Found 79 inspections:

# 772101262177
Unscheduled inspection
Start date: 2021-11-03, end date: —, duration:
Authority:
Purpose of inspection:


# 772101330136
Unscheduled inspection
Start date: 2021-11-16, end date: —, duration:
Authority:
Purpose of inspection:


# 772101173597
Unscheduled inspection
Start date: 2021-10-11, end date: 2021-10-15, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772101233628
Unscheduled inspection
Start date: 2021-10-20, end date: 2021-11-02, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772101181913
Unscheduled inspection
Start date: 2021-10-15, end date: 2021-11-15, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100693578
Unscheduled inspection
Start date: 2021-09-15, end date: 2021-09-22, duration: 6
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100547428
Unscheduled inspection
Start date: 2021-09-03, end date: —, duration:
Authority:
Purpose of inspection:


# 772100450250
Unscheduled inspection
Start date: 2021-08-13, end date: —, duration:
Authority:
Purpose of inspection:


# 772100315046
Unscheduled inspection
Start date: 2021-06-30, end date: 2021-07-06, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100271560
Unscheduled inspection
Start date: 2021-06-09, end date: 2021-06-17, duration: 6
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100226755
Unscheduled inspection
Start date: 2021-06-07, end date: 2021-06-25, duration: 14
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100263666
Unscheduled inspection
Start date: 2021-06-04, end date: —, duration:
Authority:
Purpose of inspection:


# 772100179591
Unscheduled inspection
Start date: 2021-05-04, end date: —, duration:
Authority:
Purpose of inspection:


# 772100175203
Unscheduled inspection
Start date: 2021-05-04, end date: 2021-05-06, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100084157
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-30, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100046775
Unscheduled inspection
Start date: 2021-03-04, end date: 2021-03-31, duration: 19
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772105354192
Unscheduled inspection
Start date: 2021-02-11, end date: —, duration:
Authority:
Purpose of inspection:


# 772105349510
Unscheduled inspection
Start date: 2021-02-09, end date: —, duration:
Authority:
Purpose of inspection:


# 772005226883
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-11-27, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision


# 772005207353
Unscheduled inspection
Start date: 2020-11-11, end date: —, duration:
Authority:
Purpose of inspection:


# 772005160397
Unscheduled inspection
Start date: 2020-10-05, end date: —, duration:
Authority:
Purpose of inspection:


# 772004491535
Unscheduled inspection
Start date: 2020-08-18, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772004460267
Unscheduled inspection
Start date: 2020-07-20, end date: —, duration:
Authority:
Purpose of inspection:


# 772004429759
Unscheduled inspection
Start date: 2020-06-17, end date: —, duration:
Authority:
Purpose of inspection:


# 772004420135
Unscheduled inspection
Start date: 2020-05-29, end date: 2020-06-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used


# 772004413049
Unscheduled inspection
Start date: 2020-05-22, end date: 2020-05-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used


# 772004296796
Unscheduled inspection
Start date: 2020-03-04, end date: —, duration:
Authority:
Purpose of inspection:


# 772004385988
Unscheduled inspection
Start date: 2020-03-30, end date: 2020-03-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772004337497
Unscheduled inspection
Start date: 2020-03-16, end date: —, duration:
Authority:
Purpose of inspection:


# 772004252320
Unscheduled inspection
Start date: 2020-02-03, end date: —, duration:
Authority:
Purpose of inspection:


# 772004260912
Unscheduled inspection
Start date: 2020-02-05, end date: 2020-02-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772004219969
Unscheduled inspection
Start date: 2020-01-22, end date: —, duration:
Authority:
Purpose of inspection:


# 771904156256
Unscheduled inspection
Start date: 2019-12-27, end date: 2020-01-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify compliance with the instructions of the Moscow State Construction Supervision


# 771904019741
Unscheduled inspection
Start date: 2019-11-25, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803480052
Unscheduled inspection
Start date: 2019-08-19, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803474962
Unscheduled inspection
Start date: 2019-08-19, end date: 2019-09-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803465613
Unscheduled inspection
Start date: 2019-07-25, end date: 2019-07-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803413950
Unscheduled inspection
Start date: 2019-05-20, end date: 2019-06-14, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77190803421875
Unscheduled inspection
Start date: 2019-05-23, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803407636
Unscheduled inspection
Start date: 2019-05-07, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803373511
Unscheduled inspection
Start date: 2019-03-18, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803373513
Unscheduled inspection
Start date: 2019-03-25, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803316337
Unscheduled inspection
Start date: 2019-01-17, end date: 2019-02-01, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803289571
Unscheduled inspection
Start date: 2018-12-11, end date: 2019-01-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803259047
Unscheduled inspection
Start date: 2018-10-29, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803202356
Unscheduled inspection
Start date: 2018-08-13, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803194114
Unscheduled inspection
Start date: 2018-08-03, end date: 2018-08-10, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803191534
Unscheduled inspection
Start date: 2018-08-06, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803185474
Unscheduled inspection
Start date: 2018-08-23, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77180803182387
Unscheduled inspection
Start date: 2018-07-17, end date: 2018-08-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803191234
Unscheduled inspection
Start date: 2018-07-31, end date: 2018-08-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803174171
Unscheduled inspection
Start date: 2018-07-04, end date: 2018-07-10, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803172674
Unscheduled inspection
Start date: 2018-07-02, end date: 2018-07-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803164453
Unscheduled inspection
Start date: 2018-06-19, end date: 2018-07-16, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803137014
Unscheduled inspection
Start date: 2018-05-10, end date: 2018-05-11, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803139335
Unscheduled inspection
Start date: 2018-05-14, end date: 2018-06-08, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803117398
Unscheduled inspection
Start date: 2018-04-06, end date: 2018-04-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803102059
Unscheduled inspection
Start date: 2018-03-19, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803108981
Unscheduled inspection
Start date: 2018-03-21, end date: 2018-03-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803079504
Unscheduled inspection
Start date: 2018-01-16, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803066110
Unscheduled inspection
Start date: 2018-01-16, end date: 2018-01-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803082121
Unscheduled inspection
Start date: 2018-01-23, end date: 2018-02-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803069190
Unscheduled inspection
Start date: 2018-01-23, end date: 2018-02-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803072702
Unscheduled inspection
Start date: 2018-01-29, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802989068
Unscheduled inspection
Start date: 2017-12-07, end date: 2017-12-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802807494
Unscheduled inspection
Start date: 2017-11-01, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802747498
Unscheduled inspection
Start date: 2017-10-31, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802629351
Unscheduled inspection
Start date: 2017-09-28, end date: 2017-10-05, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802578131
Unscheduled inspection
Start date: 2017-09-25, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701864657
Unscheduled inspection
Start date: 2017-08-07, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77170701740199
Unscheduled inspection
Start date: 2017-06-26, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701711211
Unscheduled inspection
Start date: 2017-06-21, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701616299
Unscheduled inspection
Start date: 2017-05-15, end date: 2017-06-09, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: kontrol za vypolneniem zakonnogo predpisaniya organa osuschestvlyayuschego gosudarstvennyi pozharnyi nadzor predpisaniya ob ustranenii narushenii trebovanii pozharnoi bezopasnosti 30511 ot 30122016g o provedenii meropriyatii po obespecheniyu pozharnoi bezopasnosti na obektah zaschity i po predotvrascheniyu ugrozy vozniknoveniya pozhara sroki kotorogo istekli


# 77170701543589
Unscheduled inspection
Start date: 2017-05-02, end date: 2017-05-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701524790
Unscheduled inspection
Start date: 2017-04-13, end date: 2017-04-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701416545
Unscheduled inspection
Start date: 2017-03-02, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701347525
Unscheduled inspection
Start date: 2017-02-02, end date: 2017-02-09, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701329429
Unscheduled inspection
Start date: 2017-01-25, end date: —, duration:
Authority:
Purpose of inspection:


# 77160701240019
Unscheduled inspection
Start date: 2016-12-15, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.