Found 95 inspections:

# 242004406180
Unscheduled inspection
Start date: 2020-05-06, end date: 2020-05-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: To establish that this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 05032018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including design Documentation


# 241903849980
Unscheduled inspection
Start date: 2019-10-28, end date: 2019-11-11, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 28082019 2191C1 previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 25102019the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period


# 241903847583
Unscheduled inspection
Start date: 2019-10-15, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803480820
Unscheduled inspection
Start date: 2019-08-20, end date: 2019-09-02, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the audit is to verify the fulfillment of the instruction 1203SENiEK dated 29042019, previously issued to the person being checked, on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 19082019. The objectives of the audit are to establish the fact of elimination of previously identified violations, to verify the work actually performed in accordance with the prescribed measures within the time period established by the regulation. The subject of the audit is to comply with the lawful instruction of the body carrying out regional state construction supervision


# 24190803466250
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of checking the implementation of regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to verification in accordance with the approved program from 30062017 for inspections during the construction of the capital construction facility The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation The subject of the inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used. verification of the certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the facility capital construction


# 24190803462668
Unscheduled inspection
Start date: 2019-07-23, end date: 2019-08-19, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the inspection is to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 115 dated 15072019 on the completion of the construction of the capital construction facility. The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation. The subject of the inspection is to verify the compliance of the work performed and the building materials used during the construction of the facility capital construction as well as the results of such work, the requirements of technical regulations and design documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, are subject to verification by all acts, regulations, notices on the elimination of violations and deficiencies identified during the implementation of regional state construction supervision, compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation Federation verification of a building permit


# 24190803438539
Unscheduled inspection
Start date: 2019-06-19, end date: 2019-07-16, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the inspection is to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 95 dated 10062019 on the completion of the construction of the capital construction facility. The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation. The subject of the inspection is to verify the compliance of the work performed and the construction materials used during the construction of the facility capital construction as well as the results of such work, the requirements of technical regulations and design documentation, including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources, are subject to verification by all acts, regulations, notices on the elimination of violations and deficiencies identified during the implementation of regional state construction supervision, compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation Federation verification of a building permit


# 24190803424730
Unscheduled inspection
Start date: 2019-05-23, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803403729
Unscheduled inspection
Start date: 2019-05-06, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803399715
Unscheduled inspection
Start date: 2019-04-23, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803377675
Unscheduled inspection
Start date: 2019-04-01, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803391923
Unscheduled inspection
Start date: 2019-04-09, end date: —, duration:
Authority:
Purpose of inspection:


# 24190803375577
Unscheduled inspection
Start date: 2019-03-20, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 241902467852
Unscheduled inspection
Start date: 2019-02-01, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 241802095584
Unscheduled inspection
Start date: 2018-11-20, end date: 2018-12-03, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited order dated 10102018 3951SENiEK on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 19112018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241802026143
Unscheduled inspection
Start date: 2018-11-01, end date: 2018-11-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 27082018 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of the compliance of the work performed and the construction materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241802022841
Unscheduled inspection
Start date: 2018-11-02, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 241801707969
Unscheduled inspection
Start date: 2018-10-02, end date: —, duration:
Authority:
Purpose of inspection:


# 241801696346
Unscheduled inspection
Start date: 2018-10-04, end date: 2018-10-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 30062017 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and 7 The subject of this audit is 71 Verification of the compliance of the work performed and the construction materials used during the construction of an investment facility, as well as the results of such work, with the requirements of the project documentation, including energy efficiency requirements, with the exception of capital construction facilities that are not subject to energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used. 72 Meeting the requirements set out in Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241801974023
Unscheduled inspection
Start date: 2018-10-19, end date: 2018-11-16, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 154 dated 11102018 on the completion dates of works subject to inspection during the construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation. 7 The subject of this inspection 71 Verification of compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements set out in Parts 2 to 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241801941612
Unscheduled inspection
Start date: 2018-10-19, end date: 2018-11-01, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction dated 04092018 3448OZHS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 18/102018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241801282304
Unscheduled inspection
Start date: 2018-09-18, end date: 2018-10-01, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction dated 28082018 2926EN on the elimination of identified violations at the specified capital construction facility, which expires on 17092018, previously issued to the person being checked. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241801421354
Unscheduled inspection
Start date: 2018-09-11, end date: 2018-09-17, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction from 28082018 2926EN on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 10092018 vx 207 on the elimination of violations before the expiration of the period specified in the instruction. The purpose of this inspection is to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures. 7 The subject of this audit is the fulfillment of a lawful order of the body carrying out regional state construction supervision, the deadline for which expires, respectively.


# 241801609896
Unscheduled inspection
Start date: 2018-09-25, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 241800651533
Unscheduled inspection
Start date: 2018-09-03, end date: 2018-09-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 30062017 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241801017765
Unscheduled inspection
Start date: 2018-09-05, end date: 2018-10-02, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 150 dated 03092018 on the completion of the construction of the capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities, including technical regulations and project documentation. 7 The subject of this audit is 71 Verification of compliance with all acts prescriptions notices on the elimination of violations deficiencies identified during the implementation of regional state construction supervision 72 are subject to verification in accordance with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Verification of the availability of a building permit


# 241800894021
Unscheduled inspection
Start date: 2018-09-05, end date: 2018-09-18, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the instruction previously issued to the person being audited dated 22082018 3180DPO on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 04092018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800616547
Unscheduled inspection
Start date: 2018-08-14, end date: —, duration:
Authority:
Purpose of inspection:


# 241800616531
Unscheduled inspection
Start date: 2018-08-14, end date: 2018-08-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to verify the fulfillment of the instruction previously issued to the person being checked from 04072018 24371DPO on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 13082018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800616566
Unscheduled inspection
Start date: 2018-08-14, end date: —, duration:
Authority:
Purpose of inspection:


# 241800670245
Unscheduled inspection
Start date: 2018-08-28, end date: 2018-09-24, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 217 dated 20082018 on the start of construction of the capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation. 7 The subject of this audit is 71 Verification of compliance with works and construction materials used during the construction of a capital construction facility, as well as the results of such work, requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with energy metering devices 72 Meeting the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a construction permit


# 241800670107
Unscheduled inspection
Start date: 2018-08-28, end date: 2018-09-24, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 136 dated 20082018 on the completion of the construction of the capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities, including technical regulations and project documentation. 7 The subject of this audit is 71 Verification of compliance with all acts prescriptions notices on the elimination of violations deficiencies identified during the implementation of regional state construction supervision 72 are subject to verification in accordance with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used. parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Verification of the availability of a building permit


# 241800583817
Unscheduled inspection
Start date: 2018-08-01, end date: 2018-08-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 30062017 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800565858
Unscheduled inspection
Start date: 2018-07-31, end date: 2018-08-13, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 28062018 1854EN previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 30072018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800556256
Unscheduled inspection
Start date: 2018-07-23, end date: 2018-08-03, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 08052018 1223DPO on the elimination of identified violations at the specified capital construction facility, the deadline for which expires in 20072018. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800560406
Unscheduled inspection
Start date: 2018-07-24, end date: —, duration:
Authority:
Purpose of inspection:


# 241800492619
Unscheduled inspection
Start date: 2018-07-02, end date: —, duration:
Authority:
Purpose of inspection:


# 241800499627
Unscheduled inspection
Start date: 2018-06-29, end date: 2018-07-26, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 87 dated 21062018 on the completion dates of works subject to inspection during the construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation. 7 The subject of this inspection is 71 Checking the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used 72 Meeting the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation 73 Checking for a building permit


# 241800490871
Unscheduled inspection
Start date: 2018-06-29, end date: 2018-07-12, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 22052018 13781DPO previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 28062018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800490841
Unscheduled inspection
Start date: 2018-06-29, end date: 2018-07-12, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction dated 21052018 1695DPO on the elimination of identified violations at the specified capital construction facility, which expires on 28062018. The objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800473723
Unscheduled inspection
Start date: 2018-06-22, end date: 2018-07-05, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to verify the fulfillment of the instruction dated 28052018 1412OZHS previously issued to the person being checked on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 21062018 the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800407921
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-06-15, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the instruction issued earlier to the person being checked from 14032018 682OZHS on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 31052018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800385832
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-06-29, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 30062017 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800469725
Unscheduled inspection
Start date: 2018-06-25, end date: 2018-07-06, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited order dated 22052018 1378DPO on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 22062018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is the fulfillment of the order of the authority carrying out regional state construction supervision


# 241800359521
Unscheduled inspection
Start date: 2018-05-18, end date: 2018-05-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited instruction from 30032018 5531DPO on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 17052018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 241800318996
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 24032015 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800312024
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 28082015 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800307694
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-31, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of work that is subject to inspection in accordance with the approved program of 30062017 inspections during the construction of the capital construction facility the objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation 7 The subject of this audit is 71 Verification of the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used 72 Compliance with the requirements established by parts 2 3 and 31 of the Article 52 of the Urban Planning Code of the Russian Federation 73 Checking the availability of a building permit


# 241800273934
Unscheduled inspection
Start date: 2018-04-23, end date: 2018-05-08, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this audit is carried out in order to verify the fulfillment of the previously issued to the person being audited order No. 30032018 553DPO on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 20042018 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7 The subject of this audit is to comply with the instructions of the authority carrying out regional state construction supervision


# 241800246352
Unscheduled inspection
Start date: 2018-04-03, end date: 2018-04-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: the implementation of regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 40 dated 26032018 on the completion of the construction of the capital construction facility the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation 7 The subject of this audit is 71 Verification of the conformity of work and applied building materials during the construction of a capital construction facility, as well as the results of such work, the requirements of technical regulations and design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, are subject to verification of all acts, regulations, notices on the elimination of violations and deficiencies identified during the implementation of regional state construction supervision. Compliance with the requirements set out in Parts 2, 3 and 31 Article 52 of the Urban Planning Code of the Russian Federation 73 Verification of a building permit


# 241800095377
Unscheduled inspection
Start date: 2018-03-01, end date: 2018-03-30, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: prevention detection and suppression of violations of legislation on urban development activities, including technical regulations and project documentation


# 241800090475
Unscheduled inspection
Start date: 2018-03-01, end date: —, duration:
Authority:
Purpose of inspection:


# 241800109287
Unscheduled inspection
Start date: 2018-03-02, end date: —, duration:
Authority:
Purpose of inspection:


# 241800188031
Unscheduled inspection
Start date: 2018-03-06, end date: 2018-04-04, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose is to carry out state control and supervision in the field of shared-equity construction of apartment buildings and or other real estate objects on the basis of a reasoned submission dated 27022018 20 based on the results of an analysis of the execution of an instruction previously issued to the person being audited on the elimination of identified violations 269DS dated 08122017, the deadline for which expired Tasks are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with prescribed measures within the time period prescribed by the regulation, the subject is to comply with the regulations of the state control and supervision bodies


# 241800039921
Unscheduled inspection
Start date: 2018-02-05, end date: 2018-02-05, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: prevention detection and suppression of violations of legislation on urban development activities, including technical regulations and project documentation


# 241800093904
Unscheduled inspection
Start date: 2018-02-08, end date: 2018-03-12, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose is to carry out state control and supervision in the field of shared-equity construction of apartment buildings and or other real estate objects on the basis of a reasoned submission dated 31.012018 8 based on the results of an analysis of the execution of an instruction previously issued to the person being audited on the elimination of identified violations 262DS dated 09112017, the deadline for which expired Tasks are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with prescribed measures Within the time period prescribed by the regulation, the subject of this inspection is the fulfillment of the instructions of the state control and supervision bodies.


# 241800093943
Unscheduled inspection
Start date: 2018-02-08, end date: 2018-03-12, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose is to carry out state control and supervision in the field of shared-equity construction of apartment buildings and or other real estate objects on the basis of a reasoned submission dated 31.012018 7 based on the results of an analysis of the execution of an instruction previously issued to the person being audited on the elimination of identified violations 253DS dated 13112017, the deadline for which has expired Tasks to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with prescribed measures within the time period prescribed by the regulation, the subject is to comply with the regulations of the state control and supervision bodies


# 24180803037287
Unscheduled inspection
Start date: 2018-01-10, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170802972440
Unscheduled inspection
Start date: 2017-12-19, end date: 2018-01-09, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked dated 09/12017 4524TN on the elimination of identified violations at the specified capital construction facility, the deadline for which expires on 18/122017. The objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period 7. The subject of this inspection is the fulfillment of the instruction of the authority carrying out regional state construction supervision


# 24170802829194
Unscheduled inspection
Start date: 2017-11-08, end date: 2017-12-05, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose is to carry out state control and supervision in the field of shared-equity construction of apartment buildings and or other real estate objects on the basis of a reasoned submission dated 30102017 g 247 based on the results of an analysis of the execution of an instruction previously issued to the person being audited on the elimination of identified violations dated 26072017 g 151DS, the deadline for which has expired Tasks to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with The prescribed measures within the time period prescribed by the regulation are subject to the fulfillment of the instructions of the state control and supervision bodies


# 24170802864699
Unscheduled inspection
Start date: 2017-11-13, end date: 2017-12-08, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Purpose Implementation of state control and supervision in the field of shared-equity construction of apartment buildings and or other real estate objects on the basis of a reasoned submission dated 08112017 253 based on the results of an analysis of the execution of an order previously issued to the person being checked to eliminate identified violations dated 04082017 161DS, the deadline for which has expired Tasks To establish the fact of elimination of previously identified violations verification of actually completed work in accordance with prescribed measures within the time period prescribed by the regulation, the subject is to comply with the regulations of the state control and supervision bodies


# 24170802705891
Unscheduled inspection
Start date: 2017-10-04, end date: —, duration:
Authority:
Purpose of inspection:


# 24170802758030
Unscheduled inspection
Start date: 2017-10-16, end date: 2017-11-13, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose is to carry out state control and supervision in the field of shared-equity construction of apartment buildings and or other real estate objects on the basis of a reasoned submission dated 06102017 242 based on the results of an analysis of the execution of an instruction previously issued to the person being audited on the elimination of identified violations dated 11082017 166DS, the deadline for which has expired Tasks to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with Subject to the prescribed measures within the time period prescribed by the regulation is the fulfillment of the regulations of the state control and supervision bodies


# 24170802710094
Unscheduled inspection
Start date: 2017-10-12, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701875856
Unscheduled inspection
Start date: 2017-08-22, end date: 2017-09-04, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the instruction issued earlier to the person being checked dated 21072017 2972DPO on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 21082017 the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is the fulfillment of the instruction of the body carrying out Regional State construction supervision


# 24170701800942
Unscheduled inspection
Start date: 2017-07-17, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170701818933
Unscheduled inspection
Start date: 2017-07-10, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701765642
Unscheduled inspection
Start date: 2017-07-07, end date: 2017-08-03, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification dated 29062017 bx 143 on the start of construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation7 The subject of this inspection is71 Verification of the conformity of work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used72 Verification of the availability of a certificate of admission to the types of work on the construction of the capital construction facility that affect the safety of the capital construction facility


# 24170701762828
Unscheduled inspection
Start date: 2017-07-05, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170701763431
Unscheduled inspection
Start date: 2017-06-29, end date: 2017-07-26, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: purpose implementation of state control and supervision in the field of shared-equity construction of apartment buildings and or other real estate objects tasks prevention identification and suppression of violations of legislation in the field of shared-equity construction of apartment buildings and or other real estate objects subject to compliance with mandatory requirements and or requirements established by municipal legal acts


# 24170701741152
Unscheduled inspection
Start date: 2017-06-23, end date: 2017-07-20, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: in order to carry out state control and supervision in the field of shared-equity construction of apartment buildings and or other real estate objects on the basis of a reasoned submission from the head of the Department for Supervision of shared-equity construction EA Hamardyuk dated 15062017 148 based on the results of an analysis of the execution of an instruction previously issued to the audited person on the elimination of identified violations dated March 13, 2017 19DS, the deadline for which expires, the tasks of this audit are establishing the fact of elimination of previously identified violations and checking the work actually performed in accordance with the prescribed measures within the time period prescribed by the regulation, the purpose of this audit is to comply with the instructions of the state control and supervision authorities


# 24170701651198
Unscheduled inspection
Start date: 2017-05-30, end date: 2017-06-21, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the previously issued instruction from 22052017 1968NSS on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 23052017 bx 48 on the elimination of violations before the expiration of the period specified in the prescriptionthe objectives of this inspection are to establish the elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures.7 The subject of this The purpose of the inspection is to comply with the legal order of the body carrying out the regional state construction supervision, the deadline for which expires on the DATE respectively.


# 24170701654778
Unscheduled inspection
Start date: 2017-05-29, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701584881
Unscheduled inspection
Start date: 2017-05-05, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170701582555
Unscheduled inspection
Start date: 2017-05-04, end date: 2017-06-02, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: this unscheduled inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification dated 26042017 bx 86 on the completion of the construction of the capital construction facility. The objectives of this unscheduled inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation, to verify the compliance of the work and the applicable construction materials during the construction of a capital construction facility, as well as the results of such work, the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, are subject to verification of all acts regulations notices on the elimination of violations deficiencies identified during the implementation of regional state construction supervision, Checking the availability of a construction permit, Checking the availability of certificates of admission to the types of work on the construction of a capital construction facility that affect the safety of a capital construction facility


# 24170701516879
Unscheduled inspection
Start date: 2017-04-14, end date: 2017-04-27, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the fulfillment of the instruction previously issued to the person being checked from 09032017 767EN on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 13042017the objectives of this inspection are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this inspection is the fulfillment of the instruction of the body carrying out the regional State construction supervision


# 24170701510054
Unscheduled inspection
Start date: 2017-04-06, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701500245
Unscheduled inspection
Start date: 2017-04-03, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701460274
Unscheduled inspection
Start date: 2017-03-15, end date: —, duration:
Authority:
Purpose of inspection:


# 24170701441293
Unscheduled inspection
Start date: 2017-03-13, end date: 2017-04-07, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of a notification received from 02032017 bx 25 on the completion dates of works subject to inspection during the construction of the capital construction facility. The objectives of this inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation. The subject of this inspection is verification compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used, verification of the availability of a construction permit, verification of the availability of a certificate of admission to the types of work on the construction of the capital construction facility that have an impact on the safety of the capital construction facility


# 24170701441275
Unscheduled inspection
Start date: 2017-03-13, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170701404697
Unscheduled inspection
Start date: 2017-03-02, end date: 2017-03-16, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is carried out in order to verify the fulfillment of the previously issued to the person being audited order No. 61EN dated 25012017 on the elimination of identified violations at the specified capital construction facility, the deadline for which expires 02032017the objectives of this audit are to establish the fact of elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the prescribed period. The subject of this audit is to comply with the instructions of the body carrying out the regional State construction supervision


# 24170701373007
Unscheduled inspection
Start date: 2017-02-09, end date: 2017-03-13, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Objectives implementation of state control and supervision in the field of shared-equity construction of apartment buildings and or other real estate objects based on a reasoned submission by the head of the shared-equity supervision department based on the results of an analysis of the execution of an instruction previously issued to the person being audited on the elimination of identified violations from 09022017 264DS, the deadline for which has expired Tasks to establish the elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the time limit prescribed by the regulation provide for the verification of compliance with the regulations of the state control and supervision authorities


# 24170701372834
Unscheduled inspection
Start date: 2017-02-07, end date: 2017-03-01, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Objectives implementation of state control and supervision in the field of shared-equity construction of apartment buildings and or other real estate objects based on a reasoned submission by the head of the shared-equity supervision department based on the results of an analysis of the execution of an instruction previously issued to the person being audited on the elimination of identified violations dated 28102016 255DS, the deadline for which has expired Tasks to establish the elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the time limit prescribed by the regulation provide for the verification of compliance with the regulations of the state control and supervision authorities


# 24170701418013
Unscheduled inspection
Start date: 2017-02-28, end date: 2017-03-28, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Objectives implementation of state control and supervision in the field of shared-equity construction of apartment buildings and or other real estate objects on the basis of a reasoned submission from the head of the shared-equity supervision departmentproblems prevention detection and suppression of violations of legislation in the field of shared-equity construction of apartment buildings and or other real estate objects Subject to verification compliance with mandatory requirements and or requirements established by municipal legal acts


# 24170701417899
Unscheduled inspection
Start date: 2017-02-27, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24170701417905
Unscheduled inspection
Start date: 2017-02-22, end date: 2017-03-24, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Objectives implementation of state control and supervision in the field of shared-equity construction of apartment buildings and or other real estate objects based on a reasoned submission by the head of the shared-equity supervision department based on the results of an analysis of the execution of an instruction previously issued to the person being audited on the elimination of identified violations dated 17112016 271DS, the deadline for which has expired Tasks to establish the elimination of previously identified violations and to verify the work actually performed in accordance with the prescribed measures within the time limit prescribed by the regulation provide for the verification of compliance with the regulations of the state control and supervision authorities


# 24160701119393
Unscheduled inspection
Start date: 2016-11-11, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24160701010992
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-11-07, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: VERIFICATION OF REGULATION 174DS from 27072016


# 24160701049932
Unscheduled inspection
Start date: 2016-10-21, end date: —, duration:
Authority:
Purpose of inspection:


# 24160701025571
Unscheduled inspection
Start date: 2016-10-21, end date: 2016-11-18, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: VERIFICATION OF THE EXECUTION OF REGULATION 183DS dated 13102016


# 24160601746560
Unscheduled inspection
Start date: 2016-07-25, end date: 2016-08-19, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Objectives implementation of state control and supervision in the field of shared-equity construction of apartment buildings and or other real estate objects in order to verify the implementation of the regulation from 18032016 173DS signs of violation of mandatory requirements established by legislation on participation in shared-equity construction of apartment buildings and or other real estate objects Tasks prevention detection and suppression of violations of legislation in the field of shared-equity construction of apartment buildings and or other objects Real estate subject of verification of compliance by a legal entity with the mandatory requirements of legislation in the field of shared-equity construction of apartment buildings and other real estate objects


# 24160601746533
Unscheduled inspection
Start date: 2016-07-26, end date: 2016-08-22, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Objectives implementation of state control and supervision in the field of shared-equity construction of apartment buildings and or other real estate objects in order to verify the implementation of the regulation of 18032016 174DS signs of violation of mandatory requirements established by legislation on participation in shared-equity construction of apartment buildings and or other real estate objects Tasks prevention detection and suppression of violations of legislation in the field of shared-equity construction of apartment buildings and or other objects Real estate subject of verification of compliance by a legal entity with the mandatory requirements of legislation in the field of shared-equity construction of apartment buildings and other real estate objects


# 24160601714571
Unscheduled inspection
Start date: 2016-07-13, end date: —, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection:


# 24160601727946
Unscheduled inspection
Start date: 2016-07-18, end date: 2016-08-12, duration:
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: Objectives implementation of state control and supervision in the field of shared-equity construction of apartment buildings and or other real estate objects in order to verify the implementation of the regulation of 18032016 171DS signs of violation of mandatory requirements established by legislation on participation in shared-equity construction of apartment buildings and or other real estate objects Tasks prevention detection and suppression of violations of legislation in the field of shared-equity construction of apartment buildings and or other objects Real estate subject of verification of compliance by a legal entity with the mandatory requirements of legislation in the field of shared-equity construction of apartment buildings and other real estate objects


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.