# 001800205198
Unscheduled inspection
Start date: 2018-03-07, end date: 2018-03-12, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Compliance with the requirements of the legislation on urban planning during the construction and reconstruction of a capital construction facility
# 00170802913558
Unscheduled inspection
Start date: 2017-12-04, end date: 2017-12-11, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 28082017 g 460G3327G19
# 00170802663402
Unscheduled inspection
Start date: 2017-10-06, end date: 2017-10-10, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 12 iyulya 2017 g 358G3327H04
# 00170701883228
Unscheduled inspection
Start date: 2017-08-11, end date: 2017-08-15, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance by a legal entity with the requirements of legislation on urban planning activities during the construction and reconstruction of capital construction facilities
# 00170701743775
Unscheduled inspection
Start date: 2017-07-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 00170701412788
Unscheduled inspection
Start date: 2017-03-13, end date: 2017-03-14, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 08022017 g 45G3327vno
# 00170701352503
Unscheduled inspection
Start date: 2017-02-08, end date: 2017-02-13, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 15122016 g 620G3327K43 vnpp
# 00170701352287
Unscheduled inspection
Start date: 2017-02-07, end date: 2017-02-08, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 27102016 g 546G3327vno
# 00160701232296
Unscheduled inspection
Start date: 2016-12-13, end date: 2016-12-15, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 17012016 g 3G3327K43
# 772101465000
Unscheduled inspection
Start date: 2021-12-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101465723
Unscheduled inspection
Start date: 2021-12-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101289501
Unscheduled inspection
Start date: 2021-11-08, end date: 2021-11-26, duration: 15
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772101368981
Unscheduled inspection
Start date: 2021-11-25, end date: 2021-12-22, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772101382203
Unscheduled inspection
Start date: 2021-11-25, end date: 2021-12-15, duration: 15
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772101354454
Unscheduled inspection
Start date: 2021-11-18, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772101332121
Unscheduled inspection
Start date: 2021-11-15, end date: 2021-11-26, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772101256076
Unscheduled inspection
Start date: 2021-10-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100472929
Unscheduled inspection
Start date: 2021-08-16, end date: 2021-09-10, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100472866
Unscheduled inspection
Start date: 2021-08-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100557314
Unscheduled inspection
Start date: 2021-08-30, end date: 2021-09-07, duration: 7
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100436225
Unscheduled inspection
Start date: 2021-08-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100401827
Unscheduled inspection
Start date: 2021-08-02, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772100356326
Unscheduled inspection
Start date: 2021-07-16, end date: 2021-07-28, duration: 9
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100332527
Unscheduled inspection
Start date: 2021-07-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100375711
Unscheduled inspection
Start date: 2021-07-26, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772100294925
Unscheduled inspection
Start date: 2021-06-18, end date: 2021-07-08, duration: 15
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100294926
Unscheduled inspection
Start date: 2021-06-18, end date: 2021-07-08, duration: 15
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100291244
Unscheduled inspection
Start date: 2021-06-17, end date: 2021-06-30, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100275455
Unscheduled inspection
Start date: 2021-06-10, end date: 2021-06-21, duration: 7
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100286801
Unscheduled inspection
Start date: 2021-06-11, end date: 2021-06-25, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100312185
Unscheduled inspection
Start date: 2021-06-25, end date: 2021-07-07, duration: 9
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100297943
Unscheduled inspection
Start date: 2021-06-22, end date: 2021-06-24, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100199166
Unscheduled inspection
Start date: 2021-05-14, end date: 2021-06-10, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100189381
Unscheduled inspection
Start date: 2021-05-11, end date: 2021-05-28, duration: 14
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100144378
Unscheduled inspection
Start date: 2021-04-13, end date: 2021-04-23, duration: 9
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772100067941
Unscheduled inspection
Start date: 2021-03-15, end date: 2021-03-25, duration: 9
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100053984
Unscheduled inspection
Start date: 2021-03-11, end date: 2021-03-19, duration: 7
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 772100063148
Unscheduled inspection
Start date: 2021-03-12, end date: 2021-03-25, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: to carry out control measures in connection with the receipt of the developer's (customer's) notification; The objectives of the audit: to prevent, identify and suppress violations of the requirements of project documentation and legislation on urban development by the person being audited; The subject of the audit: to verify the elimination of violations specified in the order issued by Mosgosstroynadzor, the conformity of work performed and the construction materials used in the process construction, reconstruction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance with the requirements of the project documentation identified during construction control and state construction supervision.
# 772100099461
Unscheduled inspection
Start date: 2021-03-29, end date: 2021-04-09, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100006359
Unscheduled inspection
Start date: 2021-02-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772105335981
Unscheduled inspection
Start date: 2021-02-02, end date: 2021-02-15, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772005271366
Unscheduled inspection
Start date: 2020-12-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005270342
Unscheduled inspection
Start date: 2020-12-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005265753
Unscheduled inspection
Start date: 2020-12-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005291565
Unscheduled inspection
Start date: 2020-12-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005208710
Unscheduled inspection
Start date: 2020-11-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005225862
Unscheduled inspection
Start date: 2020-11-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005246578
Unscheduled inspection
Start date: 2020-11-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005205169
Unscheduled inspection
Start date: 2020-10-28, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772004478991
Unscheduled inspection
Start date: 2020-08-07, end date: 2020-09-03, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notice from the developer of the customer. The objectives of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development activities by the person being audited. The subject of the audit is to verify the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources
# 772004490071
Unscheduled inspection
Start date: 2020-08-12, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya truda v gorode Moskve
Purpose of inspection:
# 772004484320
Unscheduled inspection
Start date: 2020-08-12, end date: 2020-08-25, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and requirements for the equipment of the capital construction facility with metering devices for used energy resources
# 772004446919
Unscheduled inspection
Start date: 2020-07-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004465234
Unscheduled inspection
Start date: 2020-07-24, end date: 2020-08-07, duration: 11
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Celi proverki provedenie meropriyatii po kontrolyu v svyazi s vypolneniem programmy proverok Zadachi proverki preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii trebovanii proektnoi dokumentacii zakonodatelstva o gradostroitelnoi deyatelnosti Predmet proverki vypolnenie zastroischikom trebovanii chasti 31 stati 52 Gradostroitelnogo kodeksa sootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov
# 772004464340
Unscheduled inspection
Start date: 2020-07-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004458239
Unscheduled inspection
Start date: 2020-07-16, end date: 2020-07-29, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notice from the developer of the customer. The objectives of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development activities by the person being audited. The subject of the audit is to verify the compliance of the work performed and the building materials used during the construction reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources
# 772004438117
Unscheduled inspection
Start date: 2020-06-22, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772004433713
Unscheduled inspection
Start date: 2020-06-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004379832
Unscheduled inspection
Start date: 2020-03-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004384534
Unscheduled inspection
Start date: 2020-03-31, end date: 2020-04-03, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used
# 772004337648
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-03-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772004352071
Unscheduled inspection
Start date: 2020-03-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004363206
Unscheduled inspection
Start date: 2020-03-18, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772004338332
Unscheduled inspection
Start date: 2020-03-18, end date: 2020-03-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility metering devices for energy resources used
# 772004287127
Unscheduled inspection
Start date: 2020-02-14, end date: 2020-02-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 772004160526
Unscheduled inspection
Start date: 2020-01-09, end date: 2020-01-15, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to check the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements capital construction facility with metering devices for energy resources used
# 772004219979
Unscheduled inspection
Start date: 2020-01-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004200150
Unscheduled inspection
Start date: 2020-01-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771904052047
Unscheduled inspection
Start date: 2019-12-04, end date: 2019-12-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used
# 001904189598
Unscheduled inspection
Start date: 2019-12-23, end date: 2019-12-24, duration: —
Authority: Federalnaya sluzhba po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka
Purpose of inspection: The purpose of the audit is to assess the compliance of information with licensing requirements The task of the audit is to identify suppress and prevent violations of legislation in the field of ensuring sanitary and epidemiological well-being of a person The subject of the audit is compliance with mandatory requirements established by Federal Law No. 99 FZ of May 4, 2011 and Decree of the Government of the Russian Federation dated April 2, 2012 278
# 771904040371
Unscheduled inspection
Start date: 2019-12-02, end date: 2019-12-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to check the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements capital construction facility with metering devices for energy resources used
# 771904071046
Unscheduled inspection
Start date: 2019-12-05, end date: 2019-12-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 771904058336
Unscheduled inspection
Start date: 2019-12-05, end date: 2019-12-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used
# 771904071083
Unscheduled inspection
Start date: 2019-12-06, end date: 2019-12-10, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including energy efficiency requirements and equipment requirements of the capital construction facility construction of metering devices for energy resources used
# 771904069764
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-13, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, the verification of compliance of the parameters of the capital construction facility with the maximum parameters of permitted construction reconstruction of capital construction facilities established by the rules of land use and development documentation on the layout of the territory and mandatory requirements for the parameters of capital construction facilities established by the Urban Planning Code other federal laws
# 771904096138
Unscheduled inspection
Start date: 2019-12-12, end date: 2019-12-19, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of the notification of the developer of the customer's task of verification, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify compliance with the instructions of Mosgosstroynadzor
# 771904098891
Unscheduled inspection
Start date: 2019-12-13, end date: 2020-01-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban development activity by the audited person, subject to verification and compliance with mandatory requirements of regulatory documents
# 771903994412
Unscheduled inspection
Start date: 2019-11-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903933019
Unscheduled inspection
Start date: 2019-11-01, end date: 2019-11-15, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to check the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements capital construction facility with metering devices for energy resources used
# 771903924923
Unscheduled inspection
Start date: 2019-11-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903799150
Unscheduled inspection
Start date: 2019-10-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903856631
Unscheduled inspection
Start date: 2019-10-21, end date: 2019-11-01, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to check the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements capital construction facility with metering devices for energy resources used
# 771903735050
Unscheduled inspection
Start date: 2019-10-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903809151
Unscheduled inspection
Start date: 2019-10-04, end date: 2019-10-08, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: provedenie meropriyatii po kontrolyu v svyazi s proverkoi vypolneniya predpisaniyaZadachi proverkipreduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii trebovanii proektnoi dokumentacii zakonodatelstva o gradostroitelnoi deyatelnostiPredmet proverkiproverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom
# 771903869731
Unscheduled inspection
Start date: 2019-10-16, end date: 2019-11-06, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to check the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements capital construction facility with metering devices for energy resources used
# 771903858000
Unscheduled inspection
Start date: 2019-10-14, end date: 2019-10-25, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for energy resources used
# 771903577423
Unscheduled inspection
Start date: 2019-09-12, end date: 2019-09-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit is to carry out control measures in connection with the receipt of a notification from the developer of the customer of the audit task to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development activity by the audited person. The subject of the audit is to verify the elimination of violations specified in the order issued by Mosgosstroynadzor
# 771903643807
Unscheduled inspection
Start date: 2019-09-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903663822
Unscheduled inspection
Start date: 2019-09-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 771903627490
Unscheduled inspection
Start date: 2019-09-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803470272
Unscheduled inspection
Start date: 2019-08-02, end date: 2019-08-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803458904
Unscheduled inspection
Start date: 2019-07-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803457304
Unscheduled inspection
Start date: 2019-07-15, end date: 2019-07-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803463858
Unscheduled inspection
Start date: 2019-07-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803449162
Unscheduled inspection
Start date: 2019-07-01, end date: 2019-07-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77190803452513
Unscheduled inspection
Start date: 2019-07-09, end date: 2019-07-15, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803435614
Unscheduled inspection
Start date: 2019-06-13, end date: 2019-06-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the fulfillment by the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code is the compliance of the work and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for used energy resources
# 77190803427601
Unscheduled inspection
Start date: 2019-06-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803420141
Unscheduled inspection
Start date: 2019-05-24, end date: 2019-05-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803422347
Unscheduled inspection
Start date: 2019-05-27, end date: 2019-05-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with checking the fulfillment of the prescriptionthe tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development activity by the audited person. The purpose of the audit is to verify the elimination of violations specified in the prescription issued by Mosgosstroynadzor
# 77190803386848
Unscheduled inspection
Start date: 2019-04-04, end date: 2019-04-12, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with checking the fulfillment of the prescriptionthe tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development activity by the audited person. The purpose of the audit is to verify the elimination of violations specified in the prescription issued by Mosgosstroynadzor
# 77190803408038
Unscheduled inspection
Start date: 2019-04-29, end date: 2019-05-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit is to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban development activity by the audited person. The purpose of the audit is to verify the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and requirements for the equipment of the capital construction facility with metering devices for used energy resources
# 77190803370382
Unscheduled inspection
Start date: 2019-03-20, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77190803377024
Unscheduled inspection
Start date: 2019-03-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803383115
Unscheduled inspection
Start date: 2019-03-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803323322
Unscheduled inspection
Start date: 2019-01-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77190803313771
Unscheduled inspection
Start date: 2019-01-15, end date: 2019-01-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: elimination of violations specified in the order issued by Mosgosstroynadzor Prevention detection and suppression of violations of technical regulations and project documentation committed by the person being checked verification of elimination of violations specified in the order issued by Mosgosstroynadzor
# 77190803316820
Unscheduled inspection
Start date: 2019-01-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803305590
Unscheduled inspection
Start date: 2018-12-24, end date: 2018-12-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803286591
Unscheduled inspection
Start date: 2018-11-26, end date: 2018-12-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803284717
Unscheduled inspection
Start date: 2018-11-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803284491
Unscheduled inspection
Start date: 2018-11-28, end date: 2018-12-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803269192
Unscheduled inspection
Start date: 2018-11-12, end date: 2018-11-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803257605
Unscheduled inspection
Start date: 2018-10-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803246743
Unscheduled inspection
Start date: 2018-10-09, end date: 2018-10-19, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803266078
Unscheduled inspection
Start date: 2018-10-30, end date: 2018-10-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803254340
Unscheduled inspection
Start date: 2018-10-16, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77180803224459
Unscheduled inspection
Start date: 2018-09-14, end date: 2018-09-21, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803214639
Unscheduled inspection
Start date: 2018-08-27, end date: 2018-08-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803215875
Unscheduled inspection
Start date: 2018-08-28, end date: 2018-08-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803193703
Unscheduled inspection
Start date: 2018-08-06, end date: 2018-08-08, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803182444
Unscheduled inspection
Start date: 2018-07-17, end date: 2018-07-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803185669
Unscheduled inspection
Start date: 2018-07-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803185668
Unscheduled inspection
Start date: 2018-07-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803164482
Unscheduled inspection
Start date: 2018-06-19, end date: 2018-07-04, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803170458
Unscheduled inspection
Start date: 2018-06-28, end date: 2018-07-02, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803159222
Unscheduled inspection
Start date: 2018-06-20, end date: 2018-06-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803169738
Unscheduled inspection
Start date: 2018-06-26, end date: 2018-06-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803136713
Unscheduled inspection
Start date: 2018-05-10, end date: 2018-05-25, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803135808
Unscheduled inspection
Start date: 2018-05-11, end date: 2018-05-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803132657
Unscheduled inspection
Start date: 2018-05-08, end date: 2018-05-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803139633
Unscheduled inspection
Start date: 2018-05-21, end date: 2018-05-25, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803126129
Unscheduled inspection
Start date: 2018-04-19, end date: 2018-04-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803123004
Unscheduled inspection
Start date: 2018-04-13, end date: 2018-04-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803129378
Unscheduled inspection
Start date: 2018-04-20, end date: 2018-04-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803102588
Unscheduled inspection
Start date: 2018-03-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803106268
Unscheduled inspection
Start date: 2018-03-21, end date: 2018-03-30, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803102834
Unscheduled inspection
Start date: 2018-03-22, end date: 2018-03-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 001800205198
Unscheduled inspection
Start date: 2018-03-07, end date: 2018-03-12, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Compliance with the requirements of the legislation on urban planning during the construction and reconstruction of a capital construction facility
# 77180803087746
Unscheduled inspection
Start date: 2018-02-13, end date: 2018-02-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 001800103960
Unscheduled inspection
Start date: 2018-02-06, end date: 2018-02-27, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Compliance with the requirements of the legislation on urban planning during the construction and reconstruction of a capital construction facility
# 77180803087243
Unscheduled inspection
Start date: 2018-02-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803087503
Unscheduled inspection
Start date: 2018-02-08, end date: 2018-02-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803059296
Unscheduled inspection
Start date: 2018-01-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803081951
Unscheduled inspection
Start date: 2018-01-17, end date: 2018-01-19, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803065250
Unscheduled inspection
Start date: 2018-01-17, end date: 2018-01-19, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77180803081052
Unscheduled inspection
Start date: 2018-01-22, end date: 2018-01-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803079469
Unscheduled inspection
Start date: 2018-01-22, end date: 2018-01-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77180803065916
Unscheduled inspection
Start date: 2018-01-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77180803065915
Unscheduled inspection
Start date: 2018-01-22, end date: 2018-01-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170802989844
Unscheduled inspection
Start date: 2017-12-08, end date: 2017-12-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170802954029
Unscheduled inspection
Start date: 2017-12-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802939783
Unscheduled inspection
Start date: 2017-12-05, end date: 2017-12-07, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170803026787
Unscheduled inspection
Start date: 2017-12-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 00170802913558
Unscheduled inspection
Start date: 2017-12-04, end date: 2017-12-11, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 28082017 g 460G3327G19
# 77170803002226
Unscheduled inspection
Start date: 2017-12-18, end date: 2017-12-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170803001806
Unscheduled inspection
Start date: 2017-12-18, end date: 2017-12-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170803012887
Unscheduled inspection
Start date: 2017-12-19, end date: 2017-12-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802996079
Unscheduled inspection
Start date: 2017-12-19, end date: 2017-12-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170803008380
Unscheduled inspection
Start date: 2017-12-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802988997
Unscheduled inspection
Start date: 2017-12-12, end date: 2017-12-22, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 00170802791908
Unscheduled inspection
Start date: 2017-11-07, end date: 2017-11-16, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance by a legal entity with the requirements of legislation on urban planning activities during the construction and reconstruction of capital construction facilities
# 77170802800244
Unscheduled inspection
Start date: 2017-11-02, end date: 2017-11-10, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170802800243
Unscheduled inspection
Start date: 2017-11-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802884784
Unscheduled inspection
Start date: 2017-11-20, end date: 2017-11-20, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802884723
Unscheduled inspection
Start date: 2017-11-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170802839837
Unscheduled inspection
Start date: 2017-11-13, end date: 2017-11-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 00170802663402
Unscheduled inspection
Start date: 2017-10-06, end date: 2017-10-10, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 12 iyulya 2017 g 358G3327H04
# 77170802734133
Unscheduled inspection
Start date: 2017-10-13, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77170802530502
Unscheduled inspection
Start date: 2017-09-18, end date: 2017-09-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170802628784
Unscheduled inspection
Start date: 2017-09-27, end date: 2017-10-09, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170802615902
Unscheduled inspection
Start date: 2017-09-27, end date: 2017-09-29, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170802590658
Unscheduled inspection
Start date: 2017-09-25, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77170802616324
Unscheduled inspection
Start date: 2017-09-26, end date: 2017-10-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701889942
Unscheduled inspection
Start date: 2017-08-17, end date: 2017-08-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701889931
Unscheduled inspection
Start date: 2017-08-17, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77170701884177
Unscheduled inspection
Start date: 2017-08-11, end date: 2017-08-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 00170701883228
Unscheduled inspection
Start date: 2017-08-11, end date: 2017-08-15, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance by a legal entity with the requirements of legislation on urban planning activities during the construction and reconstruction of capital construction facilities
# 77170701903266
Unscheduled inspection
Start date: 2017-08-24, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 00170701835042
Unscheduled inspection
Start date: 2017-08-01, end date: 2017-08-28, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance by a legal entity with the requirements of legislation on urban planning activities during the construction and reconstruction of capital construction facilities
# 77170701803099
Unscheduled inspection
Start date: 2017-07-13, end date: 2017-07-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 00170701743775
Unscheduled inspection
Start date: 2017-07-10, end date: 2017-07-12, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: kontrol ispolneniya predpisaniya ot 14042017 169G3327H04
# 77170701830873
Unscheduled inspection
Start date: 2017-07-27, end date: 2017-07-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701830874
Unscheduled inspection
Start date: 2017-07-26, end date: 2017-07-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701710998
Unscheduled inspection
Start date: 2017-07-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701665687
Unscheduled inspection
Start date: 2017-06-13, end date: 2017-06-28, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701683765
Unscheduled inspection
Start date: 2017-06-09, end date: 2017-06-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701683734
Unscheduled inspection
Start date: 2017-06-09, end date: 2017-06-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701674505
Unscheduled inspection
Start date: 2017-06-06, end date: 2017-06-08, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701694391
Unscheduled inspection
Start date: 2017-06-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 00170701575545
Unscheduled inspection
Start date: 2017-05-10, end date: 2017-05-30, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance by a legal entity with the requirements of legislation on urban planning activities during the construction and reconstruction of capital construction facilities
# 77170701636850
Unscheduled inspection
Start date: 2017-05-25, end date: 2017-05-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701636848
Unscheduled inspection
Start date: 2017-05-25, end date: 2017-05-31, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701588815
Unscheduled inspection
Start date: 2017-05-02, end date: 2017-05-05, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701530870
Unscheduled inspection
Start date: 2017-04-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701585179
Unscheduled inspection
Start date: 2017-04-28, end date: 2017-05-05, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701585177
Unscheduled inspection
Start date: 2017-04-28, end date: 2017-05-05, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701571173
Unscheduled inspection
Start date: 2017-04-25, end date: 2017-05-05, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701486090
Unscheduled inspection
Start date: 2017-04-03, end date: 2017-04-14, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701448282
Unscheduled inspection
Start date: 2017-03-13, end date: 2017-04-06, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701445247
Unscheduled inspection
Start date: 2017-03-13, end date: 2017-03-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701445218
Unscheduled inspection
Start date: 2017-03-13, end date: 2017-03-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701445073
Unscheduled inspection
Start date: 2017-03-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 00170701412788
Unscheduled inspection
Start date: 2017-03-13, end date: 2017-03-14, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 08022017 g 45G3327vno
# 77170701432217
Unscheduled inspection
Start date: 2017-03-07, end date: 2017-03-10, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 00170701476281
Unscheduled inspection
Start date: 2017-03-28, end date: 2017-04-17, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance by a legal entity with the requirements of legislation on urban planning activities during the construction and reconstruction of capital construction facilities
# 77170701485008
Unscheduled inspection
Start date: 2017-03-23, end date: 2017-03-24, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 00170701352503
Unscheduled inspection
Start date: 2017-02-08, end date: 2017-02-13, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 15122016 g 620G3327K43 vnpp
# 00170701352287
Unscheduled inspection
Start date: 2017-02-07, end date: 2017-02-08, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 27102016 g 546G3327vno
# 77170701345257
Unscheduled inspection
Start date: 2017-02-01, end date: 2017-02-17, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701314250
Unscheduled inspection
Start date: 2017-01-17, end date: 2017-01-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77170701301390
Unscheduled inspection
Start date: 2017-01-17, end date: 2017-02-06, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701333058
Unscheduled inspection
Start date: 2017-01-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77170701333057
Unscheduled inspection
Start date: 2017-01-30, end date: 2017-02-06, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77170701330549
Unscheduled inspection
Start date: 2017-01-26, end date: 2017-01-27, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 00160701232296
Unscheduled inspection
Start date: 2016-12-13, end date: 2016-12-15, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 17012016 g 3G3327K43
# 77160701213039
Unscheduled inspection
Start date: 2016-12-08, end date: 2016-12-16, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor
# 77160701213051
Unscheduled inspection
Start date: 2016-12-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160701193377
Unscheduled inspection
Start date: 2016-12-02, end date: 2016-12-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77160701162264
Unscheduled inspection
Start date: 2016-11-28, end date: 2016-12-09, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77160701162248
Unscheduled inspection
Start date: 2016-11-28, end date: 2016-12-09, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used
# 77160701065601
Unscheduled inspection
Start date: 2016-11-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 00160701025135
Unscheduled inspection
Start date: 2016-10-17, end date: 2016-10-27, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The list of documents required to be submitted in order to achieve the goals and objectives of the audit
# 77160701028312
Unscheduled inspection
Start date: 2016-10-19, end date: 2016-10-26, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu ustranenie narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom na osnovanii istecheniya sroka ispolneniya yuridicheskim licom individualnym predprinimatelem vydannogo organom gosudarstvennogo stroitelnogo nadzora predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovaniiZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya proverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom 953016 ot 08092016
# 77160700993315
Unscheduled inspection
Start date: 2016-10-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 77160700124244
Unscheduled inspection
Start date: 2016-09-01, end date: 2016-09-19, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: To establish that this audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program, the objectives of this audit are to prevent identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipment of the capital construction facility with metering devices for energy resources used
# 77160700152572
Unscheduled inspection
Start date: 2016-09-08, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 77160700053605
Unscheduled inspection
Start date: 2016-09-12, end date: 2016-09-23, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: ustranenie narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom na osnovanii istecheniya sroka ispolneniya yuridicheskim licom individualnym predprinimatelem vydannogo organom gosudarstvennogo stroitelnogo nadzora predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovaniiZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentaciiustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom 674216 ot 19072016 787516 ot 18082016
# 77160601743417
Unscheduled inspection
Start date: 2016-07-22, end date: 2016-08-18, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: sootvetstvie obekta kapitalnogo stroitelstva trebovaniyam tehnicheskih reglamentov i proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam snaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov na osnovanii postupivshego izvescheniya ot zastroischika zakazchika ili lica osuschestvlyayuschego stroitelstvo ob okonchanii stroitelstvaZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentacii vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov
# 77160601715038
Unscheduled inspection
Start date: 2016-07-11, end date: 2016-07-15, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu ustranenie narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom na osnovanii istecheniya sroka ispolneniya yuridicheskim licom individualnym predprinimatelem vydannogo organom gosudarstvennogo stroitelnogo nadzora predpisaniya ob ustranenii vyyavlennogo narusheniya obyazatelnyh trebovaniiZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh proveryaemym licom narushenii tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya proverka ustraneniya narushenii ukazannyh v predpisanii vydannom Mosgosstroinadzorom 703316 ot 28062016