Found 1 inspection:

# 261802370907
Unscheduled inspection
Start date: 2018-12-26, end date: 2019-01-30, duration:
Authority: Upravlenie Stavropolskogo kraya gosudarstvennaya zhilischnaya inspekciya
Purpose of inspection: This inspection is conducted for the purpose of notification 28 dated 17/122018 of the individual entrepreneur Gordienko TV on the completion of construction stage 4 according to the inspection program 09082018 dated 05092018 The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development by the developer technical customer person carrying out construction, including technical regulations and project documentation The subject of this inspection is compliance with the procedure for construction monitoring the maintenance of general and or special logs of works of executive documentation drawing up certificates of inspection of structures of sections of engineering and technical support networks compliance with other requirements when performing work established by the design documentation, including requirements for energy efficiency and requirements for equipping a capital construction facility with metering devices for used energy resources compliance with mandatory requirements and or requirements established by municipal legal acts


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.