date: 2020-07-29, duration: 3
Authority: Gosudarstvennaya inspekciya truda v Orenburgskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms 10001244260


# 562004454608
Unscheduled inspection
Start date: 2020-07-13, end date: 2020-07-17, duration: 5
Authority: Gosudarstvennaya inspekciya truda v Orenburgskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms identifier of the state function 10001244260


# 562004409382
Unscheduled inspection
Start date: 2020-05-20, end date: 2020-05-28, duration:
Authority: Gosudarstvennaya inspekciya truda v Orenburgskoi oblasti
Purpose of inspection: implementation


# 562004328475
Unscheduled inspection
Start date: 2020-03-19, end date: —, duration:
Authority:
Purpose of inspection:


# 562004359378
Unscheduled inspection
Start date: 2020-03-12, end date: 2020-03-31, duration:
Authority: Gosudarstvennaya inspekciya truda v Orenburgskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms


# 562004299024
Unscheduled inspection
Start date: 2020-02-21, end date: 2020-02-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of a notification received on the elimination of violations during the construction of a capital construction facility and an inspection program. The objectives of this inspection are to identify and prevent violations of urban planning legislation by the developer, including technical regulations, other regulatory legal acts and project documentation, including the requirements for equipping the capital construction facility with metering devices for energy resources used. works and construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and to the requirements for equipping the capital construction facility with metering devices for energy resources used, meeting the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code. of the Civil Code of the Russian Federation specified in part 11 of Article 54 of the Urban Planning Code of the Russian Federation are verification of compliance of the parameters of capital construction facilities with the maximum parameters of permitted construction and reconstruction of capital construction facilities established by the rules of land use and development documentation on the layout of the territory and mandatory requirements for the parameters of capital construction facilities established by the Urban Planning Code of the Russian Federation and other federal laws if for construction or reconstruction The capital construction facility does not require a construction permit.


# 562004197296
Unscheduled inspection
Start date: 2020-01-17, end date: —, duration:
Authority:
Purpose of inspection:


# 561904114861
Unscheduled inspection
Start date: 2019-12-18, end date: 2019-12-20, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision in accordance with the program of inspections of the capital construction facility approved on 03/12/2017. The objectives of this audit are to identify and prevent violations of urban planning legislation by the developer, including technical regulations, other regulatory legal acts and project documentation, including the requirements for equipping the capital construction facility with metering devices for used energy resources subject to regional state construction supervision in with respect to capital construction facilities specified in part 1 of Article 54 of the Urban Planning Code of the Russian Federation, it is necessary to verify the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the equipment requirements of the facility capital construction accounting devices for used energy resources, the availability of a construction permit, the fulfillment of the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation, ensuring accessibility for disabled people of social engineering and transport infrastructure facilities, in accordance with regional state construction supervision in respect of facilities specified in part 11 of Article 54


# 661903065708
Unscheduled inspection
Start date: 2019-08-30, end date: 2019-09-06, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291307268 P dated June 27, 2019. The objectives of this audit are to carry out regional state construction supervision. The purpose of this audit is to comply with the previously issued order to eliminate the identified violation of mandatory requirements 291307268 P dated June 27, 2019.


# 77190803425577
Unscheduled inspection
Start date: 2019-05-29, end date: 2019-06-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803331422
Unscheduled inspection
Start date: 2019-02-11, end date: —, duration:
Authority:
Purpose of inspection:


# 001902681613
Unscheduled inspection
Start date: 2019-02-25, end date: 2019-03-01, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control over the implementation of regulation 357517rp54 dated 21/122018, the deadline for which expired on 01022019. The objectives of this audit are to assess the compliance of activities or actions omissions carried out by a legal entity with the requirements established by federal laws and other regulatory acts of the Russian Federation adopted in accordance with them. The subject of the audit is the implementation of the regulation of the state control supervision authority 357517rp54 dated 21/122018


# 561902450551
Unscheduled inspection
Start date: 2019-02-04, end date: 2019-02-15, duration:
Authority: Gosudarstvennaya inspekciya truda v Orenburgskoi oblasti
Purpose of inspection: Federal State supervision of compliance with labor legislation and other regulatory legal acts containing labor law norms


# 001802678315
Unscheduled inspection
Start date: 2018-12-10, end date: 2018-12-21, duration:
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to implement Rostechnadzor Order No. 85 dated March 15, 2017 "On inspections of organizations operating tower cranes" based on the instruction of Deputy Prime Minister of the Russian Federation AG Khloponin dated February 8, 2017 AHP9682 "On the organization and conduct of unscheduled inspections of organizations operating tower cranes from 2017 to 2019" the objectives of this audit are to prevent identify and suppression of violations of mandatory requirements established by federal laws and other regulatory acts of the Russian Federation in the field of industrial safety and technical regulation of mandatory requirements taking measures to eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have committed violations of the requirements of federal laws and other regulatory legal acts


# 77180803258083
Unscheduled inspection
Start date: 2018-10-22, end date: 2018-11-02, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803174584
Unscheduled inspection
Start date: 2018-07-30, end date: —, duration:
Authority:
Purpose of inspection:


# 561800500357
Unscheduled inspection
Start date: 2018-06-26, end date: 2018-06-29, duration:
Authority: Gosudarstvennaya inspekciya truda v Orenburgskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms


# 77180803115727
Unscheduled inspection
Start date: 2018-04-09, end date: 2018-04-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802915363
Unscheduled inspection
Start date: 2017-12-06, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77170701585158
Unscheduled inspection
Start date: 2017-05-03, end date: 2017-06-01, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 74170701609814
Unscheduled inspection
Start date: 2017-05-22, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 74170701536042
Unscheduled inspection
Start date: 2017-04-18, end date: 2017-04-24, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the facade system with full readiness and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 st52 Urban Planning Code of the Russian Federation


# 77170701453733
Unscheduled inspection
Start date: 2017-03-13, end date: —, duration:
Authority:
Purpose of inspection:


# 74170701408916
Unscheduled inspection
Start date: 2017-02-28, end date: 2017-03-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the roof installation and waterproofing works with full readiness and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74170701346557
Unscheduled inspection
Start date: 2017-02-03, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701343647
Unscheduled inspection
Start date: 2017-01-30, end date: —, duration:
Authority:
Purpose of inspection:


# 77160701266056
Unscheduled inspection
Start date: 2016-12-23, end date: 2016-12-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77160701101896
Unscheduled inspection
Start date: 2016-11-08, end date: 2016-11-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 74160701095994
Unscheduled inspection
Start date: 2016-11-21, end date: 2016-11-25, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the work on the installation of load-bearing structures of the 14th floor to the overlap of the 15th floor and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The availability of a construction permit3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701047543
Unscheduled inspection
Start date: 2016-10-31, end date: 2016-11-04, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work with the installation of translucent structures in block section 12 prior to the installation of slopes and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the receipt of a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160700892179
Unscheduled inspection
Start date: 2016-10-05, end date: —, duration:
Authority:
Purpose of inspection:


# 74160700869931
Unscheduled inspection
Start date: 2016-09-29, end date: 2016-10-06, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the roof installation work in full and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the receipt of a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.