Found 32 inspections:

# 242101191951
Unscheduled inspection
Start date: 2021-11-09, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242101191978
Unscheduled inspection
Start date: 2021-11-09, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242101273093
Unscheduled inspection
Start date: 2021-11-01, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out for the purpose of: carrying out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notice (No. 192 dated 10/22/2021) on the completion of the construction of the capital construction facility; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation. 7. The subject of this audit is compliance with: 7.1. Compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation); 7.2. Building permit requirements; 7.3. Requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.4. Requirements for the construction control procedure established by the Urban Planning Code of the Russian Federation and other regulatory legal acts


# 242100468306
Unscheduled inspection
Start date: 2021-08-12, end date: —, duration:
Authority:
Purpose of inspection:


# 242100431114
Unscheduled inspection
Start date: 2021-08-13, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued to the person being checked instruction No. 216-ONS-2 dated 02/16/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 08/12/2021. The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period. 7. The subject of this audit is the fulfillment of the instructions of the body carrying out regional state construction supervision.


# 242100405457
Unscheduled inspection
Start date: 2021-08-03, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out for the purpose of: carrying out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notice (No. 107 dated 07/27/2021) on the completion of the construction of the capital construction facility; The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development activities, including project documentation. 7. The subject of this audit is compliance with: 7.1. Compliance of the work performed and the construction materials and products used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with Parts 3.8 and 3.9 article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation); 7.2. Building permit requirements; 7.3. Requirements established by Parts 2 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation; 7.4. Requirements to the construction control procedure established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.


# 242100334695
Unscheduled inspection
Start date: 2021-07-21, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242100217716
Unscheduled inspection
Start date: 2021-05-17, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: 6. Establish that: this audit is conducted for the purpose of state control and supervision in the field of shared-equity construction of apartment buildings and (or) other real estate objects based on the identification during the analysis of the developer's quarterly reports on activities related to attracting funds from participants in shared-equity construction for the construction (creation) of apartment buildings and (or) other real estate objects of signs violations of mandatory requirements (reasoned submission based on the results of the preliminary inspection dated 05/12/2021 No. 67); The objectives of this audit are: prevention, detection and suppression of violations of the requirements of legislation in the field of shared-equity construction of apartment buildings and (or) other real estate objects. 7. The subject of this audit is: compliance with mandatory requirements and (or) requirements established by municipal legal acts.


# 242004204978
Unscheduled inspection
Start date: 2020-02-03, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 242004204975
Unscheduled inspection
Start date: 2020-02-03, end date: 2020-02-28, duration: 19
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 06062018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including design Documentation


# 242004161078
Unscheduled inspection
Start date: 2020-01-10, end date: 2019-12-23, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked dated 31102019 2787/12 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 09.012020the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period


# 242004160376
Unscheduled inspection
Start date: 2020-01-10, end date: 2019-12-23, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked dated 31102019 2787/12 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 09.012020the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period


# 242004238742
Unscheduled inspection
Start date: 2020-01-23, end date: 2020-02-19, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that the present inspection is carried out for the purpose of state control and supervision in the field of shared-equity construction of apartment buildings and or other real estate objects based on the identification during the analysis of the project declaration of signs of violation of mandatory requirements established by the legislation on participation in shared-equity construction of apartment buildings and or other real estate objects reasoned submission based on the results of the preliminary inspection dated 27/122019 380 objectives of this Inspections are aimed at preventing detecting and suppressing violations of the requirements of legislation in the field of shared-equity construction of apartment buildings and or other real estate objects


# 241903630961
Unscheduled inspection
Start date: 2019-10-04, end date: —, duration:
Authority:
Purpose of inspection:


# 241903810248
Unscheduled inspection
Start date: 2019-10-09, end date: 2019-11-06, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of state control and supervision in the field of shared-equity construction of apartment buildings and or other real estate objects is based on the identification during the analysis of the developer's quarterly reports on activities related to attracting funds from participants in shared-equity construction for the construction of apartment buildings and or other real estate objects of signs of violation of mandatory requirements motivated submission based on the results of a preliminary audit dated 30092019267 The objectives of this audit are to prevent identify and suppress violations of the requirements of legislation in the field of shared-equity construction of apartment buildings and or other real estate objects. The purpose of this audit is to comply with mandatory requirements and or requirements established by municipal legal acts


# 241903824243
Unscheduled inspection
Start date: 2019-10-18, end date: 2019-10-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of an order previously issued to the person being checked dated 26072019 1976-2 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 17102019the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period


# 24190803448388
Unscheduled inspection
Start date: 2019-07-01, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803431234
Unscheduled inspection
Start date: 2019-06-07, end date: 2019-06-21, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being checked regulation 534OZHS of 15032019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 06062019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803431233
Unscheduled inspection
Start date: 2019-06-07, end date: 2019-06-21, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being checked regulation No. 570OZHS dated 15032019 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 06062019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the time period prescribed by the regulation The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803361246
Unscheduled inspection
Start date: 2019-03-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24190803353812
Unscheduled inspection
Start date: 2019-03-01, end date: 2019-03-15, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the previously issued to the person being checked regulation 4952OZHS dated 17122018 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 28022019 The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the actual work performed in accordance with the prescribed measures within the prescribed period The subject of the audit is to comply with the lawful order of the body carrying out regional state construction supervision


# 24190803353811
Unscheduled inspection
Start date: 2019-03-01, end date: —, duration:
Authority:
Purpose of inspection:


# 241902483014
Unscheduled inspection
Start date: 2019-02-08, end date: 2019-02-21, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited order No. 4872OZHS dated 27/122018 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 07022019 The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241802171241
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 06062018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241802180691
Unscheduled inspection
Start date: 2018-12-07, end date: 2018-12-20, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 26102018 3888OZHS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 06122018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241802148825
Unscheduled inspection
Start date: 2018-11-30, end date: 2018-12-13, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited order No. 10102018 3847OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 29112018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241801695980
Unscheduled inspection
Start date: 2018-10-01, end date: 2018-10-26, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 06062018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241801620499
Unscheduled inspection
Start date: 2018-09-28, end date: 2018-10-11, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the instruction issued earlier to the person being checked from 23082018 3056OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 27092018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800590005
Unscheduled inspection
Start date: 2018-08-01, end date: 2018-08-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 06062018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800569690
Unscheduled inspection
Start date: 2018-07-27, end date: —, duration:
Authority:
Purpose of inspection:


# 241800569561
Unscheduled inspection
Start date: 2018-06-06, end date: 2018-07-04, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notice 118 dated 29052018 on the start of construction of the capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities, including technical regulations and project documentation. 7 The subject of this audit is 71 Verification of compliance with works and construction materials used during the construction of a capital construction facility, as well as the results of such work, requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with energy metering devices 72 Meeting the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a construction permit


# 241800433295
Unscheduled inspection
Start date: 2018-06-06, end date: 2018-07-04, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notice 118 dated 29052018 on the start of construction of the capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities, including technical regulations and project documentation. 7 The subject of this audit is 71 Verification of compliance with works and construction materials used during the construction of a capital construction facility, as well as the results of such work, requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with energy metering devices 72 Meeting the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a construction permit


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.