# 74170701841476
Unscheduled inspection
Start date: 2017-08-07, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170701784165
Unscheduled inspection
Start date: 2017-07-12, end date: 2017-07-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on fire and sanitary epidemiological measures and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701676451
Unscheduled inspection
Start date: 2017-06-13, end date: 2017-06-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work with the installation of foundations stage 1 of construction in rows AB axes 1018 and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701605833
Unscheduled inspection
Start date: 2017-05-15, end date: 2017-05-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work with the installation of internal engineering systems heating water supply sanitation ventilation smoke removal of the basement electricity supply and low-current networks Interior finishing work Verification of fire-fighting sanitary and epidemiological measures and building materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2the receipt of a construction permit3the fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701581516
Unscheduled inspection
Start date: 2017-05-10, end date: 2017-05-12, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of internal engineering heating systems and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701642093
Unscheduled inspection
Start date: 2017-05-31, end date: 2017-06-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of external engineering systems and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701615894
Unscheduled inspection
Start date: 2017-05-23, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170701514501
Unscheduled inspection
Start date: 2017-04-10, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170701564840
Unscheduled inspection
Start date: 2017-04-26, end date: 2017-04-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1confirmation of the execution of the regulation from 14042017G2THE receipt of a construction permit3the fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701554813
Unscheduled inspection
Start date: 2017-04-24, end date: 2017-04-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work with the installation of the basement floor, the installation of basement and attic window blocks, the fire-resistant treatment of the rafter system and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701466055
Unscheduled inspection
Start date: 2017-03-27, end date: 2017-03-31, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of the work construction of the attic floor installation of the rafter system masonry walls partitions ventilation ducts covering fences weirs and the construction materials used during the construction of the capital construction facility as well as the results of such work to the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701336069
Unscheduled inspection
Start date: 2017-02-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701309962
Unscheduled inspection
Start date: 2017-01-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160701162301
Unscheduled inspection
Start date: 2016-12-05, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74160700915989
Unscheduled inspection
Start date: 2016-10-10, end date: 2016-10-14, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work after completion with the roof installation of the 2nd stage of construction in the axes 13 installation of the rafter system coating installation of fire doors and hatches and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Receipt of a construction permit3 Compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160601795525
Unscheduled inspection
Start date: 2016-08-22, end date: 2016-08-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work on the installation of exterior finishes of the basement ventilated facade external networks from the gas boiler room to ETC. laying of walls of ventilation ducts installation of concrete blocks on the 5th floor and installation of a technical floor laying of walls of the 2nd stage of construction and the construction materials used during the construction of the capital construction facility as well as the results of such work to the requirements of technical regulations of the project documentation2 Receipt of a construction permit 3compliance with the requirements of hh 23 st52 The Urban Planning Code of the Russian Federation