# 722101387790
Unscheduled inspection
Start date: 2021-11-29, end date: —, duration: 10
Authority: Glavnoe upravlenie stroitelstva Tyumenskoi oblasti
Purpose of inspection: This check is carried out for the purpose of: checking the elimination of violations according to the order dated 04.10.2021 No. 1347 on the basis of the notice on the elimination of violations during construction, reconstruction of the capital construction facility dated 11/23/2021.
The objectives of this audit are: prevention, detection and suppression of violations of the legislation on urban development, including technical regulations, and design documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility: "Construction of a kindergarten for 50 places in the village of Evsino, Golyshmanovsky district", located at the address: Tyumen region, Golyshmanovsky city district, village of Evsino, 8 Marta str.
The subject of this audit is: compliance with mandatory requirements; compliance with the instructions of state control (supervision) bodies
# 722100599003
Unscheduled inspection
Start date: 2021-09-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100337970
Unscheduled inspection
Start date: 2021-07-13, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 002100217671
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-03-10, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: verification of the elimination of violations according to the order dated 03/11/2021 No. 299tb, prevention, detection and suppression of violations of the legislation on urban development, including technical regulations, and design documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility: Construction of a school with a preschool department in the village Inderi of the Vagai district, located at:
Tyumen region, Vagaysky district, Inderi village, Yantarnaya str., 32a
Tyumen region, Vagaysky district, Inderi village, Yantarnaya str., 32b
# 002100217648
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-03-10, duration: 20
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection: verification of the elimination of violations according to the order dated 03/11/2021 No. 300tb, prevention, detection and suppression of violations of the legislation on urban development, including technical regulations, and design documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, during the construction of a capital construction facility: Construction of a comprehensive school with pre-school education in the village of Kurya, Vagaysky district, located at:
Tyumen region, Vagaysky district, Kurya village, 3a Shkolnaya str.
Tyumen region, Vagaysky district, Kurya village, 3b Shkolnaya str.
# 662100194550
Unscheduled inspection
Start date: 2021-05-11, end date: 2021-05-14, duration: 4
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations; Tasks - the implementation of regional state construction supervision; Subject - the implementation of a previously issued instruction on the elimination of an identified violation of mandatory requirements
# 662100194561
Unscheduled inspection
Start date: 2021-05-11, end date: 2021-05-14, duration: 4
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of the previously issued instruction on the elimination of identified violations No. 29-15-22/298 dated 11.12.2020; Tasks - implementation of regional state construction supervision; Subject - the implementation of the previously issued instruction on the elimination of the identified violation of mandatory requirements
# 662100194529
Unscheduled inspection
Start date: 2021-05-11, end date: 2021-05-14, duration: 4
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of the previously issued instruction on the elimination of identified violations No. 29-15-22/292 dated 11.12.2020; Tasks - implementation of regional state construction supervision; Subject - the implementation of the previously issued instruction on the elimination of the identified violation of mandatory requirements
# 662100194535
Unscheduled inspection
Start date: 2021-05-11, end date: 2021-05-14, duration: 4
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of the previously issued instruction on the elimination of identified violations No. 29-15-22/293 dated 11.12.2020; Tasks - implementation of regional state construction supervision; Subject - the implementation of the previously issued instruction on the elimination of the identified violation of mandatory requirements
# 662100194542
Unscheduled inspection
Start date: 2021-05-11, end date: 2021-05-14, duration: 4
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of the previously issued instruction on the elimination of identified violations No. 29-15-22/294 dated 11.12.2020; Tasks - implementation of regional state construction supervision; Subject - the implementation of the previously issued instruction on the elimination of the identified violation of mandatory requirements
# 662100194299
Unscheduled inspection
Start date: 2021-05-11, end date: 2021-05-14, duration: 4
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of the previously issued instruction on the elimination of identified violations from No. 29-15-22/291 dated 11.12.2020; Tasks - implementation of regional state construction supervision; Subject - the implementation of the previously issued instruction on the elimination of the identified violation of mandatory requirements
# 662100194136
Unscheduled inspection
Start date: 2021-05-11, end date: 2021-05-14, duration: 4
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of the previously issued instruction on the elimination of identified violations No. 29-15-22/290 dated 11.12.2020; Tasks - implementation of regional state construction supervision; Subject - the implementation of the previously issued instruction on the elimination of the identified violation of mandatory requirements
# 742100160822
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-05-18, duration: 20
Authority: Gosudarstvennaya inspekciya truda v CHelyabinskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms in connection with the received notification No. 74/6-78-21- FROM 04/12/2021.
# 742100006724
Unscheduled inspection
Start date: 2021-03-03, end date: 2021-03-10, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of metal structures of the canopy, installation of metal structures of the floor frame of the production area, installation of reinforced concrete slabs and monolithic sections during the work, installation of sandwich panels during the work and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code of the project documentation (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), in including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742005239167
Unscheduled inspection
Start date: 2020-12-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004465366
Unscheduled inspection
Start date: 2020-08-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 722004460377
Unscheduled inspection
Start date: 2020-07-22, end date: —, duration: —
Authority: Upravlenie gosudarstvennogo stroitelnogo nadzora po Tyumenskoi oblasti Glavnogo upravleniya stroitelstva Tyumenskoi oblasti
Purpose of inspection:
# 741903922851
Unscheduled inspection
Start date: 2019-11-07, end date: 2019-11-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of foundations in the axes "0107 AC" during the execution and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the Code of Design Documentation approved in accordance with Parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account changes made to the design documentation in accordance with in parts 38 and 39 of Article 49 of the Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used 2 The availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902466180
Unscheduled inspection
Start date: 2019-01-30, end date: 2019-02-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of metal frame structures in axes 1325AL1 of enclosing structures of walls window blocks and building materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902466143
Unscheduled inspection
Start date: 2019-01-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902466083
Unscheduled inspection
Start date: 2019-01-30, end date: 2019-02-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on electrical installation, ventilation, air conditioning, fire protection system, compliance with fire and sanitary epidemiological measures, measures to ensure access for low-mobility groups of the population landscaping installation of curbs, roads and sidewalks, and construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Implementation requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802074270
Unscheduled inspection
Start date: 2018-11-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741802074189
Unscheduled inspection
Start date: 2018-11-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741802011961
Unscheduled inspection
Start date: 2018-10-26, end date: 2018-11-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of roof enclosing structures and building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802011837
Unscheduled inspection
Start date: 2018-10-26, end date: 2018-11-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of metal structures of the frame in the axes 113AL1 and the construction materials used in the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802011906
Unscheduled inspection
Start date: 2018-10-26, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741800553047
Unscheduled inspection
Start date: 2018-07-19, end date: 2018-07-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of monolithic grillings and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800553036
Unscheduled inspection
Start date: 2018-07-19, end date: 2018-07-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of monolithic grillings and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800553111
Unscheduled inspection
Start date: 2018-07-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800565633
Unscheduled inspection
Start date: 2018-07-23, end date: 2018-07-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of girder farms and construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of draft documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800367910
Unscheduled inspection
Start date: 2018-05-18, end date: 2018-05-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of compliance with the regulation from 30032018 with a deadline of up to 30042018 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800367380
Unscheduled inspection
Start date: 2018-05-18, end date: 2018-05-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of compliance with the regulation from 30032018 with a deadline of up to 30042018 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800367125
Unscheduled inspection
Start date: 2018-05-18, end date: 2018-05-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of compliance with the regulation from 06042018 with a deadline of up to 30042018 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800236011
Unscheduled inspection
Start date: 2018-04-16, end date: 2018-04-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of metal structures in the axes 1017AI and the construction materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800264340
Unscheduled inspection
Start date: 2018-04-09, end date: 2018-04-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of columns of vertical connections and the construction materials used in the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800264300
Unscheduled inspection
Start date: 2018-04-09, end date: 2018-04-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of columns of vertical connections and the construction materials used in the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800235981
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of metal structures in the 110AA axes and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800220022
Unscheduled inspection
Start date: 2018-03-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800220055
Unscheduled inspection
Start date: 2018-03-26, end date: 2018-03-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of pile foundations and building materials used in the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800220050
Unscheduled inspection
Start date: 2018-03-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170803016342
Unscheduled inspection
Start date: 2017-12-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802758064
Unscheduled inspection
Start date: 2017-10-26, end date: 2017-11-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the actual condition 2The presence of a construction permit 3The fulfillment of the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802741286
Unscheduled inspection
Start date: 2017-10-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802150782
Unscheduled inspection
Start date: 2017-09-11, end date: —, duration: —
Authority: —
Purpose of inspection: