Found 6 inspections:

# 741902883735
Unscheduled inspection
Start date: 2019-07-25, end date: 2019-07-31, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Conformity of work completion installation of internal water supply and sanitation systems for gas supply ventilation low-current power supply networks 2 stages of construction in rows AB axes 19 after completion of work Outdoor lighting 2 stages of construction in rows AB axes 19 after completion of work Interior finishing works landscaping 2 stages of construction in rows AB axes 19 after completion of work Fire and sanitary epidemiological measures and measures to ensure access for the disabled during the 2nd stage of construction in rows AB axes 19 after completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, project documentation2 Availability of a construction permit3 Compliance with the requirements of HH 23 and 31 st52 of the Urban Planning Code of the Russian Federation


# 741902785243
Unscheduled inspection
Start date: 2019-06-17, end date: —, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:


# 741800445327
Unscheduled inspection
Start date: 2018-06-18, end date: 2018-06-22, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Sootvetstvie vypolneniya rabot ustroistvo vnutrennih sistem elektrosnabzheniya slabotochnye seti 1 etapa stroitelstva v ryadah AV osyah 1018 posle zaversheniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii 2 Nalichie razresheniya na stroitelstvo 3 Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 74170802506493
Unscheduled inspection
Start date: 2017-09-25, end date: 2017-09-29, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot ustroistvo naruzhnyh setei elektrosnabzheniya posle zaversheniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 i 31 st52 Gradostroitelnogo kodeksa RF


# 74160700763272
Unscheduled inspection
Start date: 2016-09-26, end date: 2016-09-30, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1Sootvetstvie vypolneniya rabot posle zaversheniya naruzhnye seti elektrosnabzheniya naruzhnoe osveschenie i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii2Nalichie razresheniya na stroitelstvo3Vypolnenie trebovanii chch 23 st52 Gradostroitelnogo kodeksa RF


# 74160601771822
Unscheduled inspection
Start date: 2016-08-15, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.