# 00170803016446
Unscheduled inspection
Start date: 2017-12-21, end date: 2017-12-28, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the fulfillment by SinaraDevelopment JSC of the previously issued instruction dated 21112017 Sv5588rP62. The purpose of this audit is to take measures to control the elimination of violations specified in the previously issued instruction dated 21112017 Sv5588rP.
# 00170802788382
Unscheduled inspection
Start date: 2017-10-31, end date: —, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00170801928624
Unscheduled inspection
Start date: 2017-08-29, end date: 2017-09-19, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the fulfillment by SinaraDevelopment JSC of the previously issued regulations from 17072017 SV2824RP1 and n 1 of the regulations from 26122016 SV6711RPTHE purpose of this audit is to implement measures to control the elimination of violations specified in the previously issued regulations from 17072017 Sv2824rP1 and n 1 of the regulations from 26122016 SV6711RPTHE purpose of this audit is to comply with the regulations of the state control and supervision authorities
# 662201524601
Unscheduled inspection
Start date: 2022-01-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662101395072
Unscheduled inspection
Start date: 2021-12-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662101476950
Unscheduled inspection
Start date: 2021-12-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662101278367
Unscheduled inspection
Start date: 2021-11-10, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 662101409027
Unscheduled inspection
Start date: 2021-11-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662101378603
Unscheduled inspection
Start date: 2021-11-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662101277401
Unscheduled inspection
Start date: 2021-11-08, end date: 2021-12-03, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to implement the inspection program No. 29-16-17/342-20-1 dated 11.11.2020, the purpose of this inspection is to carry out regional state construction supervision.
7. The subject of this audit is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility "Residential section with built-in public facilities (No. C1 according to ROM) and an above-ground parking lot (in axes 12'-28'/A'-E'; 1'-12'/M'-E') – 1st stage of construction; residential section with built-in public facilities (No. C2 according to ROM) and an above-ground parking lot (in axes 1/2'-12'/A'-D) – 2nd stage of construction", located at: Yekaterinburg, Danila Zvereva St., 11, as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model
(in the case of if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code
Of the Russian Federation), including energy efficiency requirements
(with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code
Of the Russian Federation.
# 662101315234
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 662101176043
Unscheduled inspection
Start date: 2021-10-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662101262454
Unscheduled inspection
Start date: 2021-10-06, end date: 2021-10-19, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to verify compliance with the requirements of Regulation No. 29-16-29/591.1 dated 08/27/2021 issued by Sinara-Development JSC, the purpose of this inspection is to carry out regional state construction supervision. The subject of this audit is: the fulfillment of the previously issued instruction on the elimination of identified violations of mandatory requirements dated 08/27/2021 No. 29-16-29/591.1, issued by Sinara-Development JSC.
# 662101050377
Unscheduled inspection
Start date: 2021-10-04, end date: 2021-10-15, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to verify compliance with the requirements of Regulation No. 29-17-29/390 dated 07/29/2021 issued by Sinara-Development JSC. The purpose of this inspection is to carry out regional state construction supervision.The subject of this audit is: the fulfillment of the previously issued instruction on the elimination of identified violations of mandatory requirements dated 07/29/2021 No. 29-17-29/390 issued by Sinara-Development JSC.
# 662101212777
Unscheduled inspection
Start date: 2021-10-20, end date: 2021-11-09, duration: 13
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to implement the inspection program No. 29-16-17/363-20 dated 11/30/2020, the purpose of this inspection is to carry out regional state construction supervision. The subject of this audit is: verification of the conformity of the work performed and the building materials used during the construction of the capital construction facility "Three multi-storey residential sections with built–in public facilities (No. 1-3 according to ROM) and an underground technical corridor (in the W-L axes) of an eleven-section residential building - 1st stage of construction; eight multi-storey residential sections with built–in public premises (No. 4-11 according to ROM) of an eleven-section residential building - 2nd stage of construction", located at Yekaterinburg, as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction projects for which energy efficiency requirements they do not apply) and the requirements for equipping the capital construction facility with metering devices for used energy resources; the availability of a construction permit; and compliance with the requirements established by parts 2, 3, and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 662101207926
Unscheduled inspection
Start date: 2021-10-19, end date: 2021-10-26, duration: 6
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to verify compliance with the requirements of Regulation No. 29-17-29/457 dated 09/21/2021 issued by Sinara-Development JSC, the purpose of this inspection is to carry out regional state construction supervision. The subject of this audit is: the fulfillment of the previously issued instruction on the elimination of identified violations of mandatory requirements dated 09/21/2021 No. 29-17-29/457, issued by JSC Sinara-Development.
# 662100706215
Unscheduled inspection
Start date: 2021-09-13, end date: 2021-10-01, duration: 15
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-16-17/342-20-1 dated 2020-11-11; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility.: Residential section with built-in public facilities (No. C1 according to ROM) and above-ground parking (in axes 12'-28'/A'-E'; 1'-12'/M'-E') – 1st stage of construction; residential section with built-in public facilities (No. C2 according to ROM) and an above-ground-underground parking lot (in axes 1/2'-12'/A'-D) – Stage 2 of construction, located at 11 Danila Zvereva St., Yekaterinburg, the results of such work meet the requirements approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation project documentation, including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; and compliance with the requirements established by parts 2, 3, and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 662100657952
Unscheduled inspection
Start date: 2021-09-13, end date: 2021-10-08, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-16-17/363-20 dated 2020-11-30; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility.: Three multi-storey residential sections with built–in public facilities (No. 1-3 according to ROM) and an underground technical corridor (in the W–L axes) of an eleven-section residential building - 1st stage of construction; eight multi-storey residential sections with built-in public facilities (No. 4-11 according to ROM) of an eleven-section residential building - 2nd stage of construction, located at the address: Yekaterinburg, the results of such work meet the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with energy metering devices resources; availability of a building permit; compliance with the requirements set out in parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 662100445220
Unscheduled inspection
Start date: 2021-08-17, end date: 2021-08-30, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations; Tasks - the implementation of regional state construction supervision; Subject - the implementation of a previously issued instruction on the elimination of an identified violation of mandatory requirements
# 662100388676
Unscheduled inspection
Start date: 2021-08-02, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 662100340214
Unscheduled inspection
Start date: 2021-07-12, end date: 2021-07-23, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations; Tasks - the implementation of regional state construction supervision; Subject - the implementation of a previously issued instruction on the elimination of an identified violation of mandatory requirements
# 662100359556
Unscheduled inspection
Start date: 2021-07-22, end date: 2021-08-18, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-16-17/342-20-1 dated 2020-11-11; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility.: Residential section with built-in public facilities (No. C1 according to ROM) and above-ground parking (in axes 12'-28'/A'-E'; 1'-12'/M'-E') – 1st stage of construction; residential section with built-in public facilities (No. C2 according to ROM) and an above-ground-underground parking lot (in axes 1/2'-12'/A'-D) – Stage 2 of construction, located at 11 Danila Zvereva St., Yekaterinburg, the results of such work meet the requirements approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation project documentation, including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; and compliance with the requirements established by parts 2, 3, and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 662100295931
Unscheduled inspection
Start date: 2021-07-01, end date: 2021-07-14, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations; Tasks - the implementation of regional state construction supervision; Subject - the implementation of a previously issued instruction on the elimination of an identified violation of mandatory requirements
# 662100332088
Unscheduled inspection
Start date: 2021-07-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662100179844
Unscheduled inspection
Start date: 2021-05-18, end date: 2021-05-31, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to verify compliance with the requirements of Regulation No. 29-16-29/201.1 dated 04/09/2021, issued by
JSC Sinara-Development, the purpose of this audit is to carry out regional state construction supervision.
7. The subject of this audit is: the fulfillment of the previously issued instruction on the elimination of identified violations of mandatory requirements
dated 04/09/2021 No. 29-16-29/201.1, issued by Sinara-Development JSC.
# 662100190601
Unscheduled inspection
Start date: 2021-05-20, end date: 2021-05-31, duration: 12
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations; Tasks - the implementation of regional state construction supervision; Subject - the implementation of a previously issued instruction on the elimination of an identified violation of mandatory requirements
# 662100108142
Unscheduled inspection
Start date: 2021-04-12, end date: 2021-05-11, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-16-17/387-20 dated 2020-12-18; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility.: A single-section multi-storey residential building with built-in public facilities on the ground floor and an integrated underground parking lot (No. 1 according to ROM), located at 57 Amundsen Street, bldg. A, Yekaterinburg, the results of such work meet the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code Of the Russian Federation project documentation, including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 662100172999
Unscheduled inspection
Start date: 2021-04-28, end date: 2021-05-27, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-16-17/363-20 dated 2020-11-30; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility.: Three multi-storey residential sections with built–in public facilities (No. 1-3 according to ROM) and an underground technical corridor (in the W–L axes) of an eleven-section residential building - 1st stage of construction; eight multi-storey residential sections with built-in public facilities (No. 4-11 according to ROM) of an eleven-section residential building - 2nd stage of construction, located at the address: Yekaterinburg, the results of such work meet the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with energy metering devices resources; availability of a building permit; compliance with the requirements set out in parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 662100138790
Unscheduled inspection
Start date: 2021-04-26, end date: 2021-05-11, duration: 16
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to verify compliance with the requirements of Regulation No. 29-16-29/135 dated 03/16/2021, issued by
JSC Sinara-Development, the purpose of this audit is to carry out regional state construction supervision.
7. The subject of this audit is: the fulfillment of the previously issued instruction on the elimination of identified violations of mandatory requirements
dated 03/16/2021 No. 29-16-29/135, issued by JSC Sinara-Development.
# 662100053091
Unscheduled inspection
Start date: 2021-03-15, end date: 2021-04-09, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to implement the inspection program No. 29-16-17/342-20-1 dated 11.11.2020, the purpose of this inspection is to carry out regional state construction supervision.
7. The subject of this audit is: verification of the conformity of the work performed and the building materials used during the construction of the capital construction facility "Residential section with built-in public facilities (No. C1 according to ROM)
and an above-ground parking lot (in axes 11'-28'/A'-E'; 1'-10'/N'-E') – 1st stage of construction; residential section with built-in public facilities (No. C2 according to ROM) and an above-ground parking lot (in axes 1'-13'/A'-D) – 2nd stage of construction", located at: Yekaterinburg, Danila Zvereva St., 11, as well as the results of such work to the requirements of the project documentation approved
in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made
to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (in the case of if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements
(with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for the energy resources used; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code
Of the Russian Federation.
# 662105315213
Unscheduled inspection
Start date: 2021-02-01, end date: 2021-02-12, duration: 12
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations; Tasks - the implementation of regional state construction supervision; Subject - the implementation of a previously issued instruction on the elimination of an identified violation of mandatory requirements
# 662005224391
Unscheduled inspection
Start date: 2020-11-12, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 662004486417
Unscheduled inspection
Start date: 2020-08-14, end date: 2020-09-10, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program is to carry out regional state construction supervision. The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility. Multi-storey two-section residential building 1 on ROM with built-in non-residential public premises on the ground floor of a roof-mounted gas boiler room. built-in underground parking 2 on ROM GRPS 5 on ROM instead of demolished facilities located on Danila Zvereva Bekhtereva St., Yekaterinburg, Sverdlovsk Region, the results of such work, the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used. building permits comply with the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 662004427723
Unscheduled inspection
Start date: 2020-06-11, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 662004319486
Unscheduled inspection
Start date: 2020-03-02, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 662004330814
Unscheduled inspection
Start date: 2020-03-16, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 662004362942
Unscheduled inspection
Start date: 2020-03-18, end date: 2020-03-31, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to monitor the implementation of a previously issued instruction on the elimination of identified violations Tasks are the implementation of regional state construction supervision Subject to the implementation of a previously issued instruction on the elimination of identified violations of mandatory requirements dated 02122019 2916071043P1
# 662004342224
Unscheduled inspection
Start date: 2020-03-12, end date: 2020-04-08, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose of the inspection program 2916.0142019 dated 2019/1205 Tasks implementation of regional state construction supervision Subject is to verify the compliance of the work and applicable building materials during the construction of a capital construction facility Five residential sections 913 according to the ROM of a 13-section residential building of variable storeys stage 2 construction located at Yekaterinburg the results of such work with the requirements approved in accordance with parts 15 152 and 153 article 48 of the Urban Planning Code of the Russian Federation, project documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and the requirements for equipping a capital construction facility with metering devices for used energy resources, the availability of a construction permit, and compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 662004296483
Unscheduled inspection
Start date: 2020-02-20, end date: 2020-03-20, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Based on the notice of completion of the capital construction facility bx 5344 dated 06022020, in accordance with the inspection program, subparagraph "a" of paragraph 2 of Part 5 of Article 54 of the Urban Planning Code of the Russian Federation, the task of this inspection is to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of the work and the construction materials used during the construction of the capital construction facility "Eight residential sections 18 on ROM 13 of a multi-storey residential building with built-in non-residential premises on the 1st floor of the 1st stage of construction" as well as the results of such work according to the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 article 49 of the Urban Planning Code of the Russian Federation and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used. construction of meeting the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661904075536
Unscheduled inspection
Start date: 2019-12-10, end date: 2020-01-14, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out on the basis of the notice of completion of the capital construction facility BX 54772 dated 26112019 in accordance with the inspection program, subparagraph "a" of paragraph 2 of Part 5 of Article 54 of the Urban Planning Code of the Russian Federation, the objectives of this inspection are to carry out regional state construction supervision.6 The subject of this inspection is to verify the compliance of the work and the construction materials used during construction the capital construction facility "Two residential sections 15-16 according to ROM stage 3 construction" located at Yekaterinburg, Yekaterininskaya Khrustalnogorskaya St., as well as the results of such work approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation of the project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for used energy resources and the availability of a construction permit meeting the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661903905009
Unscheduled inspection
Start date: 2019-11-01, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661903942429
Unscheduled inspection
Start date: 2019-11-06, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661903966964
Unscheduled inspection
Start date: 2019-11-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661903967051
Unscheduled inspection
Start date: 2019-11-13, end date: 2019-11-26, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The audit is conducted in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607300P1 dated April 24, 2019. The objectives of this audit are to carry out regional state construction supervision. The purpose of this audit is to comply with the previously issued instruction on the elimination of identified violations of mandatory requirements 291607300P1 dated April 24, 2019.
# 661903866643
Unscheduled inspection
Start date: 2019-10-21, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661903797832
Unscheduled inspection
Start date: 2019-10-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661903905007
Unscheduled inspection
Start date: 2019-10-30, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661903608517
Unscheduled inspection
Start date: 2019-09-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661903661000
Unscheduled inspection
Start date: 2019-09-27, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Objectives monitoring the implementation of the previously issued order to eliminate the identified violation of mandatory requirements dated August 16, 2019 291307193 Tasks implementation of the regional state construction supervision Plan implementation of the previously issued order to eliminate the identified violation of mandatory requirements dated August 16, 2019 291307193 P
# 661903192264
Unscheduled inspection
Start date: 2019-09-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902926832
Unscheduled inspection
Start date: 2019-08-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902916259
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-30, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose verification of the completed capital construction facility tasks implementation of the regional state construction supervision project verification of the compliance of the work and the construction materials used in the construction of the capital construction facility with the results of such work with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of Parts 2 to 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661902916242
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-30, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose verification of the completed capital construction facility tasks implementation of the regional state construction supervision project verification of the compliance of the work and the construction materials used in the construction of the capital construction facility with the results of such work with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of Parts 2 to 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661902909381
Unscheduled inspection
Start date: 2019-07-30, end date: 2019-08-16, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Objectives verification of the arguments of the appeal dated 19072019 290101178901tasks implementation of the regional state construction supervision of the project verification of compliance of the work and applicable building materials during the construction of a capital construction facility with the requirements of the project documentation
# 661902873055
Unscheduled inspection
Start date: 2019-07-12, end date: 2019-08-07, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the inspection program 29160125618 dated July 02, 2018. The objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of work performed and building materials used in the construction of the capital construction facility "13-section residential building of variable storeys 1st stage of construction four residential sections 14 according to the ROM of a 13-section residential building of variable storeys with built-in non-residential premises on the 1st floor, stage 2 of construction of nine residential sections 513 according to the ROM of a 13-section residential building of variable storeys" located at Yekaterinburg, the results of such work meet the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 Articles 52 of the Urban Planning Code of the Russian Federation
# 661902867554
Unscheduled inspection
Start date: 2019-07-11, end date: 2019-08-07, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the inspection program 29160148218 dated November 14, 2018. The objectives of this inspection are to carry out regional state construction supervision. The purpose of this inspection is to verify the compliance of work performed and building materials used in the construction of the capital construction facility "Single-section residential building with variable storeys with built-in public facilities on the ground floor and a single-level built-in underground parking 1 on ROM" located at 99a Lenin Ave., Yekaterinburg, Sverdlovsk region, of the results of such work, including the requirements for energy efficiency, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of Parts 2 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation
# 661902867472
Unscheduled inspection
Start date: 2019-07-15, end date: 2019-07-26, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The audit is conducted in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607327P dated April 29, 2019. The objectives of this audit are to carry out regional state construction supervision. The purpose of this audit is to comply with the previously issued instruction on the elimination of identified violations of mandatory requirements 291607327P dated April 29, 2019
# 661902816247
Unscheduled inspection
Start date: 2019-07-01, end date: 2019-07-26, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program 29160113218 dated April 18, 2018. The objectives of this inspection are to carry out regional state construction supervision. 7 The subject of this inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Two residential sections 15-16 according to ROM stage 3 construction" located at Yekaterinburg Street Yekaterininskaya Khrustalnogorskaya of the results of such work meets the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply, and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661902816248
Unscheduled inspection
Start date: 2019-06-25, end date: 2019-07-08, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607112P1 dated March 25, 2019. The objectives of this audit are to carry out regional state construction supervision. The purpose of this audit is to comply with the previously issued instruction on the elimination of identified violations of mandatory requirements 291607112P1 dated March 25, 2019.
# 661902715329
Unscheduled inspection
Start date: 2019-05-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902720900
Unscheduled inspection
Start date: 2019-05-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902731200
Unscheduled inspection
Start date: 2019-05-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902616694
Unscheduled inspection
Start date: 2019-04-16, end date: 2019-04-29, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The audit is conducted in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 29160727P1 dated February 12, 2019. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 29160727P1 dated February 12, 2019.
# 661902605763
Unscheduled inspection
Start date: 2019-04-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902605751
Unscheduled inspection
Start date: 2019-04-01, end date: 2019-04-26, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: the purpose is to implement the inspection program the task is to carry out regional state construction supervision the subject is to verify the compliance of the work and applicable building materials during the construction of a capital construction facility
# 661902576729
Unscheduled inspection
Start date: 2019-03-18, end date: 2019-03-29, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program dated November 14, 2018 29160148218 The task is to carry out regional state construction supervision The subject of the inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Single-section residential building with variable storeys with built-in public facilities on the ground floor and a single-level built-in underground parking 1 on ROM" located in the Sverdlovsk region Yekaterinburg Lenin Avenue 99a the results of such work meet the requirements of technical regulations sanitary and epidemiological rules and regulations safety rules and state standards of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 661902571493
Unscheduled inspection
Start date: 2019-03-18, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661902606495
Unscheduled inspection
Start date: 2019-03-28, end date: 2019-04-24, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the inspection program 29160125618 dated July 02, 2018. The objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of work performed and building materials used in the construction of the capital construction facility "13-section residential building of variable storeys 1st stage of construction four residential sections 14 according to the ROM of a 13-section residential building of variable storeys with built-in non-residential premises on the 1st floor, stage 2 of construction of nine residential sections 513 according to the ROM of a 13-section residential building of variable storeys" located at Yekaterinburg, the results of such work meet the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 Articles 52 of the Urban Planning Code of the Russian Federation
# 661902482561
Unscheduled inspection
Start date: 2019-02-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902482542
Unscheduled inspection
Start date: 2019-02-18, end date: 2019-03-01, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607782P1 dated November 20, 2018. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607782P1 dated November 20, 2018.
# 661902529249
Unscheduled inspection
Start date: 2019-02-25, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661902529182
Unscheduled inspection
Start date: 2019-02-25, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661902482539
Unscheduled inspection
Start date: 2019-02-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902435991
Unscheduled inspection
Start date: 2019-01-18, end date: 2019-01-31, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: the purpose is to implement the inspection program the task is to carry out regional state construction supervision the subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility
# 661902435983
Unscheduled inspection
Start date: 2019-01-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902432643
Unscheduled inspection
Start date: 2019-01-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661802128212
Unscheduled inspection
Start date: 2018-11-20, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661802150369
Unscheduled inspection
Start date: 2018-11-26, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661802128357
Unscheduled inspection
Start date: 2018-11-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661801855923
Unscheduled inspection
Start date: 2018-10-24, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661801855921
Unscheduled inspection
Start date: 2018-10-24, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661801911588
Unscheduled inspection
Start date: 2018-10-09, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661801937668
Unscheduled inspection
Start date: 2018-10-15, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661801928618
Unscheduled inspection
Start date: 2018-10-15, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661801377626
Unscheduled inspection
Start date: 2018-09-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661801585432
Unscheduled inspection
Start date: 2018-09-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661801584541
Unscheduled inspection
Start date: 2018-09-20, end date: 2018-10-12, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: the purpose is to implement the inspection program the task is to carry out regional state construction supervision the subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility
# 661800677717
Unscheduled inspection
Start date: 2018-08-28, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661800504917
Unscheduled inspection
Start date: 2018-07-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661800505087
Unscheduled inspection
Start date: 2018-07-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661800472994
Unscheduled inspection
Start date: 2018-06-20, end date: 2018-06-27, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this audit is being conducted in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607170P1 dated April 06, 2018. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291607170P1 dated April 06, 2018.
# 661800346086
Unscheduled inspection
Start date: 2018-05-07, end date: 2018-05-25, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: the purpose is to implement the inspection program the task is to carry out regional state construction supervision the subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility
# 661800346078
Unscheduled inspection
Start date: 2018-05-07, end date: 2018-05-25, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: the purpose is to implement the inspection program the task is to carry out regional state construction supervision the subject is to verify the compliance of the work and applicable building materials during the construction of a capital construction facility
# 661800383299
Unscheduled inspection
Start date: 2018-05-21, end date: 2018-06-01, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The audit is conducted in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 29160742P1 dated February 19, 2018. The objectives of this audit are the implementation of regional state construction supervision. The subject of this audit is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 29160742P1 dated February 19, 2018.
# 661800302001
Unscheduled inspection
Start date: 2018-04-17, end date: 2018-05-17, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: based on the notice of completion of the construction of the capital construction facility bx dated 12042018 29018215381, in accordance with the inspection program, subparagraph "a" of paragraph 2, subparagraph "a" of paragraph 3 of Part 5 of Article 54 of the Urban Planning Code of the Russian Federation, the objectives of this inspection are to carry out regional state construction supervision. The subject of this inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "11-section residential building of variable storeys with 31 built-in rooms according to ROM" located at the address Sverdlovsk region Yekaterinburg Chkalovsky ph corridor of high-voltage linesproliferation of Novosibirsk Street projected section of the Yekaterinburg ring highway Residential area Solnechny 3 quarter Residential block 31 the results of such work meet the requirements of technical regulations of project documentation, including energy efficiency requirements and the requirements of equipping the capital construction facility with metering devices for the energy resources used , as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661800250633
Unscheduled inspection
Start date: 2018-04-09, end date: 2018-05-08, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this audit is being conducted in order to implement the inspection program 29160123417 dated July 31, 2017. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Multi-storey Residential Building 1 on ROM" located at Yekaterinburg Transitional Lane d 6 the results of such work meet the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661800177961
Unscheduled inspection
Start date: 2018-03-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661800191216
Unscheduled inspection
Start date: 2018-03-13, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661800231725
Unscheduled inspection
Start date: 2018-03-26, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 661800071203
Unscheduled inspection
Start date: 2018-02-13, end date: 2018-02-26, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this audit is being conducted in order to monitor the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291605980P1 dated December 15, 2017. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued instruction on the elimination of identified violations of mandatory requirements 291605980P1 dated December 15, 2017