# 742004283212
Unscheduled inspection
Start date: 2020-02-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741904097086
Unscheduled inspection
Start date: 2019-12-23, end date: 2020-01-27, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the facade, finishing works, verification of internal engineering systems, installation of translucent structures, verification of fire-fighting sanitary and epidemiological measures, measures to ensure access for low-mobility groups of the population, landscaping, installation of small architectural forms After completion of work and the construction materials used during construction, reconstruction of a capital construction facility, as well as the results of such work, with the requirements approved in accordance with Parts 15 152 and 153 of Article 48 of this Code of the project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which the requirements energy efficiency does not apply to the requirements for equipping a capital construction facility with metering devices for used energy resources 2 Verification of a completed capital construction facility 3 Availability of a construction permit 4 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741904030238
Unscheduled inspection
Start date: 2019-11-29, end date: 2019-12-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of a monolithic frame, the installation of the outer and inner walls of the second floor, the installation of a monolithic frame, the installation of the outer and inner walls of the roof in operation after completion of the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and equipment requirements capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902992445
Unscheduled inspection
Start date: 2019-09-02, end date: 2019-09-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of a monolithic frame to the device of the external and internal walls of the second floor after completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902978542
Unscheduled inspection
Start date: 2019-08-23, end date: 2019-09-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of a monolithic frame to the device of the exterior and interior walls of the first floor after completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902839793
Unscheduled inspection
Start date: 2019-07-09, end date: 2019-07-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the regulation on the elimination of violations dated 28052019 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902816616
Unscheduled inspection
Start date: 2019-06-26, end date: 2019-07-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the foundation slab after completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902716855
Unscheduled inspection
Start date: 2019-05-22, end date: 2019-05-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the actual condition of the object 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800192658
Unscheduled inspection
Start date: 2018-03-14, end date: 2018-04-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802937041
Unscheduled inspection
Start date: 2017-12-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802752281
Unscheduled inspection
Start date: 2017-10-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802035323
Unscheduled inspection
Start date: 2017-09-14, end date: 2017-09-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the roof installation up to the top covering 1st stage of the facade thermal insulation 1st stage of windows up to the slopes 1st stage of internal engineering systems of external water supply and sanitation networks and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 The Urban Planning Code of the Russian Federation
# 74170701853618
Unscheduled inspection
Start date: 2017-08-07, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: