# 242101368784
Unscheduled inspection
Start date: 2021-11-23, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that:
This check is carried out in order to verify the fulfillment of the previously issued to the person being checked order No. 2404-ONS-3 dated 04.10.2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 11/22/2021.
The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the work actually performed in accordance with the prescribed measures within the prescribed period.
7. The subject of this audit is the fulfillment of the instruction of the body carrying out regional state construction supervision.
# 242100935445
Unscheduled inspection
Start date: 2021-09-21, end date: —, duration: 10
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that:
This check is carried out in order to verify the fulfillment of the previously issued to the person being checked order No. 1711-ONS-3 dated 08/16/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 09/20/2021.
The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the work actually performed in accordance with the prescribed measures within the prescribed period.
7. The subject of this audit is the fulfillment of the instruction of the body carrying out regional state construction supervision.
# 242100314676
Unscheduled inspection
Start date: 2021-08-02, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the reconstruction of the specified capital construction facility, in connection with the onset of completion dates, which are subject to verification in accordance with the approved program of 05/11/2021 inspections during the reconstruction of the capital construction facility;
The objectives of this audit are to prevent, identify and suppress violations of legislation on urban development, including project documentation.
7. The subject of this audit is:
7.1. Verification of compliance of the work performed and the construction materials used in the process of reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (taking into account the changes made to the design documentation in accordance with parts 3.8 and 3.9 of Article 49 Of the Urban Planning Code of the Russian Federation) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and equipment requirements of the capital construction facility metering devices for energy resources used;
7.2. Fulfillment of the requirements established by Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation;
7.3. Checking the availability of a building permit.
# 242100306329
Unscheduled inspection
Start date: 2021-07-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 242100309638
Unscheduled inspection
Start date: 2021-07-20, end date: —, duration: 20
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This check is carried out in order to verify the fulfillment of the previously issued to the person being checked order No. 1363-ONS-3 dated 06/18/2021 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 07/19/2021.
The objectives of this audit are: to establish the fact of the elimination of previously identified violations, to verify the work actually performed in accordance with the prescribed measures within the prescribed period.
7. The subject of this audit is the fulfillment of the instruction of the body carrying out regional state construction supervision.
# 242100243425
Unscheduled inspection
Start date: 2021-06-01, end date: —, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: